232123_hydronic_pumps.pdf

PDF 69 KB Posted

Attached to
Chicopee Armory Renovations Sub-Contractor Bids
Solicitation number
S125144-vCurrent
Issued by
Hampden County, Massachusetts

About this file

This document is a specification for the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. It includes requirements for close-coupled, in-line centrifugal pumps and automatic condensate pump units. The project involves the installation and testing of these hydronic pumps, and requires compliance with related mechanical specifications. Manufacturer information, pump construction details, and installation and startup procedures are provided. The project is being bid, with a bid issue date of 05/20/11.

The specification indicates that the project is subject to general and supplementary conditions, and that the work is to be performed in accordance with the requirements of Divisions 1, 23, and 26. Pump manufacturers, models, and accessories are specified, and details on required submittals, quality assurance, delivery, storage, handling, and coordination are included. Pricing, funding sources, set-asides, or other commercial terms are not provided in this technical specification document.

View the file

Other files

File Type Posted
265100_Lighting_Fixtures.pdf PDF
260001-ELECTRICAL_FSB.pdf PDF
220529_Hangers_and_Supports_JPB.pdf PDF
015000_FL-TEMPORARY_FACILITIES_AND_CONTROLS.pdf PDF
M-601-10090.pdf PDF
AD121-10090.pdf PDF
M-651-10090.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
040001-MASONRY_WORK_FSB.pdf PDF
Specifications_Volume_2_Cover.pdf PDF
ES101-10090.pdf PDF
235216_condensing_boilers.pdf PDF
MD101-10090.pdf PDF
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
Prevailing_Wage_Chicopee_20110531-011.pdf PDF
C-100_CIVIL_SITE_PLAN.pdf PDF
260530_Electrical_Acceptance_Testing.pdf PDF
017839_FL-PROJECT_RECORD_DOCUMENTS.pdf PDF
017419_FL-CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL.pdf PDF
090005-RESILIENT_FLOORS_FSB.pdf PDF
E-001-10090.pdf PDF
220500_plumbing_materials_JPB.pdf PDF
230719_hvac_pipe_ins.pdf PDF
087100_FL-DOOR_HARDWARE_v1.pdf PDF
EFT_FORM.pdf PDF
EL102-10090.pdf PDF
MIL_general_conditions_contract_Chicopee2011_Rev01.doc DOC document
262416_Panelboards.pdf PDF
033000_FL-CAST-IN-PLACE_CONCRETE_MAC.pdf PDF
238900_Louvers_and_Vents.pdf PDF
Specifications_Table_of_Contents.pdf PDF
093000_FL-TILING_v1.pdf PDF
096513_FL-RESILIENT_BASE_AND_ACCESSORIES.pdf PDF
GI001-10090.pdf PDF
233300_duct_accessories.pdf PDF
230500_mech_materials.pdf PDF
231123_fuel_gas_piping.pdf PDF
01811313_FL-SUSTAINABLE_DESIGN_REQUIREMENTS-LEED_FOR_NEW_CONSTRUCTION_AND_MAJOR_RENOVATIONS.pdf PDF
232300_refrigerant_piping.pdf PDF
262200_Low_Voltage_Transformers.pdf PDF
MIL_Invitation_to_Bid_Chicopee2011.doc DOC document
230993_seq_of_operations.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
230593_testing_adjusting_balancing.pdf PDF
AE311-10090.pdf PDF
102800_FL-TOILET_BATH_AND_LAUNDRY_ACCESSORIES_v1.pdf PDF
M-001-10090.pdf PDF
075423_FL-THERMOPLASTIC_POLYOLEFIN_TPO_ROOFING_v1.pdf PDF
SF501-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101

CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11

10090 HYDRONIC PUMPS 232123-1

SECTION 232123

HYDRONIC PUMPS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification Sections, apply to this Section.

B. The requirements of Section 230100, “Basic Mechanical Requirements” apply to work defined by this Section.

C. The requirements of Section 230500, “Basic Mechanical Materials and Methods” apply to work defined by the Section.

1.2 SUMMARY

A. This Section includes the following:

1. Close-coupled, in-line centrifugal pumps.

2. Automatic condensate pump units.

1.3 DEFINITIONS

A. Buna-N: Nitrile rubber.

B. EPT: Ethylene propylene terpolymer.

1.4 SUBMITTALS

A. Product Data: Include certified performance curves and rated capacities, operating characteristics, furnished specialties, final impeller dimensions, and accessories for each type of product indicated. Indicate pump's operating point on curves.

