This document is a technical specification section for the preparation required to re-roof the Chicopee Armory in Chicopee, Massachusetts as part of the Chicopee Armory Rehabilitation project. The scope includes roof tear-off, deck preparation, and removal and replacement of existing base flashings. The work must be coordinated with the building owner to minimize disruptions. The project prohibits the disturbance of any hazardous materials such as asbestos. Auxiliary roofing materials must be compatible with the new membrane roofing system.
The contract opportunity is for subcontractor bids to perform this re-roofing preparation work as part of the larger Chicopee Armory Rehabilitation project in Massachusetts. No additional pricing, funding, or set-aside details are provided. The document focuses on the technical requirements for the re-roofing preparation work.
View the file
Other files
Show 40 more
Latest 50 of 183 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101
CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11
10090 PREPARATION FOR RE-ROOFING 070150.19 - 1
SECTION 070150.19
PREPARATION FOR RE-ROOFING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Roof re-cover preparation.
B. Related Sections:
1. Section 011000 "Summary" for use of the premises and phasing requirements.
2. Section 015000 "Temporary Facilities and Controls" for temporary construction and environmental-protection measures for reroofing preparation.
1.3 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to remain Owner's property, demolished materials shall become Contractor's property and shall be removed from Project site.
1.4 DEFINITIONS
A. Roofing Terminology: Refer to ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" for definition of terms related to roofing work in this Section.
B. Existing Membrane Roofing System: roofing membrane, roof insulation, surfacing, and components and accessories between deck and roofing membrane.
C. Roof Tear-Off: Removal of existing membrane roofing system from deck.
D. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and reinstalled.
E. Existing to Remain: Existing items of construction that are not indicated to be removed.
10090 PREPARATION FOR RE-ROOFING 070150.19 - 2
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.6 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning membrane roofing removal. Comply with hauling and disposal regulations of authorities having jurisdiction.
1.7 PROJECT CONDITIONS
A. Owner will occupy portions of building immediately below reroofing area. Conduct reroofing so Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.
1. Coordinate work activities daily with Owner so Owner can place protective dust or water leakage covers over sensitive equipment or furnishings, shut down HVAC and fire-alarm or -detection equipment if needed, and evacuate occupants from below the work area.
2. Before working over structurally impaired areas of deck, notify Owner to evacuate occupants from below the affected area. Verify that occupants below the work area have been evacuated before proceeding with work over the impaired deck area.
B. Protect building to be reroofed, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations.
C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
D. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering existing roofing system or building.
E. Hazardous Materials: It is not expected that hazardous materials such as asbestos-containing materials will be encountered in the Work.
1. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Architect and Owner.
2. Coordinate with hazardous material remediation subcontractor to prevent water from entering existing roofing system or building.
PART 2 - PRODUCTS
2.1 AUXILIARY REROOFING MATERIALS
A. General: Auxiliary reroofing preparation materials recommended by roofing system manufacturer for intended use and compatible with components of new membrane roofing system.
10090 PREPARATION FOR RE-ROOFING 070150.19 - 3
B. Base Sheet Fasteners: Capped head, factory-coated steel fasteners, listed in FM Approval's
"Approval Guide."
C. Metal Flashing Sheet: Metal flashing sheet is specified in Section 076200 "Sheet Metal
Flashing and Trim."
PART 3 - EXECUTION
3.1 PREPARATION
A. During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain.
B. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.
Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.
1. If roof drains are temporarily blocked or unserviceable due to roofing system removal or partial installation of new membrane roofing system, provide alternative drainage method to remove water and eliminate ponding. Do not permit water to enter into or under existing membrane roofing system components that are to remain.
C. Verify that rooftop utilities and service piping have been shut off before beginning the Work.
3.2 ROOF TEAR-OFF
A. General: Notify Owner each day of extent of roof tear-off proposed for that day.
B. Roof Tear-Off: Remove existing roofing membrane and other membrane roofing system components down to the deck.
1. Bitumen and felts that are firmly bonded to concrete decks are permitted to remain if felts are dry. Remove unadhered bitumen and felts and wet felts.
2. Remove fasteners from deck or cut fasteners off slightly above deck surface.
3.3 DECK PREPARATION
A. Inspect deck after tear-off of membrane roofing system.
B. Verify that concrete substrate is visibly dry and free of moisture. Test for capillary moisture by plastic sheet method according to ASTM D 4263 or by pouring 1 pint (0.5 L) of hot roofing asphalt on deck at start of each day's work and at start of each roof area or plane. Do not proceed with roofing work if moisture condenses under the plastic sheet or if asphalt test sample foams or can be easily and cleanly stripped after cooling.
10090 PREPARATION FOR RE-ROOFING 070150.19 - 4
3.4 ROOF RE-COVER PREPARATION
3.5 EXISTING BASE FLASHINGS
A. Remove existing base flashings around parapets, curbs, walls, and penetrations.
1. Clean substrates of contaminants such as asphalt, sheet materials, dirt, and debris.
B. Do not damage metal counterflashings that are to remain. Replace metal counterflashings damaged during removal with counterflashings of same metal, weight or thickness, and finish.
C. Inspect parapet sheathing for deterioration and damage. If parapet sheathing has deteriorated, immediately notify Architect.
3.6 DISPOSAL
A. Collect demolished materials and place in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
1. Storage or sale of demolished items or materials on-site is not permitted.
B. Transport and legally dispose of demolished materials off Owner's property.
END OF SECTION 070150.19