5-Invitation for Bid - SLCC Retaining Wall Replacement .docx

DOCX document 53 KB Posted

Attached to
SLCC South Retaining Wall Replacement State and local contract opportunity
Solicitation number
SLCC2026-W1027
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This Invitation to Bid (IFB) is issued by Salt Lake Community College (SLCC) in Utah for the construction of a South Retaining Wall Replacement project located at the Redwood Campus, 4600 S. Redwood Road, Taylorsville, Utah 84123. The project scope requires replacement of the retaining wall per attached specifications with no additive alternates. A mandatory pre-bid site meeting and inspection is scheduled for 9:00 am on Tuesday, July 28, 2026, at the Southeast corner of parking lot C. Attendance at this meeting is required for all contractors wishing to submit bids. Electronic bids must be submitted through the Utah Public Procurement Place (U3P) website by 3:00 pm on Tuesday, August 4, 2026. The questions deadline is Thursday, July 30, 2026, at 3:00 pm, with addenda posted by Friday, July 31, 2026. Contract award is anticipated by Wednesday, August 5, 2026, with a pre-construction meeting scheduled for Monday, August 10, 2026. The project completion date is set for Wednesday, September 30, 2026, with a required 60-day completion timeline. No liquidated damages are specified.

The construction cost estimate is $180,000.00, with SLCC designated as tax-exempt. A bid bond equal to 5% of the bid amount, executed on AIA Document A310-2010 Bid Bond or equivalent, must accompany each bid submission and be uploaded through U3P; failure to provide the bid bond renders the bid nonresponsive. The successful bidder will be required to furnish performance and payment bonds equal to 100% of the contract sum on AIA Document A312-2010. The apparent two low bidders must submit a list of all subcontractors with individual contracts exceeding $2,000 within 24 hours of request. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest combination of base bid and acceptable alternates. All contractors and subcontractors must comply with Utah State licensing laws. By submitting a bid, contractors certify non-debarment status and compliance with Utah Statute 63G-27-101 regarding the anti-boycott of Israel.

View the file

Other files for this state and local contract opportunity

Other files attached to SLCC South Retaining Wall Replacement, newest first.
File Type Posted
3-Contractors-Agreement (1).docx DOCX document
7-SLCC-Taylorsville-Retaining Wall-Site Report.pdf PDF
1-SALT LAKE COMMUNITY COLLEGE GENERAL BID PROVISIONS.pdf PDF
2-Certificate-of-Substantial-Completion (1).docx DOCX document
4-Subcontractors+List (1).docx DOCX document
6-Community BLVD Retaining Wall Bid Request.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

Salt Lake Community College (SLCC) is requesting bids for the construction of the following project:

SLCC South Retaining Wall Replacement Community Blvd, Redwood Campus 4600 S. Redwood Rd, Taylorsville, UT 84123

SLCC2026-W1027

Construction Cost Estimate: $ 180,000.00

A MANDATORY pre-bid meeting and site visit will be held at 9:00 am on Tuesday, July 28, 2026, meet in the Southeast corner of parking lot C between the Technical Arts and the Construction Trades Buildings on the Redwood Campus – 4600 S. Redwood Rd. Taylorsville, UT 84123. All contractors wishing to bid on this project must attend this meeting.

Bids are to be submitted electronically until 3:00 pm on Tuesday, August 4, 2026 through a secure mailbox on the U3P website. It is the sole responsibility of the contractor to ensure their bid reaches U3P before the closing date and time. There is no cost to the contractor to submit electronic bids via U3P. Bids may require the uploading of attachments. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files.

A bid bond in the amount of five percent (5%) of the bid amount, made payable to Salt Lake Community College on the AIA Document A310 – 2010 Bid Bond, or equivalent, shall accompany the bid submission. If the bid bond is not uploaded with the bid through U3P, the bid is NONRESPONSIVE.

SLCC reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of SLCC.

PROJECT DESCRIPTION

Contact Information:

· Project Specific Questions: Refer to Project Schedule for deadline. All questions are to be submitted through the Utah Public Procurement Place (U3P).

Project Description: Replace Retaining Wall per attached specifications

Additive Alternates: None

SLCC Project Manager: Clark Goodrich

Design Firm: SLCC

Notes/Additional Information:

Construction Cost Estimate: $180,000

Completion Time: 60 days

Liquidated Damages: $none

Tax Exempt: Yes

BIDDING PROCESS

1. Drawings and Specifications and Interpretations If any firm is in doubt as to the meaning or interpretation of any part of the drawings, specifications, scope of work or contract documents, they shall submit a request for interpretation through the U3P website by the questions deadline. Neither SLCC nor the Designer shall be responsible for incorrect information obtained by contractors from sources other than the official drawings, specifications, and addenda issued by SLCC.

2. DFCM General Conditions The DFCM General Conditions (“General Conditions”) which are current as of the date of this Solicitation and all Supplemental General Conditions (“also referred to as General Conditions”) on file at the office of DFCM and available on the DFCM website (https://dfcm.utah.gov/construction-management/#documents), are included in the specifications for this Project.

3. Product Approvals Where reference is made to one or more proprietary products in the contract documents, but restrictive descriptive materials of one or more manufacturer(s) is referred to in the contract documents, the products of other manufacturers will be accepted, provided they equal or exceed the standards set forth in the drawings and specifications and are compatible with the intent and purpose of the design, subject to approval by SLCC. Such approval must be requested during the Q&A period. If the descriptive material is not restrictive, the products of other manufacturers specified will be accepted without prior approval provided they are compatible with the intent and purpose of the design as determined by SLCC.

4. Mandatory Pre-bid Site Meeting If a firm fails to attend a pre-bid site meeting labeled as “Mandatory”, they will not be allowed to bid on the project. At the mandatory meeting, contractors may have an opportunity to inspect the site, receive additional instructions and ask questions about the project. The schedule contains information on the date, time, and place of the mandatory pre-bid site meeting.

5. Addenda All clarifications from SLCC will be in writing and issued as an addendum to the IFB. Addenda will be posted on the U3P website. Contractors are responsible for obtaining information contained in each addendum from the website. Addenda issued prior to the submittal deadline shall become part of the bidding process. SLCC shall not be responsible for incorrect information obtained by contractors from sources other than official addenda issued by SLCC.

6. Qualifications The contractor’s and subcontractor’s past performance, organization, equipment, and ability to perform and complete their contracts in the manner and within the time limit specified will be elements, along with the cash amount of the bid, will be considered by the owner in the letting of the contract. The contractor shall comply with and require all subcontractors to comply with the license laws as required by the State of Utah.

7. Licensure The Contractor shall comply with and require all of its Subcontractors to comply with the license laws as required by the State of Utah.

8. Bid Submission Before submitting a bid, each bidder shall carefully examine the contract documents; shall visit the site of the work; shall fully inform themselves as to all existing conditions and limitations; and shall include in the bid the cost of all items required by the contract documents including those added via addenda. If the bidder observes that portions of the contract documents are at variance with applicable laws, building codes, rules, regulations or contain obvious erroneous or uncoordinated information, the bidder shall promptly notify SLCC. Changes necessary to correct these issues will be made via addenda issued by SLCC.

Bids are to be submitted electronically through a secure mailbox at U3P by the date and time listed on the posting. It is the sole responsibility of the Contractor to ensure their bid reaches U3P before the closing date and time. There is no cost to the Contractor to submit electronic bids via U3P. Electronic bids may require the uploading of electronic attachments. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files.

9. Bid Bond A bid bond properly signed by the contractor and a qualified surety, on the AIA Document A310 – 2010 Bid Bond, or equivalent, in the amount of 5% of the bid, shall accompany the bid submission and uploaded in U3P. If the bid bond is not furnished with the bid through U3P, the BID is NONRESPONSIVE.

A CASHIER’S CHECK CANNOT BE USED AS A SUBSTITUTE FOR A BID BOND.

10. Listing of Subcontractors The apparent two low bidders shall provide a list of subcontractors to SLCC within 24 hours (excluding Saturday, Sunday, or State holidays) of request. The list shall be submitted using the attached Subcontractors List and include all subcontracts with a dollar value in excess of $2,000.

SLCC retains the right to audit or take other steps necessary to confirm compliance with requirements for the listing and changing of subcontractors.

11. Contract and Bonds The attached Contractor's Agreement will form the contract between SLCC and the Contractor. The successful bidder, simultaneously with the execution of the Contract Agreement, will be required to furnish a performance bond and a payment bond on the AIA Document A312 - 2010 Performance and Payment Bond, or equivalent.

The performance and payment bonds shall be for an amount equal to one hundred percent (100%) of the contract sum and secured from a company that meets the requirements specified in the requisite forms. Any bonding requirements for subcontractors will be specified in the Supplementary General Conditions.

12. Award of Contract The Contract will be awarded as soon as possible to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and acceptable alternates, provided the bid is reasonable and in the best interest of SLCC.

SLCC reserves the right to waive any technicalities or formalities in any bid or in the bidding.

13. Right to Reject Bids SLCC reserves the right to reject any or all Bids.

14. Withdrawal of Bids Bids may be withdrawn on written request received from bidders within 24 hours after the bid opening if the Contractor has made an error in preparing the bid.

15. Debarment By submitting a bid, the Contractor certifies that neither it nor its principals, including project and site managers, have been, or are under consideration for, debarment or suspension, or any action that would exclude such from participation in a construction contract by any governmental department or agency. If the Contractor cannot certify this statement, attach to the bid a detailed written explanation which must be reviewed and approved by SLCC as part of the requirements for award of the Project.

16. Anti-Boycott Israel In accordance with Utah Statute 63G-27-101, Contractor certifies that it is not currently engaged in a boycott of the State of Israel and agrees not to engage in a boycott of the State of Israel for the duration of the contract.

PROJECT SCHEDULE

EVENT
DATE
TIME
BIDDING DOCUMENTS POSTED
Tuesday, July 21, 202610:00 am
MANDATORY PRE-BID SITE MEETING
Tuesday, July 28, 20269:00 am
QUESTIONS DEADLINE
Thursday, July 30, 20263:00 pm
ADDENDUM DEADLINE
Friday, July 31, 2026EOD
CONTRACTOR BID & BID BONDS DUE
Tuesday, August 4, 20263:00 pm
CONTRACT AWARD
Wednesday, August 5, 2026EOD
SUBCONTRACTORS LIST DUE
Wednesday, August 5, 2026EOD
PRE-CONSTRUCTION MEETING
Monday, August 10, 2026TBD
SUBSTANTIAL COMPLETION DATE
Wednesday, September 30, 2026TBD