NTC - New DBE Requirements - Regular Dealer Affirmation Form.pdf

PDF 105 KB Posted

Attached to
Rehabilitation of Bridge No. 06770 in the City of Milford
Solicitation number
0083-0270
Issued by
New Haven County, Connecticut

About this file

This is a Notice to Contractors issued by the Connecticut Department of Transportation (CTDOT) regarding updated Disadvantaged Business Enterprise (DBE) Program requirements effective August 7, 2024. The notice establishes new preliminary goal counting determination procedures for DBE firms performing work as suppliers on federally funded projects with DBE goals. Bidders must now submit the DBE Regular Dealer/Distributor Affirmation Form along with supporting documents and DBE Commitment forms when proposing DBE suppliers for credit toward DBE goals. CTDOT will verify whether each DBE firm qualifies as a Regular Dealer or Distributor to determine eligible credit amounts. The bidder bears responsibility for verifying information provided by the named DBE and ensuring accurate counting of DBE participation, with any shortfalls caused by counting errors remaining the bidder's responsibility.

DBE Regular Dealers are eligible to receive 60% credit for the cost of materials and supplies, while DBE Distributors are eligible to receive 40% credit, with counting applied to material and supply costs including transportation. Preliminary determinations are based on the DBE's demonstrated capacity and intent to perform as a supplier or distributor as defined in 49 CFR 26.55, supported by the DBE's written responses to relevant questions and affirmation that subsequent performance will be consistent with the preliminary counting determination. The department has revised the DBE/SBE Commitment Form, which is available on the CTDOT website and must be used when submitting pre-award commitment packages. These requirements implement recent updates to the USDOT DBE Program regulations under Part 26.53(c)(1) of Title 49 Code of Federal Regulations.

View the file

Other files

File Type Posted
0083-0270_Bridge06770_06_FIO_Gas.pdf PDF
HW_CB_0083-0270_Alignment Ramp.dgn —
CTDOT_HIGHWAY_STD [02-10-25].pdf PDF
HW_CB_0083-0270_Alignment East Access Rd_ATW1.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional.dxf DXF file
TR_CP_0083_0270_MPT_MDL.dgn —
HW_CB_0083-0270_Alignment West Access Rd.dgn —
West Access Rd.xml XML file
HW_CB_0083-0270_Master_ATW1.dxf DXF file
0083-0270_Aug_5_26_solicitation_doc.pdf PDF
BR_CP_0083-0270_Bridge06770Model.dgn —
NTC - Bidx Enhanced Bidding Workflow-Rev April 2026.pdf PDF
HW_CB_0083-0270_Alignment West Access Rd.dxf DXF file
Electronic Bidding Instructions -Rev April 2026.pdf PDF
0083-0270_Bridge06770_04_Structures.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional_Annotation.dxf DXF file
HW_CB_0083-0270_Alignment 72 Pipe.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN.dxf DXF file
Online Q and A Instruction.pdf PDF
HW_CB_0083-0270_Layout_ATW1.dgn —
Bidders Checklist.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Annotation.dxf DXF file
Milford Connector Ramp.xml XML file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12)_Annotation.dxf DXF file
HW_CB_0083-0270_Alignment Ramp.dxf DXF file
HW_CB_0083-0270_Layout_ATW1_Default.dxf DXF file
EEDFileManifest.xlsx XLSX spreadsheet
HW_CB_0083-0270_Alignment 72 Pipe.dgn —
CL_72_PIPE.xml XML file
0083-0270_Bridge06770_02_Revisions.pdf PDF
HW_CB_0083-0270_Master_ATW1_ALI-GEOMETRY-CURVE.dxf DXF file
HW_CB_0083-0270_Alignment East Access Rd_ATW1.dgn —
PROSPECTIVE BIDDERS - 2.pdf PDF
HW_CB_0083-0270_Layout_ATW1.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Boundary.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12).dxf DXF file
HW_CB_0083-0270_Master_ATW1_highway plan Existing.dxf DXF file
HazMat Inspection Letter.pdf PDF
PROSPECTIVE BIDDERS - 1.pdf PDF
East Access Rd ATW1.xml XML file
0083-0270 Contract Special Provisions.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12)_Boundary.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12).dgn —
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional_Boundary.dxf DXF file
0083-0270 Contract Special Provisions.pdf.crdownload CRDOWNLOAD file
BR_CP_0083-0270_Bridge06770Model.dxf DXF file
0083-0270_Aug_10_26_solicitation_doc.pdf PDF
BR_CP_0083-0270_Bridge06770Details.dgn —
BR_CP_0083-0270_Bridge06770Details.dxf DXF file
0083-0270 Invitation to Bid.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sincerely, S T A T E O F C O N N E C T I C U T

DEPARTMENT OF TRANSPORTATION

2800 BERLIN TURNPIKE, P.O. BOX 317546

NEWINGTON, CONNECTICUT 06131-7546

PHONE 860-594-3128

August 7, 2024

Subject – New Disadvantaged Business Enterprise (DBE) Program Requirements – DBE Regular

Dealer/Distributor Affirmation Form and New DBE/SBE Commitment Form

NOTICE TO CONTRACTORS

The United States Department of Transportation (USDOT) recently updated the DBE Program regulations.

Part 26.53(c)(1) of Title 49 Code of Federal Regulations now requires CTDOT to make a preliminary goal counting determinations for each DBE firm that will be performing work for DBE credit as a supplier.

Effective today, when submitting a DBE supplier for credit towards the DBE goal, bidders must submit the

DBE Regular Dealer/Distributor Affirmation Form (Affirmation Form) and supporting documents with their

DBE Commitment forms for federally funded projects having DBE goals.

It is the bidder’s responsibility to verify the information provided by the named DBE and ensuring that the counting of the DBE's participation is accurate. Any shortfall caused by errors in counting are the responsibility of the bidder.

When reviewing the bidder’s Commitment forms for DBE suppliers, CTDOT will verify if the DBE firm submitted for DBE credit will be acting as a Regular Dealer or a Distributor, to determine the amount of credit eligible to be counted toward the DBE goal. DBE Regular Dealers are eligible to receive 60% credit for the cost of materials and supplies and DBE Distributors are eligible to receive 40% credit, credit will be counted for the cost of materials and supplies (including transportation costs).

Determinations are based on the DBE’s demonstrated capacity and intent to perform as a supplier or distributor as defined in 49 CFR 26.55 and the DBE’s written responses to relevant questions and their affirmation that subsequent performance of a commercially useful function will be consistent with the preliminary counting of such participation.

The Department has also revised the DBE/SBE Commitment form which is attached and will be available on the Department’s website. Please use the new form when submitting your pre-award commitment package to the Department.

For more detailed information, please refer to the following links below.

eCFR :: 49 CFR 26.55 -- How is DBE participation counted toward goals?

Forms (rev 7/25)

Gregory D. Straka

Contracts and Agreements Manager

Bureau of Finance and Administration https://www.ecfr.gov/current/title-49/subtitle-A/part-26/subpart-C/section-26.55 https://portal.ct.gov/dot/business/forms?language=en_US

File details come from the government source that posted it. Updated .