Rehabilitation of Bridge No. 06770 in the City of Milford
Solicitation number
0083-0270
Issued by
New Haven County, Connecticut

About this file

This is a highway contract plan document prepared by the Connecticut Department of Transportation for the Rehabilitation of Bridge No. 06770 over Unnamed Brook on State Route 796 (Milford Parkway Extension) in the Town of Milford, Connecticut. The project involves construction of access roads, culvert work, and drainage improvements to facilitate bridge rehabilitation. The contract includes construction of a permanent east access road (Site No. 1) spanning approximately 6+26 stations and a temporary west access road (Site No. 2) to be removed upon project completion. The project encompasses typical sections with processed aggregate base, geotextile materials, erosion control matting, geocell installation, and slope protection details. The scope includes drainage work with proposed 24-inch and 30-inch corrugated metal pipe (CMP) and 72-inch CMP liner installation, removal of existing utilities and drainage structures, sedimentation control systems, and temporary earth retaining systems (TERS). The plans detail alignment geometry with nine curves, cross-sections at multiple stations, and profiles for both the Milford Parkway extension and access roads. Project control points CP-51 and CP-52 establish survey datum based on North American Vertical Datum (NAVD) 1988 using Connecticut Coordinate System NAD 83 (2011).

The contract plans were surveyed by Connecticut Department of Transportation District 4 in November 2021 and revised as of July 2023 to extend topography 750 feet to the north. The project identification number is 0083-0270 with reference number 0170-3250. Utility locations shown on the plans were supplied by Iroquois Pipeline Operating Company (gas) and Town of Milford Public Works (sewer), though these are noted as preliminary and approximate. The plans indicate that disturbed areas below the wetland limit shall be seeded with wetland grass establishment, with erosion control matting Type D required on slopes of 3:1 or steeper. Temporary laydown areas and the west access road are designated for removal upon project completion, with existing ground conditions to be restored. The project includes provisions for geocell installation with minimum 6-inch thickness stone infill, geotextile separation materials, and hook anchors per manufacturer specifications.

View the file

Other files

File Type Posted
0083-0270_Bridge06770_06_FIO_Gas.pdf PDF
HW_CB_0083-0270_Alignment Ramp.dgn —
CTDOT_HIGHWAY_STD [02-10-25].pdf PDF
HW_CB_0083-0270_Alignment East Access Rd_ATW1.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional.dxf DXF file
TR_CP_0083_0270_MPT_MDL.dgn —
HW_CB_0083-0270_Alignment West Access Rd.dgn —
West Access Rd.xml XML file
HW_CB_0083-0270_Master_ATW1.dxf DXF file
0083-0270_Aug_5_26_solicitation_doc.pdf PDF
BR_CP_0083-0270_Bridge06770Model.dgn —
NTC - Bidx Enhanced Bidding Workflow-Rev April 2026.pdf PDF
HW_CB_0083-0270_Alignment West Access Rd.dxf DXF file
Electronic Bidding Instructions -Rev April 2026.pdf PDF
0083-0270_Bridge06770_04_Structures.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional_Annotation.dxf DXF file
HW_CB_0083-0270_Alignment 72 Pipe.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN.dxf DXF file
NTC - New DBE Requirements - Regular Dealer Affirmation Form.pdf PDF
Online Q and A Instruction.pdf PDF
HW_CB_0083-0270_Layout_ATW1.dgn —
Bidders Checklist.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Annotation.dxf DXF file
Milford Connector Ramp.xml XML file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12)_Annotation.dxf DXF file
HW_CB_0083-0270_Alignment Ramp.dxf DXF file
HW_CB_0083-0270_Layout_ATW1_Default.dxf DXF file
EEDFileManifest.xlsx XLSX spreadsheet
HW_CB_0083-0270_Alignment 72 Pipe.dgn —
CL_72_PIPE.xml XML file
0083-0270_Bridge06770_02_Revisions.pdf PDF
HW_CB_0083-0270_Master_ATW1_ALI-GEOMETRY-CURVE.dxf DXF file
HW_CB_0083-0270_Alignment East Access Rd_ATW1.dgn —
PROSPECTIVE BIDDERS - 2.pdf PDF
HW_CB_0083-0270_Layout_ATW1.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Boundary.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12).dxf DXF file
HW_CB_0083-0270_Master_ATW1_highway plan Existing.dxf DXF file
HazMat Inspection Letter.pdf PDF
PROSPECTIVE BIDDERS - 1.pdf PDF
East Access Rd ATW1.xml XML file
0083-0270 Contract Special Provisions.pdf PDF
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12)_Boundary.dxf DXF file
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_102(10.12).dgn —
SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN_Additional_Boundary.dxf DXF file
0083-0270 Contract Special Provisions.pdf.crdownload CRDOWNLOAD file
BR_CP_0083-0270_Bridge06770Model.dxf DXF file
0083-0270_Aug_10_26_solicitation_doc.pdf PDF
BR_CP_0083-0270_Bridge06770Details.dgn —
BR_CP_0083-0270_Bridge06770Details.dxf DXF file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST ACCESS ROAD SITE NO. 2 CROSS SECTIONSXSC-11EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-01

WEST ACCESS ROAD SITE NO. 2 CROSS SECTIONSXSC-10ACCESS ROAD PROFILESHWY-09

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-09ACCESS ROAD PLANHWY-08

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-08MILFORD PARKWAY PROFILEHWY-07

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-07HIGHWAY PLANHWY-06

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-06ALIGNMENT GEOMETRY AND CURVE DATAHWY-05

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-05TYPICAL SECTIONS AND DETAILSHWY-04

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-04TYPICAL SECTIONSHWY-03

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-03EXISTING CONDITIONSHWY-02

EAST ACCESS ROAD SITE NO. 1 CROSS SECTIONSXSC-02HIGHWAY INDEX OF DRAWINGSHWY-01

DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER

INDEX OF DRAWINGS

03 - HIGHWAY

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-01

TOWN(S):

MILFORD

PARKWAY EXTENSION) OVER UNNAMED BROOK

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083_0270_HWY_01_INDEX.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

N

0083-0270

DESIGNER/DRAFTER: RT CHECKED BY: JP

DRAWINGS

HIGHWAY INDEX OF

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

03.01

ROCKY HILL, CT 06067

SUITE 301

400 CAPITAL BOULEVARD

& ASSOCIATES, LLP

CLOUGH, HARBOUR

DESIGNED BY:

C T

C T

C T

C T

C T

C T

C T

4C T

C T

C T

C T

8C

T

F E

D

C T

F E

D

C T

F E

D

C T

O H

W

O H

W

O H

W

CP-52

CP-51

M

IL

F O

R D P

A R

K W

A Y E

X T E

N S

IO

N

IN

T E R S T A

T E

TO

M B

R S

O L

ID

W

H

IT

E E

B

IT M

B R

M B

R

M B

R

S O

L

ID

Y

E L L

O W

S O

L

ID

Y

E L L

O W

S O

L

ID

W

H

IT

E

B C

L C

NAVD 1988

CONCRETE LIGHT POLE BASE

CHISELED SQUARE IN SW COR.

