0083-0270_Bridge06770_07_PermitPlanting.pdf

PDF 604 KB Posted

Attached to
Rehabilitation of Bridge No. 06770 in the City of Milford
Solicitation number
0083-0270
Issued by
New Haven County, Connecticut

About this file

This is a Permit Planting Plan document prepared by the Connecticut Department of Transportation (CTDOT) for the Rehabilitation of Bridge No. 06770, located on SR 796 (Milford Parkway Extension) over Unnamed Brook in Milford, Connecticut. The plan outlines environmental restoration requirements for the bridge project, specifying planting and seeding specifications for disturbed areas. The project involves the installation of 14 total plants across a designated 66 square yard planting area, with plantings identified by three species: Speckled Alder (Alnus incana), Willow (Salix discolor), and Red-Osier Dogwood (Cornus sericea). All plant material must conform to American Standards for Nursery Stock and be approved by CTDOT's Office of Environmental Planning (OEP). Disturbed areas above the wetland limit shall be seeded with conservation seeding for slopes, while areas below the wetland limit shall receive wetland seeding. Wood chip mulch is prohibited in wetland areas, and all invasive vegetation must be controlled and removed in designated treatment areas.

The plan includes specific planting guidelines requiring coordination with CTDOT OEP's designated representative for field location of proposed plantings. All three plant species identified are classified as FACW (Facultative Wetland) indicator plants. The document was designed and drafted by CLR with review by CEP and was plotted on 5/30/2026. The file references a project number 0083-0270 and includes technical specifications for slope protection using modified riprap, permanent access roads, and temporary easement areas. The plan incorporates site features including Interstate 95, a 12x12 access tunnel, Metro-North Railroad property, and a proposed GRP pipe liner installation for the brook crossing.

View the file

Other files

File Type Posted
0083-0270_Bridge06770_06_FIO_Gas.pdf PDF
HW_CB_0083-0270_Alignment Ramp.dgn —
CTDOT_HIGHWAY_STD [02-10-25].pdf PDF
HW_CB_0083-0270_Alignment East Access Rd_ATW1.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional.dxf DXF file
TR_CP_0083_0270_MPT_MDL.dgn —
HW_CB_0083-0270_Alignment West Access Rd.dgn —
West Access Rd.xml XML file
HW_CB_0083-0270_Master_ATW1.dxf DXF file
0083-0270_Aug_5_26_solicitation_doc.pdf PDF
BR_CP_0083-0270_Bridge06770Model.dgn —
NTC - Bidx Enhanced Bidding Workflow-Rev April 2026.pdf PDF
HW_CB_0083-0270_Alignment West Access Rd.dxf DXF file
Electronic Bidding Instructions -Rev April 2026.pdf PDF
0083-0270_Bridge06770_04_Structures.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional_Annotation.dxf DXF file
HW_CB_0083-0270_Alignment 72 Pipe.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN.dxf DXF file
NTC - New DBE Requirements - Regular Dealer Affirmation Form.pdf PDF
Online Q and A Instruction.pdf PDF
HW_CB_0083-0270_Layout_ATW1.dgn —
Bidders Checklist.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Annotation.dxf DXF file
Milford Connector Ramp.xml XML file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12)_Annotation.dxf DXF file
HW_CB_0083-0270_Alignment Ramp.dxf DXF file
HW_CB_0083-0270_Layout_ATW1_Default.dxf DXF file
EEDFileManifest.xlsx XLSX spreadsheet
HW_CB_0083-0270_Alignment 72 Pipe.dgn —
CL_72_PIPE.xml XML file
0083-0270_Bridge06770_02_Revisions.pdf PDF
HW_CB_0083-0270_Master_ATW1_ALI-GEOMETRY-CURVE.dxf DXF file
HW_CB_0083-0270_Alignment East Access Rd_ATW1.dgn —
PROSPECTIVE BIDDERS - 2.pdf PDF
HW_CB_0083-0270_Layout_ATW1.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Boundary.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12).dxf DXF file
HW_CB_0083-0270_Master_ATW1_highway plan Existing.dxf DXF file
HazMat Inspection Letter.pdf PDF
PROSPECTIVE BIDDERS - 1.pdf PDF
East Access Rd ATW1.xml XML file
0083-0270 Contract Special Provisions.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12)_Boundary.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12).dgn —
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional_Boundary.dxf DXF file
0083-0270 Contract Special Provisions.pdf.crdownload CRDOWNLOAD file
BR_CP_0083-0270_Bridge06770Model.dxf DXF file
0083-0270_Aug_10_26_solicitation_doc.pdf PDF
BR_CP_0083-0270_Bridge06770Details.dgn —
BR_CP_0083-0270_Bridge06770Details.dxf DXF file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERMIT PLANTING PLANPPP-02

PERMIT PLANTING PLAN INDEX OF DRAWINGSPPP-01

DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER

INDEX OF DRAWINGS

07 - PERMIT PLANTING PLAN

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

PPP-01

TOWN(S):

MILFORD

PARKWAY EXTENSION) OVER UNNAMED BROOK

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Bridge\Contract_Plans\BR_CP_0083_0270_PPP_07_PermitPlanting_SubsetCoverSheet.dgn FILE NAME: 7379 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

N

0083-0270

DESIGNER/DRAFTER: CLR CHECKED BY: CEP

INDEX OF DRAWINGS

PERMIT PLANTING PLAN

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

ROCKY HILL, CT 06067

SUITE 301

400 CAPITAL BOULEVARD

& ASSOCIATES, LLP

CLOUGH, HARBOUR

DESIGNED BY:

07.01

PLANTING, SEEDING, AND RESTORATION.

