SLCC South Retaining Wall Replacement
- Draper City is requesting bids on repair of two retaining walls along Traverse Ridge Road under an invitation for bid, with responses due July 30, 2026 at 2:00 p.m. and questions due July 28, 2026 at 5:00 p.m. through the Utah Public Procurement Place (U3P). A 5% bid bond is mandatory. The scope requires all labor, materials, tools, and equipment to repair two walls according to project plans and specifications, which are posted on U3P. Bid documents and specifications were available on or...
- The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids on tenant improvements to the 3rd floor of the World Trade Center in Salt Lake City under an invitational low-bid process, with bids due August 4, 2026 at 3:00 p.m. via the U3P website. This is a restricted solicitation limited to four invited contractors: Gladwell Construction, Northway Construction, RAD Electric, and Strong Solutions. A mandatory on-site meeting is scheduled for July 28, 2026 at...
- The State of Utah Division of Purchasing is requesting bids for reclamation construction at the Sowbelly Gulch Project in Carbon County, Utah, with bids due July 21, 2026 and a mandatory pre-bid meeting and site visit on July 15, 2026 at 10:00 a.m. at Spring Canyon Trailhead in Helper, Utah. Attendance at the entire pre-bid meeting is required for bid eligibility; failure to attend results in bid rejection. Work must commence upon notice to proceed and be completed within 14 calendar days...
- The Utah Division of Facilities and Construction Management is requesting bids for construction services on the Washburn Entrance Addition and Landscaping project at Snow College's Richfield campus, with bids due July 28, 2026. This is a Stage II Invitation to Bid; only three contractors short-listed during Stage I (Paulsen Construction, SIRQ Construction, and Westland Construction) are eligible to bid. The scope covers an entrance addition on the south side of the Washburn building and...
- The Utah Division of Facilities Construction and Management (DFCM) is requesting bids on west facade painting improvements at Bridgerland Technical College's Main Campus under an invitational procurement, with bids due August 11, 2026 and a mandatory site meeting on July 28, 2026 at 3:00 p.m. This is a restricted invitational — only four pre-qualified contractors are eligible: Accent Painting (Eric Castillo), Brush Brothers Painting (Blake Isaacson), Nicholls Brothers Painting (Brady Henderson),...
Salt Lake Community College is soliciting bids on a South Retaining Wall Replacement project at the Redwood Campus in Taylorsville, Utah, with bids due August 4, 2026, and a mandatory pre-bid site meeting and inspection on July 28, 2026. Contractors and subcontractors must comply with Utah State licensing laws and certify compliance with Utah Statute 63G-27-101 regarding the anti-boycott of Israel. The scope involves replacement of a failing retaining wall approximately 1,000 feet in length on the south side of Community Boulevard. The wall, measuring approximately 10 feet in length with maximum height of 3.5 to 4 feet, is leaning at multiple locations and has compromised structural integrity due to insufficient drainage and improper original installation. The project requires construction of a new retaining wall using larger concrete blocks (2 feet by 2 feet by 4 feet recommended), installation of a comprehensive drainage system, proper backfill materials to 95 percent standard proctor density, geogrid reinforcement, and subsurface soil evaluation. An adjacent 15-foot-on-center privacy and sound wall must be protected during construction and repaired as necessary. A qualified engineer must perform final design and analysis. The Keystone Retaining Wall Systems specification references Keystone Compac and Standard unit configurations with depths ranging from 12 to 21 inches. The construction cost estimate is $180,000. The project completion date is September 30, 2026, with a 60-day completion timeline and no liquidated damages specified. The contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically through Utah Public Procurement Place (U3P) by 3:00 p.m. on August 4, 2026. A bid bond equal to 5% of the bid amount, executed on AIA Document A310-2010 or equivalent, must accompany each bid. The successful bidder must furnish performance and payment bonds equal to 100% of the contract sum on AIA Document A312-2010. Questions are due July 30, 2026, with addenda posted by July 31, 2026. Contract award is anticipated August 5, 2026, with a pre-construction meeting scheduled for August 10, 2026. The apparent two low bidders must submit a list of all subcontractors with individual contracts exceeding $2,000 within 24 hours of request.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
7-SLCC-Taylorsville-Retaining Wall-Site Report.pdf | 16MB | 7/21/26 | ||
2-Certificate-of-Substantial-Completion (1).docx | 30KB | Document | 7/21/26 | |
1-SALT LAKE COMMUNITY COLLEGE GENERAL BID PROVISIONS.pdf | 39KB | 7/21/26 | ||
5-Invitation for Bid - SLCC Retaining Wall Replacement .docx | 53KB | Document | 7/21/26 | |
6-Community BLVD Retaining Wall Bid Request.docx | 163KB | Document | 7/21/26 |