Request for Proposal - Town of Madison - Neck River Flood Water Diversion

Closed State & local contract opportunity Posted

Solicitation number
37724
State
Connecticut
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from webprocure.proactiscloud.com. Updated .

About this opportunity

The Town of Madison is requesting proposals from qualified engineering firms to prepare engineering plans and specifications for rehabilitation of the Neck River Flood Water Diversion System and provide engineering oversight during construction, with proposals due August 12, 2026, and a mandatory pre-proposal site meeting on July 14, 2026.

The flood control facility comprises an earthen diversion dam, floodwater diversion channel, and associated dikes located across ten properties—nine residential lots and one Madison Land Conservation Trust property—where the Town holds maintenance easements. The selected consultant will deliver engineering design services, permitting assistance, and professional engineering oversight during rehabilitation construction. Supporting documentation includes two sets of as-built plans depicting existing conditions and easement areas and a 16-sheet plan set establishing baseline conditions and scope.

The contact for technical inquiries is John Iennaco, PE, CFM, Project Engineer and Floodplain Administrator, Town of Madison Department of Public Works and Engineering, at iennacoj@madisonct.org or (203) 245-5660.

Estimated contract value, contract term, pricing terms, payment terms, evaluation criteria, and incumbent information are not specified in the available solicitation documents. No set-asides or eligibility restrictions apply; all vendors are eligible to respond.

Opportunity text

The Town of Madison is seeking proposals from qualified engineering firms to prepare engineering plans and specifications for rehabilitation of the Neck River Flood Water Diversion System and to provide engineering oversight during construction activities. The facility includes an earthen diversion dam, floodwater diversion channel, and associated dikes. The facility is located across ten properties, consisting of nine residential lots and one Madison Land Conservation Trust property. The Town of Madison holds easements on these properties for maintenance of the flood control facility. The easement areas are depicted on "As-Built" plans included with this Request for Proposal (RFP). The selected consultant will provide engineering design services, permitting assistance, and professional engineering oversight associated with the rehabilitation work.

Files

File Type Posted
CT-443-P As Built 2 of 2.pdf PDF
Bid No. 27-02 - Geotechnical Report.pdf PDF
Parker Terrace - Drawings March 2026 - Sealed.pdf PDF
37724_Sep_17_26_solicitation_doc.pdf PDF
37724_Sep_24_26_solicitation_doc.pdf PDF
37724_Oct_15_26_solicitation_doc.pdf PDF
37724_Oct_27_26_solicitation_doc.pdf PDF
37724_Jun_30_26_solicitation_doc.pdf PDF
RFP.pdf PDF
PROSPECTIVE BIDDERS - 7.pdf PDF
Addendum 1.pdf PDF
37724_Aug_17_26_solicitation_doc.pdf PDF
37724_Sep_1_26_solicitation_doc.pdf PDF
37724_Sep_4_26_solicitation_doc.pdf PDF
37724_Oct_2_26_solicitation_doc.pdf PDF
37724_Oct_8_26_solicitation_doc.pdf PDF
37724_Aug_21_26_solicitation_doc.pdf PDF
37724_Aug_28_26_solicitation_doc.pdf PDF
37724_Sep_10_26_solicitation_doc.pdf PDF
37724_Sep_16_26_solicitation_doc.pdf PDF
37724_Oct_13_26_solicitation_doc.pdf PDF
37724_Oct_16_26_solicitation_doc.pdf PDF
37724_Oct_23_26_solicitation_doc.pdf PDF
CT-443-P As Built 1 of 2.pdf PDF
Plan Set sheets 1 through 16.pdf PDF
37724_Aug_10_26_solicitation_doc.pdf PDF
37724_Aug_19_26_solicitation_doc.pdf PDF
37724_Aug_27_26_solicitation_doc.pdf PDF
37724_Sep_11_26_solicitation_doc.pdf PDF
37724_Oct_7_26_solicitation_doc.pdf PDF
Show all 30

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors