Supervisory Control and Data Acquisition (SCADA) System Upgrades & Maintenance
- Kenton County Airport Board is requesting proposals for a Commercial Vehicle Management Software System under RFP #26-041-RFP, with proposals due July 2, 2026 at 2:00 p.m. and questions due June 22, 2026 at 11:59 p.m. The scope encompasses design, implementation, operation, maintenance, and upgrade of a complete CVMS system. The contractor must supply all hardware, equipment, wiring, cabling, connectivity, interfaces, software, services, labor, materials, tools, training, manuals, drawings,...
- The Kenton County Airport Board is soliciting proposals for interior landscaping and seasonal decoration services at Cincinnati/Northern Kentucky International Airport under RFP 26-029-RFP, with proposals due June 11, 2026 at 2:00 p.m. Eastern Time. A non-mandatory pre-proposal meeting and site visit are scheduled for May 21, 2026 at 10:00 a.m. at CVG Center. Kentucky resident bidder preference applies. The scope encompasses design, installation, weekly maintenance, and seasonal removal of...
- The Kenton County Airport Board is requesting bids for Terminal Drive Bridge Rehabilitation at Cincinnati/Northern Kentucky International Airport, with proposals due July 2, 2026 at 2:00 p.m. ET, a mandatory pre-bid meeting and site visit on June 10, 2026 at 10:00 a.m., and questions due June 18, 2026 at 11:59 p.m. The project is financed by local funds and encompasses bridge deck and approach slab latex-modified concrete overlays; raised crosswalk epoxy-urethane overlay; concrete patching and...
- The Kenton County Airport Board is soliciting proposals for a drone detection system at Cincinnati/Northern Kentucky International Airport (CVG) in Hebron, Kentucky, under RFP #26-033-RFP, with proposals due July 2, 2026 by 2:00 PM Eastern Time. All detection equipment must be manufactured in America. The system must deliver detection, tracking, and identification of drones of various sizes under multiple weather conditions, with real-time monitoring, continuous multi-drone tracking, and...
- The Kenton County Airport Board is requesting bids for Taxiway M Reconstruction at Cincinnati/Northern Kentucky International Airport, with bids due July 2, 2026 at 2:00 p.m. ET. A mandatory pre-bid meeting and site visit is scheduled for June 11, 2026 at 10:00 a.m. at CVG Centre, Admin. Offices, 77 Comair Blvd., Erlanger, Kentucky, with RSVP required by June 10. The project is subject to 49 CFR Part 26 DBE good-faith-efforts requirements — bidders must demonstrate good faith efforts to...
- The Kenton County Airport Board is soliciting proposals for Information Technology Equipment & Commodity Software with proposals due June 11, 2026 at 2:00 p.m. A Kentucky resident-bidder preference applies: Kentucky residents receive preference equal to the preference given by the non-resident bidder's home state, with Kentucky residents also receiving preference in tie situations. Qualifying resident bidders must be authorized to transact business in Kentucky and must have filed Kentucky...
- The Kenton County Airport Board is requesting proposals for on-call painting services at Cincinnati/Northern Kentucky International Airport (CVG) in Hebron, Kentucky under ITB #26-040, with proposals due July 2, 2026 at 2:00 p.m. Eastern Time and a Kentucky resident bidder preference applied in accordance with state law. The scope encompasses interior and exterior painting on garage stalls, storage tanks, office areas, public and private spaces, platforms, mezzanines, and light poles within...
- Kenton County Airport Board (KCAB) is requesting proposals for media buying services at Cincinnati/Northern Kentucky International Airport (CVG) under RFP #26-034-RFP, with proposals due June 18, 2026 at 2:00 p.m. ET. Proposers may bid on comprehensive radio and digital media buying (Option A), radio only (Option B), or digital only (Option C). Minimum qualifications include five years of agency experience managing media budgets exceeding $500,000 annually, demonstrable knowledge of the...
- The Commonwealth of Kentucky Department of Aviation is requesting bids for the construction of two medium-sized box hangars at Capital City Airport in Frankfort, under RFB-05-27 (RFB 785-2600000646), with bids due June 25, 2026 at 1:30 PM Eastern Time. This is a federally funded airport improvement project subject to Davis-Bacon Act prevailing wage requirements, Buy American provisions (49 USC 50101), and BABA (Build America, Buy American) mandates requiring U.S.-produced iron, steel, and...
- The Commonwealth of Kentucky Department of Aviation is requesting bids for the construction of two medium-sized box hangars at Capital City Airport in Frankfort under RFB-05-27, with bids due June 25, 2026 at 1:30 p.m. Eastern Time. This is a federal-aid project subject to Davis-Bacon Act prevailing wage requirements and Buy American compliance under 49 USC 50101. Each hangar measures 60 by 80 feet and includes a unisex restroom, electric service, and heating. The scope encompasses site...
The Kenton County Airport Board is requesting proposals for Supervisory Control and Data Acquisition (SCADA) System Upgrades & Maintenance at Cincinnati/Northern Kentucky International Airport, with proposals due July 2, 2026 at 2:00 p.m. and a mandatory pre-proposal meeting and site visit on June 2, 2026 at 10:00 a.m. at CVG Centre Admin. Offices, 77 Comair Blvd., Erlanger, Kentucky. This is a federally funded project subject to Davis-Bacon prevailing wage requirements and 49 CFR Part 26 Disadvantaged Business Enterprise (DBE) participation rules. The scope encompasses replacing the legacy Honeywell glycol conveyance control system with a Programmable Logic Controller (PLC) platform; integrating new control systems for the Spent Aircraft Deicing Fluid (SADF) conveyance system at the DHL ramp expansion; replacing the stormwater treatment plant SCADA software platform; and engineering new PLCs for the DHL ramp expansion. The system manages over 1,000 input/output points across 45 deice pads, glycol distribution systems, detention basins (Elijah Creek and Gunpowder Creek), stormwater treatment, and pump stations. Technical requirements include web-based HMI accessibility across multiple browsers and mobile devices, Azure AD/Entra ID SSO integration, 99.5% uptime availability, SOC-2 compliance, role-based access controls, open APIs, and data encryption. The contractor must implement Endpoint Detection and Response (EDR) software, critical vulnerability patching within 60 days (CVSS 9.0–10.0), high-severity patching within 120 days (CVSS 7.0–8.9), and multi-factor authentication via unique Active Directory accounts for remote VPN access. Quarterly security OS updates, quarterly SCADA application updates to latest minor versions, and annual major version upgrades are required, with quarterly reporting on all software and firmware versions. The contract term is five years with an option to renew for five additional one-year terms. The total appropriations request is $2,686,210, comprising design ($270,000), equipment ($2,100,000), system upgrades ($237,000), labor ($78,210), and miscellaneous costs ($1,000), with recurring yearly operations and maintenance costs of $15,000. Pricing must be submitted on a lump-sum basis for design, hardware, and software installation, plus annual software updates and license fees for years one through four; monthly invoices are paid net 30. Contractors must obtain employee badges at $44 per badge initially, with penalties for lost badges. Proposals must include a 5% proposal bond; selected contractors must provide 100% payment and performance bonds. Questions are due June 22, 2026 at 11:59 p.m., with answers posted by June 25, 2026. Anticipated board approval is July 27, 2026, with contract implementation beginning August 14, 2026. The contractor must maintain professional liability ($1,000,000 minimum), commercial general liability ($2,000,000–$10,000,000), workers' compensation, and automobile liability insurance with KCAB named as additional insured.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
26-035-RFP_HMI_Screenshots_06.18.26.pdf | 528KB | 6/18/26 | ||
CVG_IT_Standard_Equipment_List_for_Industrial_Networking_Deployments.pdf | 70KB | 5/11/26 | ||
26-035-RFP_Glycol_Control_Systems_Drawings.pdf | 23MB | 6/16/26 | ||
26-035-RFP_KPDES_Systems_Map_2025.07.pdf | 27MB | 6/10/26 | ||
Business_Case_-_SWTP_SCADA_Upgrades.pdf | 232KB | 5/11/26 |