About this file
This document is the technical specification for cold-formed metal framing required for the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. It details the materials, products, submittals, and installation requirements for the interior load-bearing wall framing and floor joist framing. The project calls for experienced installers to fabricate and install the cold-formed metal framing according to AISI standards and manufacturer instructions. Field testing and inspection will be required to ensure compliance with the specified requirements.
The document does not contain pricing terms, set asides, incumbent information, funding sources, or other commercial details. It focuses solely on the technical specifications for the cold-formed metal framing scope of work as part of the larger Chicopee Armory Rehabilitation project being bid out by the State of Massachusetts.
View the file
Other files
Show 40 more
Latest 50 of 183 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101
CHICOPEE, MASSACHUSETTS ISSUED FOR BID – 05/20/11
10090 COLD-FORMED METAL FRAMING 054000 - 1
SECTION 054000
COLD-FORMED METAL FRAMING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes structural framing for the ceiling platform including the following:
1. Interior load-bearing wall framing.
2. Floor joist framing.
B. Related Sections include the following:
1. Division 09 Section "Non-Structural Metal Framing" for interior non-load-bearing, metal-stud framing and ceiling-suspension assemblies.
1.3 SUBMITTALS
A. Product Data: For each type of cold-formed metal framing product and accessory indicated.
Include structural data for all framing members and connectors as required to verify compliance with specified loadings.
B. Product Test Reports: From a qualified testing agency, unless otherwise stated, indicating that each of the following complies with requirements, based on evaluation of comprehensive tests for current products:
1. Power-actuated anchors.
2. Mechanical fasteners.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer who has completed cold-formed metal framing similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance.
B. Testing Agency Qualifications: An independent testing agency, acceptable to authorities having jurisdiction, qualified according to ASTM E 329 to conduct the testing indicated.
10090 COLD-FORMED METAL FRAMING 054000 - 2
1.5 DELIVERY, STORAGE, AND HANDLING
A. Protect cold-formed metal framing from corrosion, deformation, and other damage during delivery, storage, and handling.
B. Store cold-formed metal framing, protect with a waterproof covering, and ventilate to avoid condensation.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering cold-formed metal framing that may be incorporated into the Work include, but are not limited to, the following:
1. Allied Studco.
2. AllSteel Products, Inc.
3. California Expanded Metal Products Company.
4. Clark Steel Framing.
5. Consolidated Fabricators Corp.; Building Products Division.
6. Craco Metals Manufacturing, LLC.
7. Custom Stud, Inc.
8. Dale/Incor.
9. Design Shapes in Steel.
10. Dietrich Metal Framing; a Worthington Industries Company.
11. Formetal Co. Inc. (The).
12. Innovative Steel Systems.
13. MarinoWare; a division of Ware Industries.
14. Quail Run Building Materials, Inc.
15. SCAFCO Corporation.
16. Southeastern Stud & Components, Inc.
17. Steel Construction Systems.
18. Steeler, Inc.
19. Super Stud Building Products, Inc.
20. United Metal Products, Inc.
2.2 MATERIALS
A. Steel Sheet: ASTM A 1003/A 1003M, Structural Grade, Type H, metallic coated, of grade and coating weight as follows:
1. Grade: ST33H (ST230H) and ST50H (ST340H) as indicated.
2. Coating: G60 (Z180), A60 (ZF180), AZ50 (AZ150), or GF30 (ZGF90).
10090 COLD-FORMED METAL FRAMING 054000 - 3
2.3 LOAD-BEARING WALL FRAMING
A. Steel Studs: Manufacturer's standard C-shaped steel studs, of sizes and thicknesses indicated, punched, with stiffened flanges, and as follows:
B. Steel Track: Manufacturer's standard U-shaped steel track, of sizes and thicknesses indicated, or, if not indicated, of standard size with thickness matching studs, unpunched, with straight flanges.
C. Steel Box or Back-to-Back Headers: Manufacturer's standard C-shapes used to form header beams, of sizes and thicknesses indicated, punched, with stiffened flanges. Join members of built-up headers with number 10 screws spaced as indicated, or if not indicated, at 12 inch spacing.
2.4 FLOOR JOIST FRAMING
A. Steel Joists: Manufacturer's standard C-shaped steel joists, of size and thickness indicated, unpunched, with stiffened flanges.
B. Steel Joist Track: Manufacturer's standard U-shaped steel joist track, of web depths indicated, unpunched, with unstiffened flanges.