EL=98.493 BM A

R

IP

-R

A P

R

IP

-R

A P

R

IP

-R

A P

R

IP

-R

A P

R

IP

-R

A P

R

IP

-R

A P

R

IP

-R

A P

R

IP

-R

A P

R

IP

-R

A P

RIP-R

AP

R

IP

-R

A P

R

IP

-R

A P

E

B

IT

M B

R S

O L

ID

W

H

IT

E S

O L

ID

Y

E L L O

W M

B R

M B

R S

O L

ID

Y

E L L O

W S

O L

ID

W

H

IT

E B

C L C

M B

R

E

B

IT

M B

R

S O

L

ID

W

H

IT

E S O

L

ID

Y

E L L O

W

M B

R M

B R

S O

L

ID

Y

E L L O

W S O

L

ID

W

H

IT

E B

C L C

M B

R

NAVD 1988

MAG NAIL IN LEDGE OUTCROP

EL=88.602 BM B

A P P R

O X H

W Y L

IN

E

A P P R

O X H

W Y L

IN

E

D R

IV

E

G R

A V

E L

DRIVE

GRAVEL

W E T L A

N D F

L A

G S

F

IE

L D L

O C

A T E

D

FED-1

CT-46

FED-2

CT-47

FED-3

CT-48

FED-4

CT-49

FED-5

CT-50

FED-6

CT-51

FED-7

CT-52

FED-8

CT-53

FED-9

CT-54

FED-10

CT-55

CT-45

CT-44

CT-43

CT-42

CT-41

CT-40

CT-39

CT-37

CT-38

CT-36

CT-35

CT-34

CT-33

CT-32

CT-31

PLOT 5U

DATA

PLOT 5W

DATA

CT-30CT-29

CT-28

CT-26

CT-25

CT-24

CT-23

CT-22

CT-21

CT-19

CT-18

CT-17

CT-16

CT-15

CT-20

W E T L A

N D F

L A

G S

F

IE

L D L

O C

A T E

D

D-3017

RAN

D-3016

RAN

CT-11

IWC

CT-12

CT-13

CT-14

CT-1

CT-10

CT-9

CT-8

CT-7

CT-6

CT-5

CT-4

CT-3

IWC

IWC

CT-2

(N/F)

CHD

(N/F)

CHD

(N/F)

CHD

(N/F)

CHD

(N/F)

CHD

FL=44.32

FL=21.67

FL=39.63

FL=40.56

FL=42.71

FL=68.18

BT=69.02

FL=71.32 (W)

FL=71.37 (E)

FL=74.52 (N)

TF=85.52

"C"CB

BT=61.64

FL=62.29 (SW)

FL=63.14 (E)

TF=68.74

STORM MH

BT=70.00

FL=70.20 )W)

FL=71.30 (E)

TF=88.00

STORM MH

STRUCTURE #03226

12 x 12 ACCESS TUNNEL

FL=76.31

TF=88.76

SAN MH

FL=81.05 (SW)

FL=76.25 (N, S)

TF=88.85

SAN MH

FL=74.96

TF=80.96

SAN MH

FL=69.88

TF=75.88

SAN MH

BT=75.84

FL=76.93

TF=88.59

"C"CB

BT=74.00

FL=74.18

TF=91.06

"C" CB

BT=96.95

FL=97.94

TF=101.19

"C" CB

FL=80.94

(FULL OF MUD)

5.56BT=7

FL=77.0±

TF=79.36

"C"CB

D E L

IN

D E L

IN

D E L

IN

D R

IV

E

G R

A V

E L

LEDGE

L E

D G

E

L E

D G

E

LE

D

G E

MARKER

GAS PIPELINE

BT=70.49

FL=72.34 (W)

TF=76.19

"C-L"CB

FL=42.65

23.34' FROM OUTLET

IN CULVERT

VERTICAL KINK

E

B

IT

BT=74.96

FL=76.26

TF=83.46

DBL "C"CB

BT=75.34

FL=77.04

TF=83.34

"C"CB

SIG

N

M

IL

F O

R D P

A R

K W

A Y E

X

TE

N S

IO

N

40' 80'

1"=40'

HORIZONTAL SCALE

NOTES:

IROQUOIS PIPELINE OPERATING COMPANYGAS:

TOWN OF MILFORD PUBLIC WORKSSEWER:

WERE SUPPLIED BY THE FOLLOWING UTILITY COMPANIES:

FIELD VERIFIED AND SHOULD BE CONSIDERED APPROXIMATE. UTILITY LOCATIONS

UTILITIES SHOWN WERE TAKEN FROM EXISTING UTILITY PLANS, NOT ALL HAVE BEEN7.)

PRELIMINARY AND SHOULD BE CONSIDERED APPROXIMATE.

6.) HIGHWAY LINES ARE TAKEN FROM CONSTRUCTION PROJECT 83-201 WHICH ARE

NOT ALL HAVE BEEN FIELD VERIFIED AND SHOULD BE CONSIDERED APPROXIMATE.

PROPERTY LINES ARE TAKEN FROM TOWN OF MILFORD TAX ASSESSOR MAPS. 5.)

A LOCAL DIGITAL BENCH RUN THROUGH PROJECT CONTROL.

DERIVED FROM A GPS TRANSFER OF CGS BM 3217 TO CP-51 FOLLOWED BY

VERTICAL DATUM BASED ON NORTH AMERICAN VERTICAL DATUM (N.A.V.D. 1988)4.)

(GPS OBSERVATIONS) ON 9/15/2021.

2010.0, GEOID 18 UTILIZING CT DOT CORS STATIONS: CTBR, CTDA, CTGU, AND NYRH

400 FOOT GRID BASED ON CONNECTICUT COORDINATE SYSTEM NAD 83 (2011) EPOCH3.)

FIELD BOOK: DATA COLLECTOR & "OUT OF DISTRICT D" PGs 21-22, 29, & 63-67.2.)

SURVEY BY CTDOT DISTRICT 4 SURVEYS.1.)