B. Shop Drawings: Show pump layout and connections. Include setting drawings with templates for installing foundation and anchor bolts and other anchorages.

1. Wiring Diagrams: Power, signal, and control wiring.

C. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

10090 HYDRONIC PUMPS 232123-2

1.5 QUALITY ASSURANCE

A. Source Limitations: Obtain hydronic pumps through one source from a single manufacturer.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

C. UL Compliance: Comply with UL 778 for motor-operated water pumps.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Manufacturer's Preparation for Shipping: Clean flanges and exposed machined metal surfaces and treat with anticorrosion compound after assembly and testing. Protect flanges, pipe openings, and nozzles with wooden flange covers or with screwed-in plugs.

B. Store pumps in dry location.

C. Retain protective covers for flanges and protective coatings during storage.

D. Protect bearings and couplings against damage from sand, grit, and other foreign matter.

E. Comply with pump manufacturer's written rigging instructions.

1.7 COORDINATION

A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Division 3.

1.8 EXTRA MATERIALS

A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Mechanical Seals: One mechanical seal(s) for each pump on the project.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Close-coupled, in-line centrifugal pumps

a. Armstrong Pumps Inc.

b. Aurora Pump; Division of Pentair Pump Group.

c. Bell & Gossett; Div. of ITT Industries.

http://www.specagent.com/LookUp/?ulid=3386&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812387&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456823748&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456823750&mf=04&src=wd

10090 HYDRONIC PUMPS 232123-3

d. Burks Pumps; Div. of Crane Pumps & Systems.

e. Crane Pumps & Systems.

f. Demming Div.; Crane Co.

g. Flowserve Corporation.

h. Grundfos Pumps Corporation.

i. Little Giant Pump Co.; Subsidiary of Tecumseh Products Co.

j. Mepco, LLC.

k. PACO Pumps.

l. Patterson Pump Co.; a subsidiary of the Gorman-Rupp Co.

m. Peerless Pump Company.

n. TACO Incorporated.

o. Thrush Company Inc.

p.

2. Automatic condensate pump units

a. Aurora Pump; Division of Pentair Pump Group.

b. Beckett Corporation.

c. Flowserve Corporation; Div. of Ingersoll-Dresser Pumps.

d. Hartell Pumps Div.; Milton Roy Co.

e. Little Giant Pump Co.

f. Mepco, LLC.

g.

2.2 CLOSE-COUPLED, IN-LINE CENTRIFUGAL PUMPS

A. [Description: Factory-assembled and -tested, centrifugal, overhung-impeller, close-coupled, in-line pump as defined in HI 1.1-1.2 and HI 1.3; designed for installation with pump and motor shafts mounted horizontally or vertically. Rate pump for 125-psig maximum working pressure and a continuous water temperature of 200 deg F .

B. Pump Construction:

1. Casing: Radially split, cast iron, with replaceable bronze wear rings, threaded gage tappings at inlet and outlet, and threaded union end connections.

2. Impeller: ASTM B 584, cast bronze; statically and dynamically balanced, keyed to shaft, and secured with a locking cap screw. Trim impeller to match specified performance.

3. Pump Shaft: Steel, with copper-alloy shaft sleeve .

4. Mechanical Seal: Carbon rotating ring against a ceramic seat held by a stainless-steel spring, and Buna-N bellows and gasket. Include water slinger on shaft between motor and seal.

5. Pump Bearings: Permanently lubricated ball bearings .

C. Motor: Single speed, with permanently lubricated ball bearings, unless otherwise indicated;

and rigidly mounted to pump casing. Comply with requirements in Division 23 Section

"Motors."

http://www.specagent.com/LookUp/?uid=123456812388&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812389&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812390&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812391&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812392&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456823752&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812393&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812394&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812395&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=3395&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812458&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456823835&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812459&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456812460&mf=04&src=wd

10090 HYDRONIC PUMPS 232123-4

2.3 AUTOMATIC CONDENSATE PUMP UNITS

A. Description: Packaged units with corrosion-resistant pump, plastic tank with cover, and automatic controls. Include factory- or field-installed check valve and a 72-inch- minimum, electrical power cord with plug.