2.5 FRAMING ACCESSORIES
A. Fabricate steel-framing accessories from steel sheet, ASTM A 1003/A 1003M, Structural
Grade, Type H, metallic coated, of same grade and coating weight used for framing members.
B. Provide accessories of manufacturer's standard thickness and configuration, unless otherwise indicated, as follows:
1. Supplementary framing.
2. Bracing, bridging, and solid blocking.
3. Anchor clips.
4. End clips.
5. Joist hangers and end closures.
6. Hole reinforcing plates.
7. Backer plates.
2.6 ANCHORS, CLIPS, AND FASTENERS
A. Steel Shapes and Clips: ASTM A 36/A 36M, zinc coated by hot-dip process according to
ASTM A 123/A 123M.
B. Expansion Anchors: Fabricated from corrosion-resistant materials, with capability to sustain, without failure, a load equal to 5 times design load, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency.
C. Power-Actuated Anchors: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with capability to sustain, without failure, a load equal to 10
10090 COLD-FORMED METAL FRAMING 054000 - 4
times design load, as determined by testing per ASTM E 1190 conducted by a qualified independent testing agency.
1. For fastening to concrete, provide .145 inch diameter fasteners with 1 1/4 inches embedment.
2. For fastening to structural steel, provide .145 inch diameter fasteners with length adequate for the tip to penetrate the back side of the member.
D. Mechanical Fasteners: ASTM C 1513, corrosion-resistant-coated, self-drilling, self-tapping steel drill screws.
1. Head Type: Low-profile head beneath sheathing, manufacturer's standard elsewhere.
2. Minimum size; No. 10-16 (D=.190”), with length adequate for 3 threads to project through the connected members.
E. Miscellaneous Clips: Drawings indicate clips for specific conditions. Substitutions are acceptable provided the products are equal in configuration and load capacity. All substitution requests must be clearly indicated in submittals, with structural data provided for verification of load capacity.
2.7 MISCELLANEOUS MATERIALS
A. Galvanizing Repair Paint: ASTM A 78.
B. Cement Grout: Portland cement, ASTM C 150, Type I; and clean, natural sand, ASTM C 404.
Mix at ratio of 1 part cement to 2-1/2 parts sand, by volume, with minimum water required for placement and hydration.
C. Shims: Load bearing, high-density multimonomer plastic, nonleaching.
2.8 FABRICATION
A. Fabricate cold-formed metal framing and accessories plumb, square, and true to line, and with connections securely fastened, according to referenced AISI's specifications and standards, manufacturer's written instructions, and requirements in this Section.
1. Fabricate framing assemblies using jigs or templates.
2. Cut framing members by sawing or shearing; do not torch cut.
3. Fasten cold-formed metal framing members by screw fastening. Wire tying of framing members is not permitted.
4. Fasten other materials to cold-formed metal framing by bolting, or screw fastening.
B. Reinforce, stiffen, and brace framing assemblies to withstand handling, delivery, and erection stresses. Lift fabricated assemblies to prevent damage or permanent distortion.
C. Fabrication Tolerances: Fabricate assemblies level, plumb, and true to line to a maximum allowable tolerance variation of 1/8 inch in 10 feet (1:960) and as follows:
10090 COLD-FORMED METAL FRAMING 054000 - 5
1. Spacing: Space individual framing members no more than plus or minus 1/8 inch (3 mm) from plan location. Cumulative error shall not exceed minimum fastening requirements of sheathing or other finishing materials.
2. Squareness: Fabricate each cold-formed metal framing assembly to a maximum out-of-square tolerance of 1/8 inch (3 mm).
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine supporting substrates and abutting structural framing for compliance with requirements for installation tolerances and other conditions affecting performance.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Install load bearing shims or grout between the underside of wall bottom track and the top of slab at stud locations to ensure a uniform bearing surface on supporting concrete construction.
3.3 INSTALLATION, GENERAL
A. Cold-formed metal framing may be shop or field fabricated for installation, or it may be field assembled.
B. Install cold-formed metal framing according to AISI's "Standard for Cold-Formed Steel
Framing - General Provisions" and to manufacturer's written instructions unless more stringent requirements are indicated.
C. Install shop- or field-fabricated, cold-formed framing and securely anchor to supporting structure.
1. Screw or bolt wall panels at horizontal and vertical junctures to produce flush, even, true-to-line joints with maximum variation in plane and true position between fabricated panels not exceeding 1/16 inch (1.6 mm).
D. Install cold-formed metal framing and accessories plumb, square, and true to line, and with connections securely fastened.
