26-035-RFP_DHL_Expansion_058529_PKG5_-_Electrical_Plans.pdf
PDF 571 KB Posted
- Attached to
- Supervisory Control and Data Acquisition (SCADA) System Upgrades & Maintenance State and local contract opportunity
- Solicitation number
- 26-035-RFP
- Issued by
- Bell County, Kentucky
About this file
This document is an Electrical Plans drawing for a construction project involving the Kenton County Airport Board (KCAB) and the DHL CVG Hub facility expansion in Hebron, Kentucky. The electrical plans are part of Package 5, which encompasses SADF & Stormwater Base-Flow Conveyance work for the DHL Apron Expansion and Hangar Development project (Project No. 058529). The drawing package includes multiple sheets detailing electrical site plans, panel layouts, control riser diagrams, distribution one-line diagrams, schedules, notes, symbols, and abbreviations prepared by Chase Solutions (Indianapolis, IN). The electrical plans were issued for construction on October 13, 2025, with Project Addendum No. 01 dated June 19, 2026, indicating ongoing design modifications. The related SCADA System Upgrades & Maintenance proposal opportunity for KCAB includes a pre-proposal meeting and site visit scheduled for Tuesday, June 2, 2026 at 10:00 am at CVG Centre Admin. Offices, 77 Comair Blvd., Erlanger, KY 41018, with questions due by June 22, 2026 at 11:59 pm and proposal submissions required by July 2, 2026 at 2:00 pm.
No pricing terms, set asides, incumbent information, or specific funding amounts are detailed within the electrical plans document itself. The document functions as technical design documentation supporting the larger airport expansion project and associated systems upgrade opportunities. Additional contract details regarding compensation, funding sources, and specific service requirements would be contained in the separate SCADA System Upgrades & Maintenance RFP documentation.
View the file
Other files for this state and local contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL CONTROL RISER DIAGRAM
NOT TO SCALE DRAWING NO.
PR
O
JE
CT
CERTIFICATION:
SUB:
PRIMARY:
Checked By:
Issue Date:
Designed By: Drawn By:
Project No: Scale:
058529
# BY DESCRIPTION DATE
AS SHOWN
D H
L
CV
G
H U
B
H
EB
RO
N
KE
N
TU
CK
Y
B7
A
PR
O N
E
XP
A N
SI
O
N A
N D
H A
N G
A R
D
EV
EL
O
PM
EN
T
PA
CK
A
G E
S5
S A
D F
S
TO
RM
W A
TE
R
BA
SE
-F
LO
W C
O N
VE
YA
N
CE
OF 71
RLR/JPBJPB MJD
SH
EE
T:
M od if ie d
By
J un e
:1 7:
P
M
G ag no n, C am er on
Fi le
N am e:
V
Pr oj ec ts \A
N Y\
K6 \0
9.
0\
_D es ig n\
Dr aw in gs
\0 1_
Sh ee ts \P
KG
5\
DH
L-
-D
IA
G
-E
LE
C-
CT
RL
.d w g
EL
EC
TR
IC
AL
C O
N
TR
O L
RI
SE
R
DI
AG
RA
M
Drawing Copyright © 2024
317.786.0461 . www.chasolutions.com Indianapolis, IN 46204
201 N. Illinois Street, Suite 800
0 MJD ISSUED FOR CONSTRUCTION 10/13/25
10/13/25
EL
EC
TR
IC
AL
C
O
NT
RO
L
RI
SE
R
DI
AG
RA
M
S-SW-PS-2 CONTROL RISER DIAGRAM
NOT TO SCALE
1 JBF PROJECT ADDENDUM NO. 01 06/19/26
DRAWING NO.
PR
O
JE
CT
CERTIFICATION:
SUB:
PRIMARY:
Checked By:
Issue Date:
Designed By: Drawn By:
Project No: Scale:
058529
# BY DESCRIPTION DATE
AS SHOWN
D H
L
CV
G
H U
B
H
EB
RO
N
KE
N
TU
CK
Y
B7
A
PR
O N
E
XP
A N
SI
O
N A
N D
H A
N G
A R
D
EV
EL
O
PM
EN
T
PA
CK
A
G E
S5
S A
D F
S
TO
RM
W A
TE
R
BA
SE
-F
LO
W C
O N
VE
YA
N
CE
OF 71
RLR/JPBJPB MJD
SH
EE
T:
M od if ie d
By
J un e
:1 6:
P
M
G ag no n, C am er on
Fi le
N am e:
V
Pr oj ec ts \A
N Y\
K6 \0
9.
0\
_D es ig n\
Dr aw in gs
\0 1_
Sh ee ts \P
KG
5\
EL
EC
TR
IC
AL
S
CH
ED
U
LE
S
1.
dw g
EL
EC
TR
IC
AL
S
CH
ED
U
LE
S
Drawing Copyright © 2024
317.786.0461 . www.chasolutions.com Indianapolis, IN 46204
201 N. Illinois Street, Suite 800
0 MJD ISSUED FOR CONSTRUCTION 10/13/25
10/13/25
EL
EC
TR
IC
AL
S
CH
ED
U
LE
S
- 1
1 JBF PROJECT ADDENDUM NO. 01 06/19/26
| Sheets and Views |
| 52 ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS |
| 53 ELECTRICAL SITE PLAN - 1 |
| 54 ELECTRICAL SITE PLAN - 2 |
| 55 ELECTRICAL SITE PLAN - 3 |
| 56 ELECTRICAL SITE PLAN - 4 |
| 57 ELECTRICAL SITE PLAN - 5 |
| 58 ELECTRICAL PANEL LAYOUT DETAIL - 1 |
| 59 ELECTRICAL PANEL LAYOUT DETAIL - 2 |
| 60 ELECTRICAL S-SW-PS-2 EX. PANELS MODIFICATIONS DETAIL - 1 |
| 61 ELECTRICAL S-SW-PS-2 EX. PANELS MODIFICATIONS DETAIL - 2 |
| 62 ELECTRICAL DETAILS |
| 63 ELECTRICAL CONTROL RISER DIAGRAM |
| 64 ELECTRICAL DISTRIBUTION ONE-LINE DIAGRAM |
| 65 ELECTRICAL DISTRIBUTION ONE-LINE DIAGRAM SYMBOLS |
| 66 ELECTRICAL SCHEDULES - 1 |
| 67 ELECTRICAL SCHEDULES - 2 |
File details come from the government source that posted it. Updated .