EEDFileManifest.xlsx
XLSX spreadsheet 82 KB Posted
- Solicitation number
- 0083-0270
- Issued by
- New Haven County, Connecticut
About this file
This is an Electronic Engineering Data (EED) File Manifest submitted to the Connecticut Department of Transportation (CTDOT) for Project Number 0083-0270, the Milford Connector Bridge 06770 project. The manifest was submitted on May 29, 2026, by Amanda Czerwiec of Clough Harbor and Associates. The deliverables consist of multiple CAD files organized by category, including bridge design models (Bridge No. 06770), highway alignment files for Milford Parkway, East Access Road, and West Access Road, highway layout and master model files, ground survey files and terrain models for District 3, and traffic models. All files have been reviewed and certified as ready for EED submission in accordance with CTDOT guidelines and utilize NAD 1983/NAVD 1988 survey datums.
The manifest includes a comprehensive Electronic Engineering Data Quality Control Checklist that establishes CTDOT's technical requirements for CAD file submissions. All deliverables must be compatible with CTDOT's Digital Design Environment (DDE), utilize real-world modified state plane coordinates, and be geospatially correct. Specific requirements address 2D and 3D DGN files, coordinate geometry alignments, structure and bridge models, traffic signal and sign equipment, and terrain models with 3D meshes. The quality control checklist mandates that files be free of construction lines, cross-sections, and annotation; contain only final design information with preliminary and alternate data removed; and meet stringent surface smoothness standards for automated machine control guidance purposes, including minimum offset specifications for vertical surfaces of 1/12 to 1/8 inch.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EED File Manifest
| Electronic Engineering Data File Manifest | |
| Project Number: | 0083-0270 |
| Date: | 29-May-26 |
| Submitted by: | AMANDA CZERWIEC |
| Email: | ACZERWIEC@CHACOMPANIES.COM |
| Phone #: | (860) 290-4100 |
| Unit/Company Name: | CLOUGH HARBOR AND ASSOCIATES |
| Survey Ground File Datum: | N.A.D. 1983 / N.A.V.D. 1988 |
| The files listed on the attached manifest have been reviewed in accordance with EED Guidelines and are ready for EED submission. | |
| File Name | Desciption / Notes |
| BR_CP_0083-0270_Bridge06770Details | Bridge No. 06770 Model |
| BR_CP_0083-0270_Bridge06770Model | Bridge No. 06770 Model |
| HW_CB_0083-0270_Alignment Ramp | MILFORD PARKWAY BASELINE FILE |
| HW_CB_0083-0270_Alignment East Access Rd_ATW1 | EAST ACCESS ROAD BASELINE FILE |
| HW_CB_0083-0270_Alignment West Access Rd | WEST ACCESS ROAD BASELINE FILE |
| HW_CB_0083-0270_Alignment 72 Pipe | 72" PIPE BASELINE FILE |
| HW_CB_0083-0270_Layout_ATW1 | HIGHWAY LAYOUT |
| HW_CB_0083-0270_Master_ATW1 | HIGHWAY MASTER MODEL - ALL FILES REFERENCED IN |
| SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN | DISTRICT 3 - EXISTING GROUND SURVEY FILE AND TERRAIN MODEL |
| SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12) | DISTRICT 3 - EXISTING GROUND SURVEY FILE AND TERRAIN MODEL |
| SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional | DISTRICT 3 - EXISTING GROUND SURVEY FILE AND TERRAIN MODEL |
| TR_CP_0083_0270_MPT_MDL | MPT |
Connecticut Department of Transportation Electronic Engineering Data File Manifest Page &P of &N
EED QC Checklist
| Electronic Engineering Data Quality Control Checklist | |
| DGN Files | |
| All CAD Files are compatible with CTDOT’s current CTDOT Digital Design Environment (DDE). | |
| Elements are placed in real world modified state plane coordinates and be geospatially correct. | |
| Delivered Model Types are Design Models only (no Sheet Models or Drawing Models are required). | |
| All graphical elements are at the correct geospatial location. | |
| All graphical elements are placed on the correct CTDOT Level. | |
| Files are free of all cross sections, profiles, construction lines for design purposes. | |
| Files are free of annotation that should reside in the cut sheets. | |
| Files have clean reference attachments, only needed reference files & no redundant references. | |
| 3D DGN Files | |
| All 3D files have lines and elements at the proper elevation (no spikes). | |
| Proposed Coordinate Geometry DGN Files | |
| Only final coordinate geometry alignments are included (preliminary and alternate information has been removed). | |
| Coordinate geometry alignments names and descriptions are intuitive. | |
| Proposed Structure/Bridge DGN Files | |
| Structure centerlines of bearings are included. | |
| Structure centerlines of girders are included. | |
| Elements are placed using CTDOT’s customized Bentley Software tools. | |
| Components modeled using OpenBridge are Feature Model Elements. | |
| All elements are placed at 1:1 scale. | |
| Proposed Traffic DGN Files | |
| All element in Signal Equipment and Signs models have the proper Item Types attached as directed in the CTDOT CAD Manual. | |
| CTDOT CONNECT DDE GUIDE VOLUME 6 - TRAFFIC ENGINEERING BASE MODELING | |
| Terrain Models and 3D Meshes | |
| Visualized both the contours and triangles in a 3D file. Looked at it from the top and front, side, and isometric view. No irregular dips, spikes or voids in the surface are apparent. | |
| Triangles were viewed on top of the proposed design file. The triangles do not cross obvious breaklines such as centerlines, edges of pavement, edges of shoulders, etc. | |
| Contours were viewed to ensure the low points line up with the proposed drainage structures and structure flowlines match the proposed surface. | |
| In critical areas (i.e. intersections), contours were viewed at construction equipment tolerance intervals (typically 1” or less) to insure smooth surfaces for automated machine control/guidance purposes. | |
| No vertical faces are present (all vertical surfaces are to be offset a minimum of 1/12 in – 1/8 in to be accepted into the AMG software). |
Directions:
Start by selecting INCLUDED or N/A (not included) for each section below. If INCLUDED is selected check to make sure each item in that section is correctly incorporated. If N/A (not included) is selected, items under that section will not need to be checked.
Please note the first section is always included, so this drop box can not be changed.
https://portal.ct.gov/DOT/Engineering-Applications/CTDOT-CONNECT-DDE-eBook-Volume-006---Traffic-Engineering-Base-Modeling/Section-1---Traffic-Engineering-Base-Modeling-Overviewhttps://portal.ct.gov/DOT/Engineering-Applications/CTDOT---CONNECT-DDE Pick list
| INCLUDED |
| N/A (not included) |
image1.png image2.png
File details come from the government source that posted it. Updated .