STATE OF CONNECTICUT

DEPARTMENT OF TRANSPORTATION

OVER UNNAMED BROOK

@ BRIDGE #06770

ROUTE 796 (MILFORD CONNECTOR)

IN THE TOWN OF

MILFORD

PROJECT NO. 0170-3250

REVISIONS

NO. DATE DESCRIPTION REV. BY

1 2-28-22 REVISE OHW/STREAM LINETYPES JMP

2 7-21-23

TO THE NORTH

EXTEND TOPO 750'

JMP

FILE: SV_D4_0170_3250_MILFORD_CONNECTOR_BR06770_GRN.dgn

M. ZOMBARCHECKED BY:

J. PAULPLOTTED BY:

B. ATEMSURVEYED BY:

NOVEMBER 2021

N=651502.925

E=907509.301

CP-52 (IRON PIN)

(TO INTERSTATE 95)

MILFORD CONNECTOR

MBR

6.83'

PM

3.71'

PM

6.15'

PM

N=652066.209

E=907770.912

CP-51 (IRON PIN)

(TO ROUTE 15 SB)

MILFORD CONNECTOR

DBL C CB

DH IN CL TC

3.96'

PM

M

BR

SIGN BASE

DH IN CONC.

4.10'

41.42'

2373/506

612 WHEELERS FARMS ROAD, LP

N/F

2897/304

MERRITT CORPORATE WOODS

N/F

STATE OF CONNECTICUT

N/F

STATE OF CONNECTICUT

N/F

RAILROAD COMPANY

COMMUTER

METRO-NORTH

N/F

H O

U S A

TO

N

IC

R

IV

E R

ST

EP

P

ED

C

H A

N N

EL

H

Y D

R O

SE

C

TI

O N

' D

O W

N

ST

R

EA

M O

F

W

IN

G W

A

LL

H

Y D

R O

SE

C

TI

O N

5' D

O W

N

ST

R

EA

M O

F

W

IN

G W

A

LL

H

YD

RO

SE

C

TI

O

N

5' U

PS

TR

EA

M O

F

W

IN

G W

A

LL

H

YD

RO

SE

C

TI

O

N

5' D

O W

N

ST

REA

M O

F

W

IN

G W

ALL

H

YDRO

SE

CTIO

N

5'

UPS

TR

EAM

O F

WIN

GWALL H

YDROSEC

TIO

N

30'

UPST

REAM O

F

WINGWALL HYDROSECTION

80' UPSTREAM OF

WINGWALL HYDROSECTION

180' UPSTREAM OF

R C

P

24" RCP

24" CMP

C

M P

" R

C P /C

M P

" C

M P

B R

O O

K

S A

N

S A

N

S A

N

STATE OF CONNECTICUT

N/F

S A

N

S A

N

12" RCP

" C

M P

12" CMP

12" RCP

18" RCP

S A

N

O

U T L E T U

N K

N O

W N

S A

F

O U

T L E T

G A

S

A P P

R O

X L O

C

R C

P

R C

P

IN

V

E R

T

.7

C

M P

IN

V

E R

T

.2

R

C P

C T

C T

C T

C T

C T

C T

C T

C T

C T

C T

C T

C T

C T

C T

C T

C T

1C

T

C T

7 C

T

8 C T

C T

0C

T

C

T

C T

C T

C T

5C

T

6C T

C T

8C T

C T

C T

C T

C T

C T

4C T

O H

W

O H

W

O H

W

O H

W

O H

W

O H

W

O H

W

O H

W

O H

W

O H

W

IN

V

E R

T

.1

R

C P

IN

V

E R

T

.2

R

C P

F L

A R

E D

E N

D

IROQUOIS PIPELINE OPERATING COMPANYGAS:

TOWN OF MILFORD PUBLIC WORKSSEWER:

WERE SUPPLIED BY THE FOLLOWING UTILITY COMPANIES:

FIELD VERIFIED AND SHOULD BE CONSIDERED APPROXIMATE. UTILITY LOCATIONS

UTILITIES SHOWN WERE TAKEN FROM EXISTING UTILITY PLANS, NOT ALL HAVE BEEN7.)

PRELIMINARY AND SHOULD BE CONSIDERED APPROXIMATE.

6.) HIGHWAY LINES ARE TAKEN FROM CONSTRUCTION PROJECT 83-201 WHICH ARE

NOT ALL HAVE BEEN FIELD VERIFIED AND SHOULD BE CONSIDERED APPROXIMATE.

PROPERTY LINES ARE TAKEN FROM TOWN OF MILFORD TAX ASSESSOR MAPS. 5.)

A LOCAL DIGITAL BENCH RUN THROUGH PROJECT CONTROL.

DERIVED FROM A GPS TRANSFER OF CGS BM 3217 TO CP-51 FOLLOWED BY

VERTICAL DATUM BASED ON NORTH AMERICAN VERTICAL DATUM (N.A.V.D. 1988)4.)

(GPS OBSERVATIONS) ON 9/15/2021.

2010.0, GEOID 18 UTILIZING CT DOT CORS STATIONS: CTBR, CTDA, CTGU, AND NYRH

400 FOOT GRID BASED ON CONNECTICUT COORDINATE SYSTEM NAD 83 (2011) EPOCH3.)

FIELD BOOK: DATA COLLECTOR & "OUT OF DISTRICT D" PGs 21-22, 29, & 63-67.2.)

SURVEY BY CTDOT DISTRICT 4 SURVEYS.1.)

83/2011

C O

O R

D

IN

A T

E G

R

ID

AD

O

N N

E C

T

IC

U T

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-02

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Plan_ATW1.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

EXISTING CONDITIONS

TRANSPORTATION

A P P

R O

X

IM

A T E P

R O

P E

R T Y L

IN

E

1" = 40'

HORIZONTAL SCALE

40' 80'

MATCH MARK - SEE ABOVE

MATCH MARK - SEE BELOW

03.02

Squiggly

PAYMENT.

INSTALLMENT REQUIREMENTS AND BASIS OF

SPECIAL PROVISIONS FOR ADDITIONAL

MANUFACTURERS RECOMMENDATIONS. SEE

AND FASTENERS SHALL FOLLOW THE

FASTENERS. NUMBER AND LOCATION OF ANCHORS

REQUIRED ANCHORS AND MECHANICAL

A MINIMUM THICKNESS OF 6". ALSO INCLUDED ARE

GEOCELL AND STONE INFILL. GEOCELL SHALL HAVE

PREPERATION, GEOTEXTILE (SEPARATION - CLASS 1),

3. THE GEOCELL ITEM INCLUDES SUBGRADE

ON SLOPES 3:1 OR STEEPER.

2. EROSION CONTROL MATTING TYPE D SHALL BE USED

BE SEEDED WITH WETLAND GRASS ESTABLISHMENT.

