CT-443-P As Built 1 of 2.pdf
PDF 915 KB Posted
- Solicitation number
- 37724
- Issued by
- New Haven County, Connecticut
About this file
This is an "As-Built" plan document for the Town of Madison, Connecticut, related to the Neck River Flood Water Diversion System rehabilitation project. The document provides technical drawings and specifications depicting the existing conditions of the flood control facility, which comprises an earthen diversion dam, floodwater diversion channel, and associated dikes located across ten properties (nine residential lots and one Madison Land Conservation Trust property). The Town of Madison holds maintenance easements on these properties. This plan document serves as a reference for the selected engineering consultant who will be responsible for preparing rehabilitation engineering plans and specifications, assisting with permitting, and providing professional engineering oversight during construction activities. The as-built plans are included as supporting documentation in the Request for Proposal issued to qualified engineering firms.
The as-built plan document itself does not contain pricing terms, contract award dates, or specific response deadlines, as it functions as a technical reference exhibit rather than a standalone bidding document. This plan is intended to inform prospective engineering consultants of the existing facility conditions and easement locations to enable accurate project scoping and design cost estimation. Prospective bidders should reference the primary RFP document for information regarding pricing requirements, evaluation criteria, submission deadlines, and contract terms for the engineering design, permitting, and construction oversight services.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .