This document is a specification for the basic mechanical materials and methods for the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. It provides details on piping, equipment, demolition, installation, and other related requirements for the mechanical systems as part of this renovation project. The project is identified as MMD Project No. 985101 and was issued for bid on 05/20/11. The specification covers a range of mechanical materials and equipment, including piping, fittings, valves, insulation, and demolition work. It also includes requirements for installation, cutting and patching, and other common mechanical installation procedures.

The specification outlines product requirements, testing and quality assurance standards, and coordination requirements with other trades. Pricing and funding details are not provided, but this appears to be a standard technical specification for the mechanical systems scope of work as part of the overall Chicopee Armory Rehabilitation project.

View the file

Other files

File Type Posted
265100_Lighting_Fixtures.pdf PDF
260001-ELECTRICAL_FSB.pdf PDF
220529_Hangers_and_Supports_JPB.pdf PDF
232123_hydronic_pumps.pdf PDF
015000_FL-TEMPORARY_FACILITIES_AND_CONTROLS.pdf PDF
M-601-10090.pdf PDF
AD121-10090.pdf PDF
M-651-10090.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
040001-MASONRY_WORK_FSB.pdf PDF
Specifications_Volume_2_Cover.pdf PDF
ES101-10090.pdf PDF
235216_condensing_boilers.pdf PDF
MD101-10090.pdf PDF
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
Prevailing_Wage_Chicopee_20110531-011.pdf PDF
C-100_CIVIL_SITE_PLAN.pdf PDF
260530_Electrical_Acceptance_Testing.pdf PDF
017839_FL-PROJECT_RECORD_DOCUMENTS.pdf PDF
017419_FL-CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL.pdf PDF
090005-RESILIENT_FLOORS_FSB.pdf PDF
E-001-10090.pdf PDF
220500_plumbing_materials_JPB.pdf PDF
230719_hvac_pipe_ins.pdf PDF
087100_FL-DOOR_HARDWARE_v1.pdf PDF
EFT_FORM.pdf PDF
EL102-10090.pdf PDF
MIL_general_conditions_contract_Chicopee2011_Rev01.doc DOC document
262416_Panelboards.pdf PDF
033000_FL-CAST-IN-PLACE_CONCRETE_MAC.pdf PDF
238900_Louvers_and_Vents.pdf PDF
Specifications_Table_of_Contents.pdf PDF
093000_FL-TILING_v1.pdf PDF
096513_FL-RESILIENT_BASE_AND_ACCESSORIES.pdf PDF
GI001-10090.pdf PDF
233300_duct_accessories.pdf PDF
231123_fuel_gas_piping.pdf PDF
01811313_FL-SUSTAINABLE_DESIGN_REQUIREMENTS-LEED_FOR_NEW_CONSTRUCTION_AND_MAJOR_RENOVATIONS.pdf PDF
232300_refrigerant_piping.pdf PDF
262200_Low_Voltage_Transformers.pdf PDF
MIL_Invitation_to_Bid_Chicopee2011.doc DOC document
230993_seq_of_operations.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
230593_testing_adjusting_balancing.pdf PDF
AE311-10090.pdf PDF
102800_FL-TOILET_BATH_AND_LAUNDRY_ACCESSORIES_v1.pdf PDF
M-001-10090.pdf PDF
075423_FL-THERMOPLASTIC_POLYOLEFIN_TPO_ROOFING_v1.pdf PDF
SF501-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101

CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-1

SECTION 230500

BASIC MECHANICAL MATERIALS AND METHODS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification Sections, apply to this Section.

B. The requirements of Section 230100, “Basic Mechanical Requirements” apply to work defined by this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Piping materials and installation instructions common to most piping systems.

2. Transition fittings.

3. Dielectric fittings.

4. Mechanical sleeve seals.

5. Sleeves.

6. Escutcheons.

7. Grout.

8. Mechanical demolition.

9. Equipment installation requirements common to equipment sections.

10. Painting and finishing.

11. Supports and anchorages.

12. Access panels and doors.

13. Motors for Mechanical Equipment

B. Related Sections include the following:

1. Division 7 Section, “Firestopping.”

2. Division 8 Section, “Access Panels.”

3. Division 9 Section, “Painting.”

1.3 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-2

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures.

Examples include installations within unheated shelters.

F. The following are industry abbreviations for plastic materials:

1. ABS: Acrylonitrile-butadiene-styrene plastic.

2. CPVC: Chlorinated polyvinyl chloride plastic.

3. PE: Polyethylene plastic.

4. PVC: Polyvinyl chloride plastic.

G. The following are industry abbreviations for rubber materials:

1. EPDM: Ethylene-propylene-diene terpolymer rubber.

2. NBR: Acrylonitrile-butadiene rubber.

1.4 SUBMITTALS

A. General: See Division 1 for general submittal and product substitution requirements.

B. Pre-Construction Submittals: Submit the following items prior to commencing with installations.

1. Product Data: For transition fittings, dielectric fittings, mechanical sleeve seals, escutcheons.

2. Welding certificates.

1.5 QUALITY ASSURANCE

A. Steel Support Welding: Qualify processes and operators according to AWS D1.1/D1.1M, "Structural Welding Code--Steel."

B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure

Vessel Code: Section IX, "Welding and Brazing Qualifications."

1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."

2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.

C. Electrical Characteristics for Mechanical Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-3

minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.

B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.

1.7 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for mechanical installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Coordinate requirements for access panels and doors for mechanical items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Division 8

Section "Access Doors and Frames."

1. Provide access panels per the requirements of Division 8 Sections. Installation of the panels to be as directed by the General Contractor / Construction Manager.

D. Coordinate features of motors, installed units, and accessory devices. Provide motors that are:

1. Designed and labeled for use with variable frequency controllers, and suitable for use throughout speed range without overheating.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers listed below.

B. Plastic-to-Metal Transition Fittings:

1. Eslon Thermoplastics.

C. Plastic-to-Metal Transition Adaptors:

1. Thompson Plastics, Inc.

D. Plastic-to-Metal Transition Unions:

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-4

1. NIBCO, Inc.

E. Dielectric Flanges:

1. Capitol Manufacturing Co.

2. Central Plastics Company.

3. Epco Sales, Inc.

4. Watts Industries, Inc.; Water Products Div.

F. Dielectric Flange Kits:

1. Advance Products & Systems, Inc.

2. Calpico, Inc.

3. Central Plastics Company.

4. Pipeline Seal and Insulator, Inc.

G. Dielectric Couplings:

1. Calpico, Inc.

2. Lochinvar Corp.

H. Dielectric Nipples:

1. Perfection Corp.

2. Precision Plumbing Products, Inc.

3. Sioux Chief Manufacturing Co., Inc.

4. Victaulic Co. of America.

I. Mechanical Sleeve Seals:

1. Advance Products & Systems, Inc.

2. Calpico, Inc.

3. Metraflex Co.

4. Pipeline Seal and Insulator, Inc.

5. Thunderline/Link-Seal

2.2 PIPE, TUBE, AND FITTINGS

A. Refer to individual Division 23 piping Sections for pipe, tube, and fitting materials and joining methods.

B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.

2.3 JOINING MATERIALS

A. Refer to individual Division 23 piping Sections for special joining materials not listed below.

B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-5

1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated.

a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.

b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.

2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.

C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.

D. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.

E. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to

ASTM B 813.

F. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated; and AWS A5.8/A5.8M, BAg1, silver alloy for refrigerant piping, unless otherwise indicated.

G. Welding Filler Metals: Comply with AWS D10.12M/D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

H. Solvent Cements for Joining Plastic Piping:

1. ABS Piping: ASTM D 2235.

2. CPVC Piping: ASTM F 493.

3. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.

4. PVC to ABS Piping Transition: ASTM D 3138.

I. Fiberglass Pipe Adhesive: As furnished or recommended by pipe manufacturer.

2.4 TRANSITION FITTINGS

A. Plastic-to-Metal Transition Fittings: One-piece fitting with manufacturer's Schedule 80 equivalent dimensions; one end with threaded brass insert, and one solvent-cement-joint end.

B. Plastic-to-Metal Transition Adaptors: One-piece fitting with manufacturer's SDR 11 equivalent dimensions; one end with threaded brass insert, and one solvent-cement-joint end.

C. Plastic-to-Metal Transition Unions: MSS SP-107, four-part union. Include brass end, solvent-cement-joint end, rubber O-ring, and union nut.

2.5 DIELECTRIC FITTINGS

A. Description: Combination fitting of copper alloy and ferrous materials with threaded, solder-joint, plain, or weld-neck end connections that match piping system materials.

B. Insulating Material: Suitable for system fluid, pressure, and temperature.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-6

C. Dielectric Flanges: Factory-fabricated, companion-flange assembly, for 150- or 300-psig minimum working pressure as required to suit system pressures.

D. Dielectric-Flange Kits: Companion-flange assembly for field assembly. Include flanges, full-face- or ring-type neoprene or phenolic gasket, phenolic or polyethylene bolt sleeves, phenolic washers, and steel backing washers.

1. Separate companion flanges and steel bolts and nuts shall have 150- or 300-psig minimum working pressure where required to suit system pressures.

E. Dielectric Couplings: Galvanized-steel coupling with inert and noncorrosive, thermoplastic lining; threaded ends; and 300-psig minimum working pressure at 225 deg F.

F. Dielectric Nipples: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining;

plain, threaded, or grooved ends; and 300-psig minimum working pressure at 225 deg F.

2.6 MECHANICAL SLEEVE SEALS

A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.

1. Sealing Elements: EPDM interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

2. Pressure Plates: Plastic, include two for each sealing element.

3. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements. Include one for each sealing element.

2.7 SLEEVES

A. Galvanized-Steel Sheet: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.

B. Steel Pipe: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized, plain ends.

C. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.

D. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.

1. Underdeck Clamp: Clamping ring with set screws.

2.8 ESCUTCHEONS

A. Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers opening. Escutcheon finishes to be as follows:

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-7

1. Finished area, exposed to view: Polished chrome-plated.

2. Unfinished areas: Rough brass or similar finish.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass.

C. One-Piece, Cast-Brass Type: With set screw.

D. Split-Casting, Cast-Brass Type: With concealed hinge and set screw.

E. One-Piece, Stamped-Steel Type: With set screw or spring clips.

F. Split-Plate, Stamped-Steel Type: With concealed hinge, set screw or spring clips.

G. One-Piece, Floor-Plate Type: Cast-iron floor plate.

H. Split-Casting, Floor-Plate Type: Cast brass with concealed hinge and set screw.

2.9 GROUT

A. Description: ASTM C 1107/C 1107M, Grade B, non-shrink and non-metallic, dry hydraulic-cement grout.

1. Characteristics: Post-hardening, volume-adjusting, non-staining, non-corrosive, nongaseous, and recommended for interior and exterior applications.

2. Design Mix: 5000-psi, 28-day compressive strength.

3. Packaging: Premixed and factory packaged.

2.10 ACCESS PANELS AND DOORS

A. Panels and doors are to be furnished to provide access to items required in Division 23 Sections and the Mechanical Drawings. Panels and doors are to furnished per the requirements of

Division 8 Section, “Access Doors.”

2.11 MOTORS FOR MECHANICAL EQUIPMENT

A. Motor Characteristics:

1. Motors 3/4 HP and Larger: Three phase.

2. Motors Smaller Than 3/4 HP: Single phase.

3. Frequency Rating: 60 Hz.

4. Voltage Rating: NEMA standard voltage selected to operate on nominal circuit voltage to which motor is connected.

5. Service Factor: 1.15 for open dripproof motors; 1.0 for totally enclosed motors.

6. Duty: Continuous duty at ambient temperature of 105 deg F and at altitude of 3300 feet above sea level.

7. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-8

indicated operating sequence, and without exceeding nameplate ratings or considering service factor.

8. Enclosure: Open dripproof.

B. Polyphase Motors:

1. Description: NEMA MG 1, Design B, medium induction motor.

2. Efficiency: [Standard efficiency according to NEMA MG 1, Para. 12.59 and Table 12-

10] [Premium efficiency] <Insert minimum motor efficiency acceptable>.

3. Stator: Copper windings, unless otherwise indicated.

a. Multispeed motors shall have separate winding for each speed.

4. Rotor: Squirrel cage, unless otherwise indicated.

5. Bearings: Double-shielded, prelubricated ball bearings suitable for radial and thrust loading.

6. Temperature Rise: Match insulation rating, unless otherwise indicated.

7. Insulation: Class F, unless otherwise indicated.

8. Code Letter Designation:

a. Motors 15 HP and Larger: NEMA starting Code F or G.

b. Motors Smaller Than 15 HP: Manufacturer's standard starting characteristic.

9. Enclosure: Cast iron for motors 7.5 hp and larger; rolled steel for motors smaller than

7.5 hp.

a. Finish: Gray enamel .

C. Polyphase Motors with Additional Requirements:

1. Motors Used with Variable Frequency Controllers: Ratings, characteristics, and features coordinated with and approved by controller manufacturer.

a. Designed with critical vibration frequencies outside operating range of controller output.

b. Temperature Rise: Matched to rating for Class B insulation.

c. Insulation: Class H.

d. Thermal Protection: Comply with NEMA MG 1 requirements for thermally protected motors.

D. Single-Phase Motors:

1. Type: One of the following, to suit starting torque and requirements of specific motor application:

a. Permanent-split capacitor.

b. Split-phase start, capacitor run.

c. Capacitor start, capacitor run.

2. Shaded-Pole Motors: For motors 1/20 hp and smaller only.

3. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-9

motor insulation. Thermal-protection device shall automatically reset when motor temperature returns to normal range.

4. Bearings: Ball type for belt-connected motors and other motors with high radial forces on motor shaft; sealed, prelubricated-sleeve type for other single-phase motors.

5. Source Quality Control: Perform the following tests on each motor according to

NEMA MG 1:

a. Measure winding resistance.

b. Read no-load current and speed at rated voltage and frequency.

c. Measure locked rotor current at rated frequency.

d. Perform high-potential test.

2.12 PIPE EXPANSION FITTINGS AND LOOPS

E. A. Application: When the length of a piping run and the temperature range that the piping will experience will require expansion compensation refer to the ASHRAE 2000 Handbook –

HVAC Systems and Equipment and ASME B31.9 for the proper application of expansion compensation.

PART 3 - EXECUTION

3.1 MECHANICAL DEMOLITION

A. Disconnect, demolish, and remove mechanical systems, equipment, and components indicated to be removed.

1. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

2. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

3. Equipment to Be Removed: Disconnect and cap services and remove equipment.

4. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

5. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

6. For equipment, piping or ductwork being removed the removal shall include hangers, bands, clamps, bolts, screws, fasteners and all related equipment complete.

B. If pipe, insulation, or equipment to remain is damaged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.

3.2 CUTTING AND PATCHING

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-10

A. Refer to Division 1 Sections "Cutting and Patching" and "Selective Demolition" for general demolition requirements and procedures.

B. Refer to Division 26 for requirements for cutting and patching electrical equipment, components, and materials.

C. Do not endanger or damage installed Work through procedures and processes of cutting and patching.

D. Arrange for repairs required to restore other work, because of damage caused as a result of mechanical installations.

E. No additional compensation will be authorized for cutting and patching work that is necessitated by ill-timed, defective, or non-conforming installations.