2.4 PUMP SPECIALTY FITTINGS

A. Suction Diffuser: Angle pattern, 175-psig pressure rating, cast -iron body and end cap, pump-inlet fitting; with bronze startup and bronze or stainless-steel permanent strainers; bronze or stainless-steel straightening vanes; drain plug; and factory-fabricated support.

B. Triple-Duty Valve: Angle or straight pattern, 175-psig pressure rating, cast -iron body, pump-discharge fitting; with drain plug and bronze-fitted shutoff, balancing, and check valve features.

Brass gage ports with integral check valve, and orifice for flow measurement.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine equipment foundations and anchor-bolt locations for compliance with requirements for installation tolerances and other conditions affecting performance of work.

B. Examine roughing-in for piping systems to verify actual locations of piping connections before pump installation.

C. Examine foundations and inertia bases for suitable conditions where pumps are to be installed.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PUMP INSTALLATION

A. Comply with HI 1.4 .

B. Install pumps with access for periodic maintenance including removal of motors, impellers, couplings, and accessories.

C. Independently support pumps and piping so weight of piping is not supported by pumps and weight of pumps is not supported by piping.

D. Install continuous-thread hanger rods and spring hangers of sufficient size to support pump weight. Vibration isolation devices are specified in Division 23 Section "Mechanical Vibration and Seismic Controls." Fabricate brackets or supports as required. Hanger and support materials are specified in Division 23 Section "Hangers and Supports."

E. Suspend vertically mounted, in-line centrifugal pumps independent of piping. Install pumps with motor and pump shafts vertical. Use continuous-thread hanger rods and spring hangers of sufficient size to support pump weight. Vibration isolation devices are specified in Division 23

10090 HYDRONIC PUMPS 232123-5

Section "Mechanical Vibration and Seismic Controls." Hanger and support materials are specified in Division 23, Section 230529 "Hangers and Supports."

F. Automatic Condensate Pump Units: Install units for collecting condensate and extend to open drain.

3.3 ALIGNMENT

A. Comply with pump and coupling manufacturers' written instructions.

3.4 CONNECTIONS

A. Piping installation requirements are specified in other Division 23 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to machine to allow service and maintenance.

C. Connect piping to pumps. Install valves that are same size as piping connected to pumps.

D. Install suction and discharge pipe sizes equal to or greater than diameter of pump nozzles.

E. Install triple-duty valve on discharge side of pumps.

F. Install Y-type strainer and shutoff valve on suction side of pumps.

G. Install flexible connectors on suction and discharge sides of base-mounted pumps between pump casing and valves.

H. Install pressure gages on pump suction and discharge, at integral pressure-gage tapping, or install single gage with multiple input selector valve.

I. Install check valve and gate or ball valve on each condensate pump unit discharge.

J. Install electrical connections for power, controls, and devices.

K. Ground equipment according to Division 26 Section "Grounding and Bonding."

L. Connect wiring according to Division 26 Section "Conductors and Cables."

3.5 STARTUP SERVICE

A. Engage a factory-authorized service representative to perform startup service.

1. Complete installation and startup checks according to manufacturer's written instructions.

2. Check piping connections for tightness.

3. Clean strainers on suction piping.

4. Perform the following startup checks for each pump before starting:

a. Verify bearing lubrication.

10090 HYDRONIC PUMPS 232123-6

b. Verify that pump is free to rotate by hand and that pump for handling hot liquid is free to rotate with pump hot and cold. If pump is bound or drags, do not operate until cause of trouble is determined and corrected.

c. Verify that pump is rotating in the correct direction.

5. Prime pump by opening suction valves and closing drains, and prepare pump for operation.

6. Start motor.

7. Open discharge valve slowly.

3.6 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain hydronic pumps. Refer to Division 1 Section "Closeout

Procedures ."

END OF SECTION 232123

File details come from the government source that posted it. Updated .