AREA TO BE TREATED FOR INVASIVES SHALL BE PROPERLY PREPARED FOR FINAL 7.

NO PLANTINGS SHALL BE PLACED IN MOW AREA.6.

REVIEW AND APPROVE PROPOSED PLANTINGS.

OF THE AMERICAN STANDARDS FOR NURSERY STOCK. CTDOT OEP WILL

ALL PLANT MATERIAL SHALL BE STRAIGHT SPECIES CONFORMING TO SECTION 3 5.

SPECIFIED. ALL AREAS SHALL BE RESTORED.

SEEDED WITH CONSERVATION SEEDING FOR SLOPES, OR OTHER SEED MIX AS

GRASS ESTABLISHMENT. DISTURBED AREAS ABOVE THE WETLAND LIMIT SHALL BE

DISTURBED AREAS BELOW THE WETLAND LIMIT SHALL BE SEEDED WITH WETLAND 4.

WOOD CHIP MULCH SHALL NOT BE PLACED IN THE WETLAND AREA.3.

DESIGNATED REPRESENTATIVE.

PROPOSED PLANTINGS TO BE FIELD LOCATED BY CTDOT OEP OR THEIR 2.

DEPARTMENT'S OFFICE OF ENVIRONMENTAL PLANNING (OEP).

SUBSTITUTIONS TO THE PERMIT PLANTINGS SHALL BE COORDINATED WITH THE

PLANTINGS ON THIS SHEET ARE FOR ENVIRONMENTAL PERMITTING. ANY 1.

NOTES:

LEGEND

TOTAL PLANTING AREA = 66 SY

TOTAL PLANTS = 14

/2

COORDIN

ATE G

RID

A D

CONNECTIC

UT

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

PPP-02

TOWN(S):

MILFORD

PARKWAY EXTENSION) OVER UNNAMED BROOK

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Bridge\Contract_Plans\BR_CP_0083_0270_PPP_07_PermitPlantingPlan.dgn FILE NAME: 7379 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

N

0083-0270

DESIGNER/DRAFTER: CLR CHECKED BY: CEP

PERMIT PLANTING PLAN

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

PERMIT PLANT LIST

COMMON NAME AND SIZE

ALNUS INCANA SPECKLED ALDER 4-5'

WILLOW 6-8'

RED-OSIER DOGWOOD 3-4'

5-7' ON CENTER

5-7' ON CENTER

5-7' ON CENTER

QTY. SPACINGBOTANICAL NAME WETLAND INDICATOR

SALIX DISCOLOR

CORNUS SERICEA

FACW

FACW

FACW

ID

A

B

C

1" = 40'

HORIZONTAL SCALE

40' 80'

ORDINARY HIGH WATER

SURVEYED EDGE OF WATER

AREA TO BE RESTORED WITH PLANTINGS

CONTROL AND REMOVAL OF INVASIVE VEGETATION (SEE NOTE 7)

STONE FOR SLOPE PROTECTION (MODIFIED RIP RAP)

C P -5

INTERS

TATE 9

5TO

D -3

R A

N

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

S T R

U C

T U

R E x

A

C C

E S S T

U N

N E L

APPROXIM

ATE PROPERTY LINE

M E R

R

IT

T C

O R P

O R

A T E W

O O

D S

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

R A

IL

R O

A D C

O M

P A

N Y

C O

M M

U T E R

M E T R

O -N

O R

T H

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

24" GAS

APPROX. LOC.

81+00

0+

1+

2+0

3+

4+

5+00

6+00

MILFO

RD PARKWAY EXTENSION

UNNAMED BROOK

STATE WETLANDS

STATE WETLANDS

WATER (TYP.)

ORDINARY HIGH

WATER (TYP.)

ORDINARY HIGH

ACCESS ROAD

TEMPORARY

EASEMENT

PERMANENT

(65" O.D. 63.11" I.D.)

OF BRIDGE NO. 06770

PROPOSED GRP PIPE LINER

PROPERTY LINE

APPROXIMATE

ROAD - NO SEEDING

PERMANENT ACCESS

EMBANKMENT

RESTORE RIPRAP

A A

B B

BB

B C

C

C

A A

B B

MATERIALS)

(FOR CONSTRUCTION

TEMPORARY EASEMENT

07.02

BR_CP_0083_0270_PPP_07_PermitPlanting_SubsetCoverSheet
BR_CP_0083_0270_PPP_07_PermitPlantingPlan
2026-06-01T14:53:55-0400
Robert J Faulkner -- Clough Harbour & Associates LLP
I am approving this document

File details come from the government source that posted it. Updated .