Summary of Electrical Installation Design Documentation
This document is a comprehensive set of electrical installation drawings and schedules for a power plant facility, specifically for the Glen Canyon Power Plant operated by the Bureau of Reclamation. The drawings provide detailed technical specifications for electrical systems including single-line diagrams, panel schedules, wiring diagrams, cable routing details, equipment specifications, and installation requirements.
The primary components covered include uninterruptible power supply (UPS) systems with bypass panels, battery charging and distribution systems, control panels, power distribution centers (PCA and PCB), transformer load centers, and associated electrical infrastructure. The documentation specifies power cable and conduit schedules with detailed conductor sizes, ampacity ratings, and routing information across multiple floors of the facility. Key electrical components include isolation transformers, magnetic synthesizers, DC breaker configurations, supervisory contact modules, and complex control and protection relay systems. The drawings reference IEEE standards for control and protection systems and include device designation symbols, wiring standards, and grounding requirements. Multiple revisions are indicated throughout the documents, with drawings dating from 2014 and updates through 2025, suggesting ongoing modifications to the electrical infrastructure. The documentation is marked "For Information Only" on numerous pages and includes manufacturer-specific information relevant to the installed equipment at the facility.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DONNA JOHNSON Digitally signed by DONNA JOHNSON Date: 2025.05.30 07:50:08 -06'00'
Date: 2025.05.30 07:51:19 -06'00'
Date: 2025.05.30 07:52:22 -06'00'
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
7- D
-6
-R
EV
1.
D W
G
LA
S T
S A V
ED
D A
TE
-0 6-
LA
S T
S A V
ED
B Y
EM
EN
D
LI
N
¦D_DT¦
¦STATUS¦
G
LE
N C
A N
YO
N
D A M
S
TA
TI
O
N S
ER
V
IC
E D
IV
IS
IO
N
S C A D
A U
N
IN
TE
R R U
PT
IB
LE
P
O W
ER
S U
PP
LY
R
EP
LA
C
EM
EN
T
C O
LO
R A D
O R
IV
ER
S
TO
R A G
E
PR
O
JE
C T
A R
IZ
O N
A
ELECTRICAL
INSTALLATION
POWER CABLE AND
CONDUIT SCHEDULE
DENVER, CO
557-D-60176
2025-04-18
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
KASEY NUNES
KASEY NUNES
DENNIS O'DONNELL
ERIC MENDLIN, P.E.
SUPERVISORY ELECTRICAL ENGINEER
DONNA JOHNSON, P.E.
ELECTRICAL ENGINEER
POWER CABLE AND CONDUIT SCHEDULE
CONDUIT
NUMBER
CONDUIT SIZE
-TYPE
ELBOW & VERTICAL
CONDUIT - TYPE AMPACITY CONDUCTORS ORIGIN DESTINATION NOTES
1 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G D2B F0A
2 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G D7B F0A
3 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G F0A UPS 1 BY PASS PANEL
4 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G F0A UPS 2 BY PASS PANEL
5 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G UPS 1 BYSPASS PANEL UPS 1 SUPPLY SIDE 6 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G UPS 1 BYSPASS PANEL UPS 1 LOAD SIDE
7 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G UPS 1 BYSPASS PANEL P1D1
8 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G UPS 2 BYPASS PANEL UPS 2 SUPPLY SIDE 9 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G UPS 2 BYPASS PANEL UPS 2 LOAD SIDE
10 2" - RMC RMC 200 3 1/C 3/0 + 1 1/C 3/0 + 1 #6_G UPS 2 BYPASS PANEL P1D2
11-NOT
USED
12 1-1/4" - RMC RMC 230 2-1/C 4/0 P1F F1A
13 1-1/4" - RMC RMC 230 2-1/C 4/0 P2F F2A
14 1-1/4" - RMC RMC 230 2-1/C 4/0 F1A UPS 1
15 1-1/4" - RMC RMC 230 2-1/C 4/0 F2A UPS 2
16 1-1/4" - RMC RMC 125 3 1/C 1/0 + 1 #6_G P1DPCA PCA
17 1-1/4" - RMC RMC 125 3 1/C 1/0 + 1 #6_G P1DPCB PCB
18 3/4" - RMC RMC 40 3 1/C #8 + 1 #10_G P1DKMD KMD
19 not used not used 250 3 1/C 250 + 1 1/C 250 + 1 #4_G KCA1 PCA2 MANUFACTURER'S INTERNAL WIRING 20 not used not used 250 3 1/C 250 + 1 1/C 250 + 1 #4_G KCB1 PCB2 MANUFACTURER'S INTERNAL WIRING
21 FIELD VERIFY FIELD VERIFY 4/C - 8 PCA CPU A RECONNECT EXISTING CONDUCTORS
22 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA DISC A0 RECONNECT EXISTING CONDUCTORS
23 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA DISC A1 RECONNECT EXISTING CONDUCTORS
24 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA COLOR CONSOLE A RECONNECT EXISTING CONDUCTORS 25 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA PROCESS INTERFACE AB RECONNECT EXISTING CONDUCTORS 26 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA REMOTE COMMS AB RECONNECT EXISTING CONDUCTORS 27 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA RTU INTERFACE AB RECONNECT EXISTING CONDUCTORS
28 FIELD VERIFY FIELD VERIFY 4/C - 8 PCA CPU C RECONNECT EXISTING CONDUCTORS
29 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA DISC C0 RECONNECT EXISTING CONDUCTORS
30 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA DISC C1 RECONNECT EXISTING CONDUCTORS
31 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA COLOR CONSOLE C RECONNECT EXISTING CONDUCTORS 32 FIELD VERIFY FIELD VERIFY 5/C - 6 PCA TELEPHONE ROOM RECONNECT EXISTING CONDUCTORS 33 FIELD VERIFY FIELD VERIFY 4/C - 8 PCA PERIPH CNTRL A RECONNECT EXISTING CONDUCTORS 34 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA VG BASE AB RECONNECT EXISTING CONDUCTORS
35 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA MTU A RECONNECT EXISTING CONDUCTORS
36 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA LOGGER A RECONNECT EXISTING CONDUCTORS
37 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA MAP/OPCOM A RECONNECT EXISTING CONDUCTORS 38 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA PERIPH SW A RECONNECT EXISTING CONDUCTORS 39 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA PERIPH SW B RECONNECT EXISTING CONDUCTORS 40 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA 9TH FLOOR TELECOM RM RCPT RECONNECT EXISTING CONDUCTORS 41 FIELD VERIFY FIELD VERIFY 4/C - 8 PCA PERIPH CNTRL C RECONNECT EXISTING CONDUCTORS 42 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA VG BASE C RECONNECT EXISTING CONDUCTORS
43 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA MTU C RECONNECT EXISTING CONDUCTORS
44 FIELD VERIFY FIELD VERIFY 3/C - 10 PCA VG BASE C RECONNECT EXISTING CONDUCTORS 45 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA MAP/OPCOM C RECONNECT EXISTING CONDUCTORS 46 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA 9TH FLOOR TELECOM RECONNECT EXISTING CONDUCTORS 47 FIELD VERIFY FIELD VERIFY FIELD VERIFY PCA ROOM 1009 RECONNECT EXISTING CONDUCTORS 48 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA CCN PANEL...(1843)...PLC-CS SEC. RECONNECT EXISTING CONDUCTORS 49 FIELD VERIFY FIELD VERIFY 3/C - 12 PCA FCA PANEL...(3769) RECONNECT EXISTING CONDUCTORS
50 FIELD VERIFY FIELD VERIFY 4/C - 8 PCB CPU B RECONNECT EXISTING CONDUCTORS
51 FIELD VERIFY FIELD VERIFY 3/C - 10 PCB DISC B0 RECONNECT EXISTING CONDUCTORS
52 FIELD VERIFY FIELD VERIFY 3/C - 10 PCB DISC B1 RECONNECT EXISTING CONDUCTORS
53 FIELD VERIFY FIELD VERIFY 3/C - 12 PCB COLOR CONSOLE B RECONNECT EXISTING CONDUCTORS 54 FIELD VERIFY FIELD VERIFY 3/C - 10 PCB PROCESS INTERFACE AB RECONNECT EXISTING CONDUCTORS 55 FIELD VERIFY FIELD VERIFY 3/C - 10 PCB REMOTE COMMS AB RECONNECT EXISTING CONDUCTORS 56 FIELD VERIFY FIELD VERIFY 3/C - 10 PCB RTU INTERFACE AB RECONNECT EXISTING CONDUCTORS 57 FIELD VERIFY FIELD VERIFY 3/C - 10 PCB NETWORK CNTRL/ANALOG PATCH AB RECONNECT EXISTING CONDUCTORS 58 FIELD VERIFY FIELD VERIFY 3/C - 12 PCB COLOR CONSOLE AB RECONNECT EXISTING CONDUCTORS 59 FIELD VERIFY FIELD VERIFY 3/C - 10 PCB CNTRL RM RCPT CKT1 RECONNECT EXISTING CONDUCTORS
REFERENCE DRAWINGS
ELECTRICAL - SINGLE LINE DIAGRAM 557-D-60172
ELECTRICAL - PANEL SCHEDULES 557-D-60176
NOTES
1. EXISTING PANELS PCA AND PCB EXISTING CONDUCTOR SIZES
WERE TAKEN FROM FOR INFORMATION ONLY (FIO) DRAWINGS:
557-420-13692, 577-420-13691, 577-420-13693, 577-420-13659, 557-D-3660.
2. DESTINATIONS OF EXISTING PCA AND PCB CIRCUITS WERE TAKEN
FROM FOR INFORMATION ONLY (FIO) DRAWINGS:
557-420-13692, 577-420-13691, 577-420-13693, 577-420-13659, 557-D-3660.
R
EV
N O 1
-0 6-
D
ER
IC
T M
EN
D
LI
N
PE
R
EM
O V
ED
C O
N D
U
IT
A N
D R
EN
A M
ED
O
R
IG
IN
FO
R C
O N
D U
IT
S an d
Date: 2025.05.30 07:54:19 -06'00'
Re le as ed
LAR M TA IOCE N
Re le as ed
File details come from the government source that posted it. Updated .