1. DISTURBED AREAS BELOW THE WETLAND LIMIT SHALL

NOTES:

2.0% 2:1 (M

AX.)3:1

(T

YP

EXISTING GROUND

2.0%

6.0'6.0' - 23.0'

G

I

A

B

F

C

J HOOK ANCHOR

GEOCELL WITH 6" PROCESSED AGGERGATE BASE (SEE NOTE 3)

FOR ACCESS ROAD

GEOTEXTILE (SEPARATION - CLASS 1),

EROSION CONTROL MATTING TYPE D

4" TOPSOIL AND TURF ESTABLISHMENT

FORMATION OF SUBGRADE

6" PROCESSED AGGREGATE BASE

LEGEND

A

B

C

D

E

F

G

TYPICAL SECTION

EAST ACCESS ROAD - SITE NO. 1

STA. 2+25.00 TO STA. 6+00.00

STA. 0+25.00 TO STA. 1+90.00

N.T.S

ROAD

ACCESS �

2:1 (M

AX.)3:1

(TY

P.)

D

E

2.0%

2:1 (MAX.)

3:1 (TYP.)

EXISTING GROUND

2.0%

6.0' 6.0'

G

I

A

B

F

C

TYPICAL SECTION

EAST ACCESS ROAD - SITE NO. 1

STA. 1+90.00 TO STA. 2+25.00

N.T.S

ROAD

ACCESS �

4:1

D

E

2:1 (MAX.)

3:1 (TYP.)

3.0'

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-03

MILFORDPARKWAY EXTENSION) OVER UNNAMED BROOK

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Typical_ATW1.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

TYPICAL SECTIONS

TRANSPORTATION

1" = 5'

HORIZONTAL SCALE

5' 10'

03.03

(TYP.)

N.T.S

TYPICAL SECTION

ACCESS ROAD - SITE NO. 2

TEMPORARY WEST

12'-22.7'

2%

P.A.G.

EXISTING GROUND

2:1 (MAX.)

2:1(MAX.)

C

D

E

F

E

F

BL

2%

(TYP.)

N.T.S

TYPICAL SECTION

ACCESS ROAD - SITE NO. 2

TEMPORARY WEST

12'-22.7'

2%

P.A.G.

EXISTING GROUND

C

D

BL

2%

(SEE STRUCTURE PLAN FOR LIMITS)

TEMPORARY EARTH RETAINING SYSTEM (TERS)

(SEE STRUCTURE PLAN FOR LIMITS)

TEMPORARY EARTH RETAINING SYSTEM (TERS)

STA. 80+00 TO STA. 80+50

STA. 80+50 TO STA. 80+91

1.5:1 (MAX.)

(TYP.)

N.T.S

SLOPE PROTECTION DETAIL

EXISTING GROUND

FOR GRADING AND LIMITS)

ROAD SLOPE CONSTRUCTION (SEE HWY-06

AND WHERE IMPACTED DUE TO ACCESS

STONE REPAIR ABOVE INLET HEADWALL

EXISTING 24" CMP

EXISTING GROUND VARIES FROM 16' TO 25'

EXISTING 24" GAS LINE. DEPTH FROM

B

LEGEND

FOR ADDITIONAL INSTALLATION REQUIREMENTS AND BASIS OF PAYMENT.

ANCHORS AND MECHANICAL FASTNERS. SEE SPECIAL PROVISIONS

MINIMUM THICKNESS (HEIGHT) OF 6". ALSO INCLUDED ARE REQUIRED

OVERFILL OF STONE INFILL, TOP COURSE. THE GEOCELL SHALL HAVE A

GEOTEXTILE (HIGH SURVIVABILITY), GEOCELL STONE INFILL, AND 1"

3. ITEM NO. 0755040A "GEOCELL FOR ACCESS ROADS" TO INCLUDE

OR STEEPER. NOT TO BE PLACED IN WETLAND.

2. EROSION CONTROL MATTING TYPE D SHALL BE USED ON SLOPES 3:1

SEEDED WITH WETLAND GRASS ESTABLISHMENT.

1. DISTURBED AREAS BELOW THE WETLAND LIMIT SHALL BE

NOTE:

(SEE HIGHWAY PLAN FOR LIMITS)

INSTALL MD-1 END ANCHORAGE TYPE 1

(SEE HIGHWAY PLAN FOR LIMITS)

REMOVE METAL BEAM RAIL

EROSION CONTROL MATTING TYPE D

4" TOPSOIL AND TURF ESTABLISHMENT

FORMATION OF SUBGRADE

12" PROCESSED AGGREGATE BASE

12" MODIFIED RIP RAP

FOR ACCESS ROAD

GEOTEXTILE (SEPARATION - CLASS 1),

A

B

C

D

E

F

G

H

A

A

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-04

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Typical_ATW1.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

DETAILS

TYPICAL SECTIONS AND

TRANSPORTATION

HORIZONTAL SCALE

03.04

-5

C P -5

INTERS

TATE 9

5TO

N A

V D

C O

N C

R E T E L

IG

H T P

O L E B

A S E

C H

IS

E L E

D S

Q U

A R

E

IN

S

W C

O R

E L .4

B M A

N A

V D

M A

G N

A

IL

IN

L

E D

G E O

U T C

R O

P E L .6

APPROX. HWY LINE

D -3

R A

N

D -3

R A

N

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

APPROXIM

ATE PROPERTY LINE

W

H E E L E R S F

A R

M S R

O A

D , L

P

N F

M E R

R

IT

T C

O R P

O R

A T E W

O O

D S

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

R A

IL

R O

A D C

O M

P A

N Y

C O

M M

U T E R

M E T R

O -N

O R

T H

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

24" GAS

APPROX. LOC.

24" GAS

APPROX. LOC.

CURVE #

CURVE #2

D 07°05'40"

T 395.22'

L 735.10'

R 807.62'

DELTA 52°09'04"

16+55.57PI

CURVE #1

D 04°24'08"

T 244.78'

L 483.90'

R 1301.52'

DELTA 21°18'09"

22+40.23PI

CURVE #2

E 907561.85'

N 651670.58'

19+95.46PCC

CURVE DATA MILLFORD CONNECTOR

+0

+0

+0

18+

19+00

20+00 21+00

22+00

23+00

24+00

25+00

26+00

27+00

28+00

D 03°33'51"

T 528.18'

L 1020.64'

R 1607.60'

DELTA 36°22'34"

30+07.54PI

CURVE #3

E 907759.13'

N 652109.40'

24+79.36PCC

CURVE #3

81+00

N66°14'24"W

S36°45'30"W

12.56'

128.04'

D 98°30'40"

T 5.57'

L 9.41'

R 7.00'

DELTA 77°00'05"

80+18.12PI

CURVE #8

E 907569.78'

N 651887.35'

80+00.00Begin Sta.

E 907473.23'

N 651787.61'

81+50.00End Sta.

E 907558.28'

N 651892.41'

80+12.56PC

E 907549.85'

N 651890.19'

80+21.96PT

CURVE #8

E 907500.54'

N 651824.17'

12+49.91 = Sta. 81+04.36Sta.

N09°11'52"W

N35°58'56"W

15.61'

229.00'

D 88°08'50"

T 15.48'

L 30.39'

R 65.00'

DELTA 26°47'04"

10+31.09PI

CURVE #9

E 907634.41'

N 651615.96'

10+00.00Begin Sta.

E 907485.80'

N 651844.48'

12+75.00End Sta.

E 907631.91'

N 651631.37'

10+15.61PC

E 907620.34'

N 651659.17'

10+46.00PT

CURVE DATA 72" PIPE

CURVE #9

+0

E 907628.16'

N 651644.87'

10+29.75 = Sta. 53+09.08Sta.

NOTES:

LEGEND

MILFO

RD PARKWAY EXTENSION

/2

COORDIN

ATE G

RID

D

CONNECTIC

UT

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-05

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Plan_ATW1.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

AND CURVE DATA

ALIGNMENT GEOMETRY

TRANSPORTATION

HOUSATONIC RIVER

3. SEE TYPICAL SECTIONS FOR ACCESS ROAD MATERIAL COMPOSITION AND DETAILS.

AND WORK AREA ADJACENT TO THE CULVERT INLET SHALL BE REMOVED UPON COMPLETION.

2. EAST ACCESS ROAD IS PERMENANT AND SHALL REMAIN AFTER CONSTRUCTION. LAYDOWN

1. WEST ACCESS ROAD IS TEMPORARY AND IS TO BE REMOVED UPON PROJECT COMPLETION.

STATE/FEDERAL INLAND WETLAND LIMITS

SURVEYED EDGE OF WATER

STATE-ONLY WETLANDS

ORDINARY HIGH WATER

UNNAMED BROOK

1" = 40'

HORIZONTAL SCALE

40' 80'

CURVE DATA PERMANENT EAST ACCESS ROAD AND TEMPORARY WEST ACCESS ROAD

CURVE #4 CURVE #5

CURVE #6

CURVE #7

0+

1+

2+0

3+

4+

5+00

6+00

N17 °3 5' "W

N19°36'37"E

N15°40'36"W

N50°08'27"E N12°58'00"E

.3 0'

20.35'

213.16'

12.30' 63.94'

D 45°50'12"

T 42.07'

L 81.16'

R 125.00'

DELTA 37°12'11"

1+20.37PI

CURVE #4

D 114°35'30"

T 17.21'

L 33.15'

R 50.00'

DELTA 37°59'33"

1+97.03PI

CURVE #5

D 81°51'04"

T 45.30'

L 80.41'

R 70.00'

DELTA 65°49'03"

4+71.44PI

CURVE #6

D 85°30'58"

T 22.53'

L 43.47'

R 67.00'

DELTA 37°10'27"

5+41.38PI

CURVE #7

E 907716.64

N 651305.25

0+00.00Begin Sta.

E 907713.32

N 651893.55

6+26.25End Sta.

E 907692.97

N 651379.89

0+78.30PC

E 907701.21

N 651478.79

1+79.82PC

E 907644.65

N 651714.32

4+26.14PC

E .6

N .8

.8

E 907694.38

N 651459.62

1+59.47PT

E 907702.25

N 651509.08

2+12.97PT

E .1

N .9

.5

P T

E 907698.97

N 651831.24

5+62.32PT

03.05

-5

C P -5

INTERS

TATE 9

5TO

MBR

SOLID

WHITEE. B

IT

MBR

MBR

MBR

SO

LID

YELL

OW

SO

LID

YELL

OW

SO

LID

WHIT

E

BCLC

N A

V D

C O

N C

R E T E L

IG

H T P

O L E B

A S E

C H

IS

E L E

D S

Q U

A R

E

IN

S

W C

O R

E L .4

A

E. BIT

MBR

SOLID WHITE

SOLID YELLOW

MBR

MBR

SOLID YELLOW

SOLID WHITE

BCLC

MBR

E. BIT

MBRSOLID WHITE

SOLID YELLOWMBR

MBRSOLID YELLOW

SOLID WHITE

BCLC

MBR

N A

V D

M A

G N

A

IL

IN

L

E D

G E O

U T C

R O

P E L .6

DRIVE

GRAVEL

D R

IV

E G

R A

V E L

D -3

R A

N

D -3

R A

N

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

F L .3

F L .6

F L .6

F L .5

F L .7

F L .1

B T .0

F L .3

(W

F L .3

(E

F L .5

(N

T F .5

"C

"C B

B T .6

F L .2

(S

W

F L .1

(E

T F .7

S T O

R M M

H

B T .0

F L .2

)W

F L .3

(E

T F .0

S T O

R M M

H

S T R

U C

T U

R E x

A

C C

E S S T

U N

N E L

F L .3

T F .7

S

A N M

H

F L .0

(S

W

F L .2

(N

, S

T F .8

S

A N M

H

F L .9

T F .9

S

A N M

H

F L .8

T F .8

S

A N M

H

B T .8

F L .9

T F .5

"C

"C B

B T .0

F L .1

T F .0

"C

" C B

B T .9

F L .9

T F .1

"C

" C B

F L .9

(F U

L L O

F M

U D

.5

B

T

F L .0

T F .3

"C

"C B

DRIVE

GRAVEL

B T .4

F L .3

(W

T F .1

"C

-L "C

B

F L .6

.3

' F

R O

M O

U T L E T

IN

C

U L V

E R

T V

E R

T

IC

A L K

IN

K

E. BIT

B T .9

F L .2

T F .4

D

B L "C

"C B

B T .3

F L .0

T F .3

"C

"C B

B T .4

F L .1

T F .4

"C

"C B

B T .7

F L .7

(S

W

F L .8

(N

E

T F .2

"C

"C B

M

BR

BCLC

E. BIT

BCLC

E. BIT

B T .2

F L .0

(S

W

F L .2

(N

E

T F .4

"C

"C B

M

BR

M

BR

E. BIT

E. BIT

E. BIT

BC

LC

SO

LID W

HITE

SO

LID W

HITE

M

BR

SO

LID YELLO

W

SO

LID YELLO

W

APPROXIM

ATE PROPERTY LINE

W

H E E L E R S F

A R

M S R

O A

D , L

P

N F

M E R

R

IT

T C

O R P

O R

A T E W

O O

D S

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

R A

IL

R O

A D C

O M

P A

N Y

C O

M M

U T E R

M E T R

O -N

O R

T H

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

24" GAS

APPROX. LOC.

24" GAS

APPROX. LOC.

+0

+0

+0

18+

19+00

20+00 21+00

22+00

23+00

24+00

25+00

26+00

27+00

28+00

81+00

+0

50'

60'

0+

1+

2+0

3+

4+

5+00

6+00

/2

COORDIN

ATE G

RID

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-06

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Plan_ATW1.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

HIGHWAY PLAN

TRANSPORTATION

LEGEND

NOTES:

M

ILFO

RD PA

RKW

A

Y EXTEN

SIO

N

MILFO

RD PARKWAY EXTENSION

UNNAMED BROOK

BOTTOM = 40.00

INV. AT WALL 30" CCMP = 42.07

INV. OUT W (PROP 30" CCMP) = 42.21

INV. IN (PROP 24" CCMP) = 47.40

INV. IN (EXIST 12" CCMP) = 48.7 +/-

TF=51.00

STA. 80+94.55, LT 10.5'

PROPOSED 6' MH

S = 17.3%90 LF 24" CMP,

7 LF 30" CMP, S = 2.00%

GRADE TO MATCH EXISITING.

PORTION OF GRAVEL ACCESS TO REMAIN.

REMOVE 85.3' x 24" EXISTING CMP

REMOVE 16.0' x 12" EXISTING CMP

E 907565.076'

N 651279.081'

STA.16+00.00

0083-0270BEGIN PROJECT NO.

65" O.D. 63.11" I.D.

196 LF GPR PIPE LINER

MODIFIED RIPRAP

10-YR VMax = 3.34fps

10-YR QMax = 5.79cfs

PROPOSED 6' MANHOLE

DRAINAGE ANALYSIS:

CLEAN EXISTING CULVERT

CLEAN EXISTING DRAINAGE STRUCTURE

CLEAN EXISTING CULVERT

CLEAN EXISTING DRAINAGE STRUCTURE

(TYP.)

OBJECT MARKER

(TYP.)

OBJECT MARKERS

E 907667.066'

N 651955.638'

STA. 23+00.00

END PROJECT NO. 0083-0270

GROUND BACK TO EXISTING CONDITIONS

REMOVE WEST ACCESS ROAD AND RESTORE

RESTORE TO EXISTING CONDITION

REMOVE LAYDOWN AREA AND

UPON COMPLETION OF PROJECT (TYP.)

REMOVE WATER BARS

UPON COMPLETION OF PROJECT

REMOVE HIGH VISIBILITY SAFETY FENCE

INV. OUT (PROP 24" CMP) = 62.29

CLEAN EXISTING DRAINAGE STRUCTURE

EXISTING HIGH PRESSURE GAS LINE

EASEMENT LINE

PERMANENT

EASEMENT LINE

PERMANENT

(FOR CONSTRUCTION MATERIALS)

TEMPORARY EASEMENT

1" = 40'

HORIZONTAL SCALE

40' 80'

SEDIMENTATION AND EROSION CONTROL NOTES

BARRIER (OR EQUIVALENT)

DIRECT THE CONTRACTOR TO INSTALL AND MAINTAIN ADDITIONAL ROWS OF EROSION CONTROL

FLOW CONDITIONS TO MAINTAIN SHEET FLOW. IF DETERMINED NECESSARY, THE ENGINEER WILL

LIMITED TO: THE CONTRIBUTING DISTURBED AREA, DRAINAGE AREA, SLOPE, LENGTH OF SLOPE, AND

WITHIN THE PROJECT AREA. FACTORS TO BE REVIEWED BY THE ENGINEER INCLUDE BUT ARE NOT

3. ADDITIONAL EROSION CONTROL BARRIERS (DOUBLE ROW OF SCS) MAY ALSO BE REQUIRED

DOUBLE ROW (I.E., WOULD RESULT IN LARGER WETLAND/WATERCOURSE IMPACT).

BE AN ADVERSE IMPACT TO ADJACENT WETLANDS/WATERCOURSES DUE TO INSTALLATION OF A

AREA AND DOWNGRADIENT WETLAND OR WATERCOURSE WITHIN 50 FEET, UNLESS THERE WOULD

2. A DOUBLE ROW OF SEDIMENT CONTROL BARRIER SHALL BE UTILIZED BETWEEN ANY DISTURBED

DIRECTED BY THE ENGINEER.

1. SEDIMENTATION CONTROL SYSTEM TO BE PLACED AT CATCH BASIN(S) AS NEEDED OR AS

STATE/FEDERAL INLAND WETLAND LIMITS

ORDINARY HIGH WATER

SURVEYED EDGE OF WATER

SEDIMENTATION CONTROL SYSTEM

STATE-ONLY WETLANDS

(MODIFIED RIP RAP)

STONE FOR SLOPE PROTECTION

3. SEE TYPICAL SECTIONS FOR ACCESS ROAD MATERIAL COMPOSITION AND DETAILS.

AND WORK AREA ADJACENT TO THE CULVERT INLET SHALL BE REMOVED UPON COMPLETION.

2. EAST ACCESS ROAD IS PERMENANT AND SHALL REMAIN AFTER CONSTRUCTION. LAYDOWN

1. WEST ACCESS ROAD IS TEMPORARY AND IS TO BE REMOVED UPON PROJECT COMPLETION.

03.06

(TO REMAIN)

OF EXISTING 72" CMP

APPROXIMATE LOCATION

LINER PIPE

PROPOSED HDPE

.0

E L

.0

P

V T

S T

A

.6

E L

.0

P

V C

S T

A

.2

E L

.5

L

.P S

T A

-5.20%

S=

.4

E L

.0

P

V I

S T

A

17+00

17+00

18+00

18+00

19+00

19+00

20+00

20+00

21+00

21+00

22+00

22+00

23+00

23+00

24+00

24+00

25+00

25+00

26+00

26+00

27+00

27+00

50 50

60 60

70 70

80 80

90 90

100 100

110 110

606.724'SSD =

170.467'K =

750.000'L =

491.365'SSD =

113.846'K =

1200.000'L =

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-07

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Profiles.dgn FILE NAME: 9694 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

DESIGNER/DRAFTER: PRP CHECKED BY: JP

PROFILE

MILFORD PARKWAY

TRANSPORTATION

MILFORD PARKWAY B

EXISTING GROUND ALONG

L

MILFORD PARKWAY

HORIZONTAL SCALE IN FEET

40 80

VERTICAL SCALE IN FEET

4 8

03.07

-5

C P -5

INTERS

TATE 9

5TO

MBR

SOLID

WHITEE. B

IT

MBR

MBR

MBR

SO

LID

YELL

OW

SO

LID

YELL

OW

SO

LID

WHIT

E

N A

V D

C O

N C

R E T E L

IG

H T P

O L E B

A S E

C H

IS

E L E

D S

Q U

A R

E

IN

S

W C

O R

E L .4

A

E. BIT

MBR

SOLID WHITE

SOLID YELLOW

MBR

MBR

SOLID YELLOW

SOLID WHITE

MBR

E. BIT

MBRSOLID WHITE

SOLID YELLOWMBR

MBRSOLID YELLOW

SOLID WHITE

MBR

N A

V D

M A

G N

A

IL

IN

L

E D

G E O

U T C

R O

P E L .6

D R

IV

E G

R A

V E L

D -3

R A

N

D -3

R A

N

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

(N F

C H

D

S T R

U C

T U

R E x

A

C C

E S S T

U N

N E L

DRIVE

GRAVEL

E. BIT

M

BR

E. BIT

E. BIT

M

BR

M

BR

E. BIT

E. BIT

E. BIT

BC

LC

SO

LID W

HITE

SO

LID W

HITE

M

BR

SO

LID YELLO

W

SO

LID YELLO

W

APPROXIM

ATE PROPERTY LINE

W

H E E L E R S F

A R

M S R

O A

D , L

P

N F

M E R

R

IT

T C

O R P

O R

A T E W

O O

D S

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

R A

IL

R O

A D C

O M

P A

N Y

C O

M M

U T E R

M E T R

O -N

O R

T H

N F

S T A

T E O

F C

O N

N E C

T

IC

U T

N F

24" GAS

APPROX. LOC.

24" GAS

APPROX. LOC.

+0

+0

+0

18+

19+00

20+00 21+00

22+00

23+00

24+00

25+00

26+00

27+00

28+00

81+00

+0

0+

1+

2+0

3+

4+

5+00

6+00

/2

COORDIN

ATE G

RID

5/30/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-08

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Plan_ATW1.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

ACCESS ROAD PLAN

TRANSPORTATION

LEGENDHOUSATONIC RIVER

STATE WETLAND (TYP.)

LIMITS (TYP.)

STATE WETLAND

APPROXIMATE SLOPE LIMITS

APPROXIMATE SLOPE LIMITS

LWEST ACCESS ROAD B

LMILLFORD CONNECTOR RAMP B

LEAST ACCESS ROAD B

SEDIMENTATION CONTROL SYSTEM

(SEE STRUCTURE PLAN)

24" TEMPORARY DRAINAGE SYSTEM

(SEE STRUCTURE PLANS FOR LIMITS)

TEMPORARY EARTH RETAINING SYSTEM (TERS)

SEDIMENTATION CONTROL SYSTEM

SYSTEM AT CATCH BASIN

SEDIMENT CONTROL

TEMPORARY WEST ACCESS ROAD (SITE NO. 2)

TEMPORARY EARTH RETAINING SYSTEM (TERS)

WETLAND (TYP.)

FEDERAL

PROTECT EXISTING UTILITY

SAFETY FENCE

INSTALL HIGH VISIBILITY

INSTALL WATER BAR (TYP.)

REMOVED UPON PROJECT COMPLETION

TEMPORARY LAYDOWN AREA TO BE

EXISTING HIGH PRESSURE GAS LINE

MILFO

RD PARKWAY EXTENSION

UNNAMED BROOK

PERMANENT EAST ACCESS ROAD (SITE NO. 1)

COMPLETION OF PROJECT)

(REMOVE UPON

ANTI-TRACKING PAD

PERMANENT EASEMENT LINE

PERMANENT EASEMENT LINE

'-0

(FOR CONSTRUCTION MATERIALS)

TEMPORARY EASEMENT

1" = 40'

HORIZONTAL SCALE

40' 80'

ANTI-TRACKING PAD

STATE/FEDERAL INLAND WETLAND LIMITS

ORDINARY HIGH WATER

SURVEYED EDGE OF WATER

SEDIMENTATION CONTROL SYSTEM

STATE-ONLY WETLANDS

(MODIFIED RIP RAP)

STONE FOR SLOPE PROTECTION

03.08

80+00

80+00

81+00

81+00

20 20

30 30

40 40

50 50

60 60

70 70

80 80

-2 .0

S

-8.21%

S=

-5.00%

S=

.5

E L

.0

P

V I

S T

A

.8

E L

.0

P

V I

S T

A

.8

E L

.0

P

V I

S T

A

.8

E L

.0

P

V I

S T

A

43.95'EL.

80+92.00PVI STA.

(TO REMAIN)

OF EXISTING 72" CMP

APPROXIMATE LOCATION

LINER PIPE

PROPOSED HDPE

�WEST TEMPORARY ACCESS RD

PROPOSED GRADE ALONG

.4

E L

.8

P V

T S

T A

.8

E L

.0

P V

C S

T A

78.97'EL.

3+71.19L.P. STA.

75.32'EL.

5+57.52L.P. STA.

-6.30%

S=

+4.

16%

S=

+7 .2 1%

S=

.0

S

78.04'EL.

6+00.00PVI STA.

82.38'EL.

4+64.00PVI STA.

78.39'EL.

3+68.00PVI STA.

74.94'EL.

5+57.00PVI STA.

0+00

0+00

1+00

1+00

2+00

2+00

3+00

3+00

4+00

4+00

5+00

5+00

6+00

6+00

50 50

60 60

70 70

80 80

90 90

100 100

110 110

187.331'SSD =

4.790'K =

30.000'L =

113.758'SSD =

4.111'K =

50.000'L =

141.429'SSD =

8.475'K =

30.000'L =

154.603'SSD =

13.764'K = 50.000'L =

56.006'SSD =

5.192'K =

49.592'L =

26.170'SSD =

1.315'K =

20.000'L =

.2

E L

.0

P V

T S

T A

.3

E L

.0

P

V T

S T

A

.0

E L

.0

P V

C S

T A

.3

E L

.0

P V

C S

T A

.0

E L

.0

P

V T

S T

A

.2

E L

.0

P V

T S

T A

.6

E L

.0

P

V T

S T

A

.4

E L

.0

P

V C

S T

A

.7

E L

.2

P

V C

S T

A

.7

E L

.0

P V

C S

T A

.7

E L

.1

H .P

S

T A

-9.02%

S=

-5.39%

S=

-8.00%

S=

.3

E L

.0

P

V I S

T A

79.43'EL.

6+05.55PVI STA.

.6

E L

.0

P

V I S

T A

.4

E L

.0

P

V I S

T A

.6

E L

.0

P V

I S

T A

(TO REMAIN)

OF EXISTING 72" CMP

(STA. 3+83.36, 39.69' LT)

APPROXIMATE LOCATION

LINER PIPE

PROPOSED HDPE

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

HWY-09

MILFORDPARKWAY EXTENSION) OVER UNNAMED BROOK

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_Profiles_ATW1.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

DESIGNER/DRAFTER: CHECKED BY:

SPROFILEACCESS ROAD

TRANSPORTATION

ACCESS ROAD SITE NO. 2 PROFILEACCESS ROAD SITE NO. 1 PROFILE

EXISTING GROUND

West Access Rd

EAST ACCESS ROAD

HORIZONTAL SCALE IN FEET

40 80

VERTICAL SCALE IN FEET

4 8

03.09

STA. 0+00.00

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

80 80

90 90

100 100

STA. 0+50.00

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

80 80

90 90

100 100

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-01

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

-2.0% 2.0% 3:1

E L

.8

E

R

E

HORIZONTAL SCALE

03.10

STA. 1+00.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

80 80

90 90

100 100

8" SAN.