F. Perform cutting, fitting, and patching of mechanical equipment and materials required to:

1. Uncover Work to provide for installation of ill-timed Work.

2. Remove and replace defective Work.

3. Remove and replace Work not conforming to requirements of the Contract Documents.

4. Remove samples of installed Work as specified for testing.

5. Upon written instructions from the Architect/Engineer, uncover and restore Work to provide for Architect/Engineer observation of concealed Work.

G. Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed.

H. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas.

3.3 ROUGH-IN

A. General: Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment and fixtures to be connected. Refer to equipment and fixture specifications in Divisions 2 through 26, and to approved shop drawings, for rough-in requirements.

3.4 GENERAL INSTALLATION REQUIREMENTS

A. General: Coordinate equipment and materials for installation with other building components.

B. Verify dimensions by field measurements.

C. Arrange for chases, slots, and openings in other building components to allow for mechanical installations.

D. Coordinate the installation of required supporting devices.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-11

1. Support suspended equipment from walls or from structural frames. Do not support equipment from metal roof deck.

E. Sequence, coordinate and integrate installations of mechanical materials and equipment for efficient flow of the work.

F. Coordinate the cutting and patching of building components to accommodate the installation of mechanical equipment and materials. Refer to Division 1.

G. Install mechanical equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations.

H. Install access panels to allow access to equipment and other system components which require servicing or adjustment per the requirements of Division 8.

I. Coordinate the installation of mechanical materials and equipment above ceilings with suspension system, lighting fixtures, and other installations.

3.5 PIPING SYSTEMS - COMMON REQUIREMENTS

A. Install piping according to the following requirements and Division 23 Sections specifying piping systems.

B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.

C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.

D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

F. Install piping to permit valve servicing.

G. Install piping at indicated slopes.

H. Install piping free of sags and bends.

I. Install fittings for changes in direction and branch connections.

J. Install piping to allow application of insulation.

K. Select system components with pressure rating equal to or greater than system operating pressure.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-12

L. Install escutcheons for penetrations of walls, ceilings, and floors according to the following.

Use One-piece escutcheons where ever possible in new construction. Split-casting units acceptable for installation on existing piping systems.

1. Piping with Fitting or Sleeve Protruding from Wall: Deep-pattern type.

2. Chrome-Plated Piping: Cast-brass type with polished chrome-plated finish.

3. Insulated Piping: Stamped-steel type with spring clips.

4. Bare Piping at Wall and Floor Penetrations in Finished Spaces: Cast-brass type with polished chrome-plated finish.

5. Bare Piping at Ceiling Penetrations in Finished Spaces: Cast-brass type with polished chrome-plated finish.

6. Bare Piping in Unfinished Service Spaces and Equipment Rooms: Cast-brass type with rough-brass finish.

7. Bare Piping at Floor Penetrations in Equipment Rooms: Floor-plate type.

M. Sleeves are not required for core-drilled holes. When installing a pipe thru a core-drilled hole core drill the hole to provide for the 1” annular space around the pipe and use a mechanical sleeve seal as indicated in paragraphs O and P below.

N. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs.

1. Cut sleeves to length for mounting flush with both surfaces.

a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.

2. Install sleeves in new walls and slabs as new walls and slabs are constructed.

3. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation. Use the following sleeve materials:

a. Steel Pipe Sleeves: For pipes smaller than NPS 6.

b. Steel Sheet Sleeves: For pipes NPS 6 and larger, penetrating gypsum-board partitions.

c. Stack Sleeve Fittings: For pipes penetrating floors with membrane waterproofing.

Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2 inches above finished floor level. Refer to Division 7 Section

"Sheet Metal Flashing and Trim" for flashing.

1) Seal space outside of sleeve fittings with grout.

