J-17 - Price Schedule.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Exhibition Audio Visual (AV) Design Services - Orientation Gallery
Solicitation number
030ADV25R0001
Issued by

About this file

This document is a Price Schedule for a federal contract opportunity related to Exhibition Audio Visual (AV) Design Services for the Orientation Gallery at the Library of Congress.

The contract requires the contractor to provide audiovisual systems integration and support services, including system design, prototyping, equipment procurement and installation, commissioning, troubleshooting, and maintenance for the Orientation Gallery exhibits. The contractor must have extensive experience in onsite production and installation of media programs, equipment and hardware integration.

The Price Schedule lists the required deliverables and associated pricing, including a project schedule, AV systems integration plan, hardware procurement and installation, commissioning, troubleshooting, and maintenance support. Pricing is provided for the base period as well as optional CLINs for additional AV components. All pricing is on a firm-fixed-price basis, with no separately priced items. The period of performance ranges from the start date through March 2027, with optional maintenance periods in years 2-3.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Price Schedule

030ADV25R0001 Attachment J-17 - Price Schedule
Offeror shall read the Statement of Work at Section C of the solicitation and provide firm fixed prices for the deliverables listed below. Offeror shall also provide details for how prices were derived for each deliverable, including, but not limited to services, labor categories and required hours.
RequirementDeliverableDue DatePrice
C.4.2Introductory Planning Meetingwithin 5 days of Period of performance start dateNot Separately Priced (NSP)
C.4.2Provide Project Schedule of technical requirements, and creative approach for all audiovisual presentations and interactive technicology for Kislak Exhibit.12/1/24$ - 0
C.3.3Provide developed and finalized A/V Systems Integration Plan which includes systems diagrams, control systems, and final hardware and equipment list for purchase.2/1/25$ - 0
C.3.4 - C.3.6Coordinate and complete ordering and purchasing of all hardware and equipment required3/1/25$ - 0
C.3.7Hardware Procurement. Coordinate and complete ordering and purchasing.9/1/25$ - 0
C.3.8 - C.3.11Commissioning, A/V Integration, Infrastructure, Delivery, and Installation.9/1/2025 - 12/31/2026$ - 0
c.3.12Provide trouble shooting and support of equipment1/1/2027 - 3/31/2027$ - 0
C.3.1390 Day Maintenance and Support4/1/2027 - 6/30/2027$ - 0
Base Period Sub-Total:$ - 0
C.3.2.1, C.3.3.2.a, C.3.11OPTION: WA.AV.01- Central Spine and Prototype. Delivery and installation.4/1/27$ - 0
C.3.2.1.a, C.3.11OPTION: WA.AV.01a- Two additional Archways. Delivery and installation.4/1/27
C.3.2.3, C.3.11OPTION: WA.AV.02 – Collector Space: Collection Slideshow. Delivery and installation.4/1/27
C.3.13.1Option Period I – Maintenance and support7/1/2027 - 6/30/2028$ - 0
C.3.13.2Option Period II – Maintenance and support7/1/2028 - 6/30/2029$ - 0
Optional CLIN Sub-Total:$ - 0
TOTAL:$ - 0

&F &A 8/9/2024

Page &P of &N

2. Price Detail

Labor Category/Material/ItemUnitsUnit AmountNo. of UnitsTotalDeliverable Total
C.4.2 - Project Schedule$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.3 - Integration Plan$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.4 - C.3.6 - Purchase, Delivery and installation for Prototyping$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.7 - Hardware Procurement$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.8 - C.3.11 - Commissioning, A/V Integration, Infrastructure, Delivery and Installation$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.12 - Trouble Shooting and support of Equipment$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.13 - 90 Day Maintenance and Support$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.2.1, C.3.3.2.a, C.3.11 - OPTION: WA.AV.01- Central Spine and
Prototype. Delivery and installation.$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.2.1.a, C.3.11 - OPTION: WA.AV.01a- Two additional
Archways. Delivery and installation.$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.2.3, C.3.11 - OPTION: WA.AV.02 – Collector Space:
Collection Slideshow. Delivery and installation.$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.13.1 - Option Period I – Maintenance and support$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
C.3.13.a - Option period II – Maintenance and support$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Base Total:$ - 0
Option Total:$ - 0
Base + Option Total:$ - 0

&F &A 8/9/2024

Page &P of &N

File details come from the government source that posted it. Updated .