015719Temp Env Cntrls 01-11 - Edited 121511.pdf

PDF 75 KB Posted

Attached to
Z1DA--FIRE DAMPERS -Repair, Install, Inspect and Testing Federal contract opportunity
Solicitation number
36C24221B0065
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This notice provides details for an upcoming solicitation seeking fire damper repair, inspection, and testing services. The Department of Veterans Affairs Veterans Health Administration will issue a solicitation on or around August 27, 2021 to repair, install, inspect, test, and decommission approximately 350 fire dampers located in Buildings 1 and 6 of the VA New York Harbor Healthcare System Manhattan Veterans Affairs Medical Center. The project is a Veteran Owned Small Business set-aside with an estimated value between $200,000-$500,000 classified under NAICS code 238220. The performance period is 360 calendar days from notice to proceed. Interested contractors must be verified as a Veteran Owned Small Business in the Vendor Information Pages database and registered in the System for Award Management. The solicitation will require bonding and mandate compliance with NFPA standards for healthcare facilities, life safety, smoke dampers, and fire damper testing and maintenance. A site visit will be held and all prospective bidders are encouraged to attend for additional project details. The point of contact for this project is Julie Provenzano.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--FIRE DAMPERS -Repair, Install, Inspect and Testing, newest first.
File Type Posted
36C24221B0065 0004.docx DOCX document
Bid Sheet -36C24221B0065 Rev.pdf PDF
RFIs -36C24221B0065 Answers.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATION.pdf PDF
36C24221B0065 0003.docx DOCX document
Site Visit - Sign In 36C24221B0065 Fire Damper.pdf PDF
Bid Sheet -36C24221B0065.pdf PDF
36C24221B0065 0002.docx DOCX document
36C24221B0065 0001.docx DOCX document
Building 1.pdf PDF
DB Wage Determination dtd 10-22-2021.pdf PDF
014219 Ref Standards 09-11 - Edited - 121511.pdf PDF
36C24221B0065.docx DOCX document
015816 Temp Int Signage 08-11 Edited 121511.pdf PDF
017419 Const Waste management 09-10 edited 121511.pdf PDF
014529 Testing Lab Srvcs 05-09 - Edited - 121511.pdf PDF
Building 6.pdf PDF
013323 Shop Dwgs Product Data and Samples - Edited - 121511.pdf PDF
010000 Gen Req 6-11- Edited -121311.pdf PDF
Fire Dampers Report - 2014.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-11

Repair Fire Dampers/Testing last edited 1/4/12

01 57 19- 1

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the control of environmental pollution and damage that the Contractor must consider for air, water, and land resources. It includes management of visual aesthetics, noise, solid waste, radiant energy, and radioactive materials, as well as other pollutants and resources encountered or generated by the Contractor.

The Contractor is obligated to consider specified control measures with the costs included within the various contract items of work.

B. Environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents which:

1. Adversely effect human health or welfare,

2. Unfavorably alter ecological balances of importance to human life,

3. Effect other species of importance to humankind, or;

4. Degrade the utility of the environment for aesthetic, cultural, and historical purposes.

C. Definitions of Pollutants:

1. Chemical Waste: Petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals, and inorganic wastes.

2. Debris: Combustible and noncombustible wastes, such as leaves, tree trimmings, ashes, and waste materials resulting from construction or maintenance and repair work.

3. Sediment: Soil and other debris that has been eroded and transported by runoff water.

4. Solid Waste: Rubbish, debris, garbage, and other discarded solid materials resulting from industrial, commercial, and agricultural operations and from community activities.

5. Surface Discharge: The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "water of the United States" and would require a permit to discharge water from the governing agency.

01 57 19- 2

6. Rubbish: Combustible and noncombustible wastes such as paper, boxes, glass and crockery, metal and lumber scrap, tin cans, and bones.

7. Sanitary Wastes:

a. Sewage: Domestic sanitary sewage and human and animal waste.

b. Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

1.2 QUALITY CONTROL

A. Establish and maintain quality control for the environmental protection of all items set forth herein.

B. Record on daily reports any problems in complying with laws, regulations, and ordinances. Note any corrective action taken.

1.3 REFERENCES

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

B. U.S. National Archives and Records Administration (NARA):

33 CFR 328 ............ Definitions

1.4 SUBMITTALS

A. In accordance with Section, 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES, furnish the following:

1. Environmental Protection Plan: After the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the Resident Engineer to discuss the proposed Environmental

Protection Plan and to develop mutual understanding relative to details of environmental protection. Not more than 20 days after the meeting, the Contractor shall prepare and submit to the Resident

Engineer // and the Contracting Officer // for approval, a written and/or graphic Environmental Protection Plan including, but not limited to, the following:

a. Name(s) of person(s) within the Contractor's organization who is

(are) responsible for ensuring adherence to the Environmental

Protection Plan.

b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site.

c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.

01 57 19- 3

d. Description of the Contractor's environmental protection personnel training program.

e. A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, noise control and abatement that are applicable to the

Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits.

f. Methods for protection of features to be preserved within authorized work areas including trees, shrubs, vines, grasses, ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, and archeological and cultural resources.

g. Procedures to provide the environmental protection that comply with the applicable laws and regulations. Describe the procedures to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures as described in the

Environmental Protection Plan.

h. Permits, licenses, and the location of the solid waste disposal area.

i. Drawings showing locations of any proposed temporary excavations or embankments for haul roads, // stream crossings, // material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials. Include as part of an Erosion Control

Plan approved by the District Office of the U.S. Soil

Conservation Service and the Department of Veterans Affairs.

j. Environmental Monitoring Plans for the job site including land, water, air, and noise.

k. Work Area Plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas. This plan may be incorporated within the Erosion Control Plan.

B. Approval of the Contractor's Environmental Protection Plan will not relieve the Contractor of responsibility for adequate and continued control of pollutants and other environmental protection measures.

1.5 PROTECTION OF ENVIRONMENTAL RESOURCES

NA

- - - E N D - - -