040001-MASONRY_WORK_FSB.pdf

PDF 56 KB Posted

Attached to
Chicopee Armory Renovations Sub-Contractor Bids
Solicitation number
S125144-vCurrent
Issued by
Hampden County, Massachusetts

About this file

This document is a scope of work for the masonry work required as part of the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. The work is described in various specification sections and contract drawings, and includes maintenance of unit masonry, maintenance of stone assemblies, and unit masonry work. The project is issued for bid, with a bid submission deadline of 05/20/11. The work of this filed sub-bid is described in sections 040120, 041400, and 042000, as well as on contract drawings GI001, AE101, and AE201. Alternates are referenced in section 012300.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements, or other salient commercial information. It focuses solely on the technical requirements and scope of the masonry work for this state and local contract opportunity.

View the file

Other files

File Type Posted
265100_Lighting_Fixtures.pdf PDF
260001-ELECTRICAL_FSB.pdf PDF
220529_Hangers_and_Supports_JPB.pdf PDF
232123_hydronic_pumps.pdf PDF
015000_FL-TEMPORARY_FACILITIES_AND_CONTROLS.pdf PDF
M-601-10090.pdf PDF
AD121-10090.pdf PDF
M-651-10090.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
Specifications_Volume_2_Cover.pdf PDF
ES101-10090.pdf PDF
235216_condensing_boilers.pdf PDF
MD101-10090.pdf PDF
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
Prevailing_Wage_Chicopee_20110531-011.pdf PDF
C-100_CIVIL_SITE_PLAN.pdf PDF
260530_Electrical_Acceptance_Testing.pdf PDF
017839_FL-PROJECT_RECORD_DOCUMENTS.pdf PDF
017419_FL-CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL.pdf PDF
090005-RESILIENT_FLOORS_FSB.pdf PDF
E-001-10090.pdf PDF
220500_plumbing_materials_JPB.pdf PDF
230719_hvac_pipe_ins.pdf PDF
087100_FL-DOOR_HARDWARE_v1.pdf PDF
EFT_FORM.pdf PDF
EL102-10090.pdf PDF
MIL_general_conditions_contract_Chicopee2011_Rev01.doc DOC document
262416_Panelboards.pdf PDF
033000_FL-CAST-IN-PLACE_CONCRETE_MAC.pdf PDF
238900_Louvers_and_Vents.pdf PDF
Specifications_Table_of_Contents.pdf PDF
093000_FL-TILING_v1.pdf PDF
096513_FL-RESILIENT_BASE_AND_ACCESSORIES.pdf PDF
GI001-10090.pdf PDF
233300_duct_accessories.pdf PDF
230500_mech_materials.pdf PDF
231123_fuel_gas_piping.pdf PDF
01811313_FL-SUSTAINABLE_DESIGN_REQUIREMENTS-LEED_FOR_NEW_CONSTRUCTION_AND_MAJOR_RENOVATIONS.pdf PDF
232300_refrigerant_piping.pdf PDF
262200_Low_Voltage_Transformers.pdf PDF
MIL_Invitation_to_Bid_Chicopee2011.doc DOC document
230993_seq_of_operations.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
230593_testing_adjusting_balancing.pdf PDF
AE311-10090.pdf PDF
102800_FL-TOILET_BATH_AND_LAUNDRY_ACCESSORIES_v1.pdf PDF
M-001-10090.pdf PDF
075423_FL-THERMOPLASTIC_POLYOLEFIN_TPO_ROOFING_v1.pdf PDF
SF501-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985010

CHICOPEE, MASSACHUSETTS ISSUED FOR BID – 05/20/11

10090 MASONRY WORK 040001 - 1

SECTION 040001

MASONRY WORK

(Filed Sub-Bid Required)

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General provisions of the Contract, including General and Supplementary Conditions and

Division 1 Specification Sections, apply to this Section.

B. Time, manner and requirements for submitting sub-bids is as described in Massachusetts

Military Division provided Division 0 documents.

1.2 SUMMARY

A. Work Included: Provide labor, materials and equipment necessary to complete the work of this filed sub-bid. Work is described by but not limited to the following specification sections and contract drawings.

B. Reference Specifications: The Work of the Filed-Sub is described in the following Sections:

1. Section 040120, “Maintenance of Unit Masonry”

2. Section 041400, “Maintenance of Stone Assemblies”

3. Section 042000, “Unit Masonry”

C. Reference Drawings: The Work of this Filed Sub-Bid is shown on the following Contract

Drawings: GI001, AE101, AE201.

1.3 ALTERNATES

A. Refer to Drawings and Section 012300, “Alternates” for requirements.

PART 2 - PRODUCTS – NOT USED

PART 3 - EXECUTION – NOT USED

END OF SECTION 040001

File details come from the government source that posted it. Updated .