4. Except for underground wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using joint sealants appropriate for size, depth, and location of joint.

Refer to Division 7 Section "Joint Sealants" for materials and installation.

O. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.

1. Install steel pipe for sleeves smaller than 6 inches in diameter.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-13

2. Install cast-iron "wall pipes" for sleeves 6 inches and larger in diameter.

3. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.

P. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Refer to Division 7 Section

"Through-Penetration Firestop Systems" for materials.

3.6 PIPING JOINT CONSTRUCTION

A. Join pipe and fittings according to the following requirements and Division 23 Sections specifying piping systems.

B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.

E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube"

Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8/A5.8M.

F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

G. Welded Joints: Construct joints according to AWS D10.12M/D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.

H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.

I. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.

2. ABS Piping: Join according to ASTM D 2235 and ASTM D 2661 Appendixes.

3. CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-14

4. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.

5. PVC Nonpressure Piping: Join according to ASTM D 2855.

6. PVC to ABS Nonpressure Transition Fittings: Join according to ASTM D 3138

Appendix.

J. Plastic Pressure Piping Gasketed Joints: Join according to ASTM D 3139.

K. Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212.

L. PE Piping Heat-Fusion Joints: Clean and dry joining surfaces by wiping with clean cloth or paper towels. Join according to ASTM D 2657.

1. Plain-End Pipe and Fittings: Use butt fusion.

2. Plain-End Pipe and Socket Fittings: Use socket fusion.

M. Fiberglass Bonded Joints: Prepare pipe ends and fittings, apply adhesive, and join according to pipe manufacturer's written instructions.

3.7 PIPING CONNECTIONS

A. Make connections according to the following, unless otherwise indicated:

1. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection to each piece of equipment.

2. Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final connection to each piece of equipment.

3. Dry Piping Systems: Install dielectric nipples and flanges to connect piping materials of dissimilar metals and between brass or bronze valves and steel piping.

4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals, and between brass or bronze valves and steel piping.

3.8 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS

A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.

B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.

C. Install mechanical equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.

D. Install equipment to allow right of way for piping installed at required slope.

3.9 CLEAN CONSTRUCTION MEASURES

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-15

A. General: Take care during construction to maintain the integrity and cleanliness of duct, pipe and equipment systems.

B. Ductwork must be capped during construction, dust and debris in ductwork is not acceptable.

Interior of ductwork and air systems must be completely cleaned.

C. Exposed ends of piping systems and equipment/fixture connection ports shall be capped, plugged, or otherwise covered during construction.

3.10 PAINTING

A. Painting of mechanical systems, equipment, and components is specified in Division 9 Section

"Painting.”

B. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.

3.11 ERECTION OF METAL SUPPORTS AND ANCHORAGES

A. Refer to Division 5 Section "Metal Fabrications" for structural steel.

B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor mechanical materials and equipment.

C. Field Welding: Comply with AWS D1.1/D1.1M.

3.12 ERECTION OF WOOD SUPPORTS AND ANCHORAGES

A. Cut, fit, and place wood grounds, nailers, blocking, and anchorages to support, and anchor mechanical materials and equipment.

B. Select fastener sizes that will not penetrate members if opposite side will be exposed to view or will receive finish materials. Tighten connections between members. Install fasteners without splitting wood members.

C. Attach to substrates as required to support applied loads.

3.13 GROUTING

A. Mix and install grout for mechanical equipment base bearing surfaces, pump and other equipment base plates, and anchors.

B. Clean surfaces that will come into contact with grout.

C. Provide forms as required for placement of grout.

D. Avoid air entrapment during placement of grout.

10090 BASIC MECHANICAL MATERIALS AND METHODS 230500-16

E. Place grout, completely filling equipment bases.

F. Place grout on concrete bases and provide smooth bearing surface for equipment.

G. Place grout around anchors.

H. Cure placed grout.

END OF SECTION 230500