1. Cut framing members by sawing or shearing; do not torch cut.
2. Fasten cold-formed metal framing members by screw fastening. Wire tying of framing members is not permitted.
E. Install framing members in one-piece lengths.
F. Install temporary bracing and supports to secure framing and support loads comparable in intensity to those for which structure was designed. Maintain braces and supports in place, 10090 COLD-FORMED METAL FRAMING 054000 - 6 undisturbed, until entire integrated supporting structure has been completed and permanent connections to framing are secured.
G. Fasten hole reinforcing plate over web penetrations that exceed size of manufacturer's standard punched openings.
H. Erection Tolerances: Install cold-formed metal framing level, plumb, and true to line to a maximum allowable tolerance variation of 1/8 inch in 10 feet (1:960) and as follows:
1. Space individual framing members no more than plus or minus 1/8 inch (3 mm) from plan location. Cumulative error shall not exceed minimum fastening requirements of sheathing or other finishing materials.
3.4 LOAD-BEARING WALL INSTALLATION
A. Install continuous top and bottom tracks sized to match studs. Align tracks accurately and securely anchor at corners and ends, and at spacings as indicated.
B. Squarely seat studs against top and bottom tracks with gap not exceeding of 1/8 inch (3 mm) between the end of wall framing member and the web of track. Fasten both flanges of studs to top and bottom tracks. Space studs at 16 inches on center, maximum.
C. Set studs plumb.
D. Align floor framing over studs.
E. Install headers over wall openings wider than stud spacing. Locate headers above openings as indicated. Fabricate headers of compound shapes indicated, complete with clip-angle connectors.
1. Frame wall openings with not less than a double stud at each jamb of frame as indicated.
Fasten jamb members together to uniformly distribute loads.
2. Install runner tracks and jack studs above and below wall openings. Anchor tracks to jamb studs with clip angles and space jack studs same as full-height wall studs.
F. Install supplementary framing, blocking, and bracing in stud framing indicated to support fixtures, equipment, services, casework, heavy trim, furnishings, and similar work requiring attachment to framing.
1. If type of supplementary support is not indicated, comply with stud manufacturer's written recommendations and industry standards in each case, considering weight or load resulting from item supported.
G. Install horizontal bridging in stud system, spaced 48 inches (1220 mm). Fasten at each stud intersection. Provide one of the following:
1. Bridging: Cold-rolled steel channel, welded or mechanically fastened to webs of punched studs with a minimum of 2 screws into each flange of the clip angle.
2. Bridging: Proprietary bridging bars installed according to manufacturer's written instructions.
10090 COLD-FORMED METAL FRAMING 054000 - 7
H. Install miscellaneous framing and connections, including supplementary framing, clip angles, continuous angles, anchors, and fasteners, to provide a complete and stable wall-framing system.
3.5 JOIST INSTALLATION
A. Install perimeter joist track sized to match joists. Align and securely anchor or fasten track to supporting structure at corners, ends, and spacings indicated.
B. Install joists bearing on supporting frame, level, straight, and plumb; adjust to final position, brace, and reinforce. Fasten joists to both flanges of joist track.
1. Install joists over supporting frame with end bearing as indicated, but not less than 1-1/2 inches (38 mm).
C. Space joists not more than 2 inches (51 mm) from abutting walls, and as follows:
1. Joist Spacing: 16 inches (406 mm).
D. Frame openings with built-up joist headers consisting of joist and joist track, nesting joists, or another combination of connected joists if indicated.
E. Install bridging at intervals indicated. Fasten bridging at each joist intersection as follows:
1. Bridging: Combination of flat, taut, steel sheet straps of width and thickness indicated and joist-track solid blocking of width and thickness indicated. Fasten flat straps to bottom flange of joists and secure solid blocking to joist webs.
F. Secure joists to load-bearing interior walls to prevent lateral movement of bottom flange.
G. Install miscellaneous joist framing and connections, including closure pieces, clip angles, continuous angles, anchors, and fasteners, to provide a complete and stable joist-framing assembly.
3.6 FIELD QUALITY CONTROL
A. Testing: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Testing agency will report test results promptly and in writing to Contractor and Architect.
C. Remove and replace work where test results indicate that it does not comply with specified requirements.
D. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
10090 COLD-FORMED METAL FRAMING 054000 - 8
3.7 REPAIRS AND PROTECTION
A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed cold-formed metal framing with galvanized repair paint according to ASTM A 780 and manufacturer's written instructions.
B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and
Installer, that ensure that cold-formed metal framing is without damage or deterioration at time of Substantial Completion.
END OF SECTION 054000