8" SAN.

8" SAN.

-2.0% 2.0%

E L

.0

E

STA. 1+50.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

8" SAN.

8" SAN.

8" SAN.

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-02

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

-2.0% 2.0% 3:1

E L

.5

E

HORIZONTAL SCALE

03.11

STA. 2+00.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

8" SAN.

4:1 2:1

-2.0% 2.0%

E L

.4

E

STA. 2+50.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

8" SAN.

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-03

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

L

.7

E

HORIZONTAL SCALE

03.12

STA. 3+00.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

8" SAN.

3:1

-2.0% 2.0%

E L

.0

E

STA. 3+50.00

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

60 60

70 70

80 80

90 90

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-05

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

E L

.4

E

RETAINING SYSTEM (TERS)

TEMPORARY EARTH

8" SAN.

1" = 5'

HORIZONTAL SCALE

03.13

STA. 3+62.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

60 60

70 70

80 80

90 90

RETAINING SYSTEM (TERS)

TEMPORARY EARTH

8" SAN.

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-04

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

3:1

E L

.0

E

HORIZONTAL SCALE

03.14

STA. 4+00.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

8" SAN.

(MILFORD PARKWAY EXTENSION)

EDGE OF ROAD ROUTE 796

3:1

-1.0% 1.0%

E L

.7

E

STA. 4+50.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

(MILFORD PARKWAY EXTENSION)

EDGE OF ROAD ROUTE 796

8" SAN.

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-06

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

2.0% -2.0%

L

.6

E

1" = 5'

HORIZONTAL SCALE

03.15

STA. 5+00.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

8" SAN.

(MILFORD PARKWAY EXTENSION)

EDGE OF ROAD ROUTE 796

1.0% -1.0% E

L

.5

E

STA. 5+50.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

(MILFORD PARKWAY EXTENSION)

EDGE OF ROAD ROUTE 796

8" SAN.

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-07

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

1.0% -1.0%

2:

1E

L

.5

E

HORIZONTAL SCALE

03.16

STA. 5+68.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

100 100

(MILFORD PARKWAY EXTENSION)

EDGE OF ROAD ROUTE 796

STRUCTURE #06179

ACCESS TUNNEL

8" SAN.

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-08

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

-10.0%

2.0%

2:

E L

.7

E

2.0%-

HORIZONTAL SCALE

03.17

STA. 6+00.00

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

100 100

8" SAN.

(MILFORD PARKWAY EXTENSION)

EDGE OF ROAD ROUTE 796

-2.0% 2.0%

2:

E L

.0

E

8" SAN.

(MILFORD PARKWAY EXTENSION)

EDGE OF ROAD ROUTE 796

STA. 6+26.25

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

70 70

80 80

90 90

100 100

RKT JPP

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-09

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_East Access Rd_ATW12.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO.1 CROSS SECTIONS

EAST ACCESS ROAD SITE

TRANSPORTATION

HORIZONTAL SCALE

03.18

STA. 80+00.00

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

EX. 24" CMP

2.5%

E L

.5

E

2.5%

STA. 80+25.00

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

EX. 24" CMP

24" CCMP

EX. 24" GAS (ASSUMED DEPTH)

1.9% -1.6%

E L

.6

E

PARKWAY EXTENSION)

ROUTE 796 (MILFORD

EDGE OF ROAD

STA. 80+50.00

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

EX. 24" CMP

24" CCMP

EX. 24" GAS (ASSUMED DEPTH)

2.0% -2.0%

E L

.3

STA. 80+75.00

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

EX. 24" CCMP

24" CMP

EX. 24" GAS (ASSUMED DEPTH)

2.0% -2.0%

E L

.9

STA. 80+91.00

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

24" CCMP

EX. 24" GAS (ASSUMED DEPTH)

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-10

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_West Access Rd.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO. 2 CROSS SECTIONS

WEST ACCESS ROAD SITE

TRANSPORTATION

2.0% -2.0%

L

.9

1" = 10'

HORIZONTAL SCALE

10' 20'

RETAINING SYSTEM

TEMPORARY EARTH

TEMPORARY EARTH RETAINING SYSTEM

03.19

72" CMP

65" GRP PIPE LINE (O.D.)

EX. 24" GAS (ASSUMED DEPTH)

12" CMP

-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

30 30

40 40

50 50

60 60

70 70

80 80

90 90

-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140

STA. 81+00.00

STA. 80+94.55, LT 10.5'

PROPOSED 6" MH

HEADWALL

PROPOSED

24" CCMP

30" CCMP

PARKWAY EXTENSION)

ROUTE 796 (MILFORD

EDGE OF ROAD

EX. 24" GAS (ASSUMED DEPTH)

STA. 81+25.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

40 40

50 50

60 60

70 70

80 80

90 90

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/29/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-11

REHABILITATION OF BRIDGE NO. 06770 SR 796 (MILFORD

PLOTTED DATE:

V:\Projects\ANY\K6\075442.000\16_Custom_Client\CT Connect\Highways\Contract_Plans\HW_CB_0083-0270_XS_West Access Rd.dgn FILE NAME: 3724 LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

NO. 2 CROSS SECTIONS

WEST ACCESS ROAD SITE

TRANSPORTATION

PARKWAY EXTENSION)

ROUTE 796 (MILFORD

EDGE OF ROAD

1" = 10'

HORIZONTAL SCALE

10' 20'

03.20

HW_CB_0083_0270_HWY_01_INDEX
HW_CB_0083-0270_Plan_ATW1
HW_CB_0083-0270_Typical_ATW1
HW_CB_0083-0270_Typical_ATW1
HW_CB_0083-0270_Plan_ATW1
HW_CB_0083-0270_Plan_ATW1
HW_CB_0083-0270_Profiles
HW_CB_0083-0270_Plan_ATW1
HW_CB_0083-0270_Profiles_ATW1
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_East Access Rd_ATW12
HW_CB_0083-0270_XS_West Access Rd
HW_CB_0083-0270_XS_West Access Rd
2026-06-01T14:49:56-0400
Robert J Faulkner -- Clough Harbour & Associates LLP
I am approving this document

File details come from the government source that posted it. Updated .