About this file

This file contains technical drawings and plans for a Glycol Control Systems project submitted in response to a Supervisory Control and Data Acquisition (SCADA) System Upgrades & Maintenance request issued by the Kenton County Airport Board (KCAB) in Kentucky. The document comprises a comprehensive index and master set of architectural and engineering drawings organized alphabetically from sections A through T, with multiple plan sheets, detail sheets, and tabular information included throughout the documentation. The pre-proposal meeting and mandatory site visit were scheduled for Tuesday, June 2, 2026 at 10:00 am at CVG Centre Administrative Offices located at 77 Comair Boulevard in Erlanger, Kentucky. The submission deadline for proposals was Thursday, July 2, 2026 at 2:00 pm, with a question submission deadline of Monday, June 22, 2026 at 11:59 pm and answers posted by Thursday, June 25, 2026 at 11:59 pm.

The drawing set serves as supporting technical documentation for the SCADA system upgrade project, providing detailed specifications and spatial layouts necessary for bidders to understand the scope of work and submit informed proposals. No pricing information, contract terms, funding sources, or incumbent contractor details are contained within this technical drawing file, as it functions solely as a visual and schematic reference document to accompany the main request for proposals.

View the file

Other files for this state and local contract opportunity

Other files attached to Supervisory Control and Data Acquisition (SCADA) System Upgrades & Maintenance, newest first.
File Type Posted
Supervisory_Control_and_Data_Acquisition_(SCADA)_System_Upgrades_&_Maintenance_(Addendum_#5_Revision).pdf PDF
26-035-RFP_DHL_Expansion_058529_PKG5_-_Electrical_Plans.pdf PDF
26-035-RFP_DHL_Pkg_S5_SADF_&_SW_Conveyance_IFC_Plans_2025.10.13.pdf PDF
26-035-RFP_HMI_Screenshots_06.18.26.pdf PDF
26-035-RFP_Photos_-_HW_Panels.pdf PDF
26-035-RFP_SCADA_System_Architecture_Drawings.pdf PDF
26-035-RFP_VTSCADA_Tag_Count_&_Server_List.pdf PDF
26-035-RFP_KPDES_Systems_Map_2025.07.pdf PDF
26-035-RFP_SCADA_Upgrade_-_Ad.pdf PDF
Davis-Bacon_Wage_Determination_-_Heavy_01.02.2026_-_Attachment_G.pdf PDF
26-035-RFP_SCADA_Upgrade_-_Sample_Contract_-_Attachment_F.pdf PDF
Honeywell_Glycol_Points_Panel_-_Attachment_A.pdf PDF
CVG_IT_Standard_Equip_List_for_Industrial_Networking_Deployments_-_Attachment_B.pdf PDF
SCADA_Upgrade_Maintenance_Plan_-_Attachment_C.pdf PDF
Honeywell_Glycol_Points_Panel.xlsx XLSX spreadsheet
CVG_IT_Standard_Equipment_List_for_Industrial_Networking_Deployments.pdf PDF
SCADA_IT_System_Requirements_-_Attachment_x.xlsx XLSX spreadsheet
Business_Case_-_SWTP_SCADA_Upgrades.pdf PDF
SCADA_Upgrade_Maint_Plan.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1_Index

1_Master
1st
A
B
B
B Plan
B Plan (2)
C
C
C Plan
D
D
D Plan (2)
E
E
E Plan
F
F
F Plan
G
G
G (2)
G (3)
H
I
J
J
J Plan
K
K (2)
K Plan
L
L
L Plan
M
M
M Plan
N
N Plan
O
O Plan
P
P_tab1
P_tab2
P_tab3
Q
Q
Q Plans
R
R Plan
S
S Plan

T

File details come from the government source that posted it. Updated .