About this file
This document comprises construction drawings for the Parker Terrace Pumping Station Upgrades project in Glastonbury, Connecticut, prepared by Weston & Sampson Engineers, Inc. for the Town of Glastonbury. The project involves comprehensive upgrades to the wastewater pumping station located at 30 Parker Terrace, Glastonbury, CT 06033, with drawings issued for construction in March 2026. The drawing set includes 40+ sheets covering civil, structural, mechanical, electrical, and instrumentation systems, encompassing site layout plans, demolition and erosion control details, grading and drainage plans, pump station mechanical systems, structural framing for wet well and canopy elements, electrical power distribution and control wiring schematics, and detailed instrumentation and network diagrams. Key mechanical components include three variable frequency drive (VFD) pumps, a 180-kilowatt natural gas generator, air source heat pump units, and an exhaust fan system. The project includes a backup level control system with multiple pressure and level transmitters, a programmable logic controller (PLC) with operator interface terminal, and a network infrastructure integrating industrial ethernet switching with fiber optic connectivity to the Town's corrosion control facility.
The drawings specify detailed construction requirements for site preparation, including erosion and sediment control measures, foundation and slab construction details, aluminum stair fabrication, and a protective canopy structure with framing plans. Electrical infrastructure includes a 400-ampere service from utility transformers with provisions for generator backup power, variable frequency drive installations for pump motor control, and comprehensive control wiring to multiple field instruments and sensors. Instrumentation systems feature submersible level transducers, float switches, flow meters, temperature sensors, and pressure transmitters integrated into the control system via an intrinsic safety barrier panel. The design incorporates redundant control strategies with automatic level control and manual override capabilities, coordinated lighting controlled by occupancy sensors and time clocks, and a wet well exhaust fan system activated by access hatch contact switches. The project scope includes mechanical details for pump discharge piping with isolation valves and pressure gauges, plumbing fixtures for maintenance operations, and provisions for future expandability with spare conduits and cable trays identified throughout the facility.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
T
E
E
U
L
R
L
N
E
P
S
I
K
E
RD .
CA
N
IO
NE
RE
SS
W
AY
DOUGLAS
R I PLEY
CA
RT
ER
LA
RD .
RD .
SYC
AM
ORE
WASHI NGTON ST .CL I NTON
LONDON
SCHOOL ST .
RANKI N RD .
ST
RE
ET
HEBRON
WELLES ST .
MELROSE ST.
MEDFORD ST.
CO
NC
O
RD
ST
HO
US
E
BROOK DR .
SALMON ST
GR
OV
E
ST
NAUBUC
TER
TER .
PARKER
EXT .
PA
RK
ER
MA
IN
Sa l mon
SPRI NG
GRISWOLD
W
RI
G
HT
S
LA
STREET
ST
PE
AR
L
BLVD .
GLASTONBURY
PRATT
POINT
RD.
NA
UB
UC
PUTNAM
BLVD .
AV
EN
UE
Keeney
Cove
BATES
LA .
W
W
IN
DW
OO
D
STREET
PR
OS
PE
CT
HA
RR
IS
SPRI NG
ST
NYE
HO
US
E
COOPER
DR
Glastonbury
C O N N E C T I C U T
SHORT
CIRCLE
K I NG
S BURY
L A N E
TERANS
OF
4.6
4.7
4.97
5.08
5.170
12.69
12.89
13.51
ST.
BANTLE
RD.
FULL CIR.
AVE.
E003 001 E003 003
E003 002
E003 002A
E003 004
E002 014
E002 014A
E0
E017 003A
NEW
13.45 E003 80113.53
12.96
13.03
13.27
ST.
NEW
LONDON
CONNECTICUT MUNICIPAL MAP
SCALE: N.T.S.
SITE LOCATION MAP
SCALE: 1" = 1000'
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
T100
COVER SHEET
TOWN OF GLASTONBURY, CONNECTICUT
PARKER TERRACE WASTEWATER
PUMPING STATION UPGRADES
30 PARKER TERRACE
GLASTONBURY, CT 06033
DRAWING INDEX
COVER SHEETT100
C001
TITLE
SHEET
NO.
C100
ABBREVIATIONS, NOTES AND LEGEND
EXISTING CONDITIONS PLAN
C300
C200
MECHANICAL DETAILS
PROCESS MECHANICAL PUMP STATION UPGRADE PLAN
PROCESS GENERAL NOTES AND SCHEDULES
EROSION & SEDIMENT CONTROL DETAILS
SITE AND CIVIL DETAILS
PROCESS MECHANICAL DEMOLITION SECTION
SITE AND CIVIL DETAILS
PROCESS MECHANICAL DEMOLITION PLAN
C900
C901
C903
C902
M100
M201
M202
M901
M301
TOWN OF GLASTONBURY DETAILS
A101 PUMPING STATION ELEVATION VIEW
C400
S001
S002
S100
S200
S300
S301
S003
STRUCTURAL GENERAL NOTES
STRUCTURAL TYPICAL DETAILS I
FOUNDATION PLAN AND DETAILS
STRUCTURAL TYPICAL DETAILS II
SLAB PLAN AND DETAILS
FRAMING PLAN AND DETAILS
FRAMING PLAN AND DETAILS II
DI001
DI501
INSTRUMENTATION LEGEND
INSTRUMENTATION DETAILS PART 1
SITE LAYOUT PLAN
DEMOLITION, EROSION AND SEDIMENTATION CONTROL PLAN
GRADING, DRAINAGE & UTILITY PLAN
E101
E102
P101
PUMP STATION ELECTRICAL PLAN
PUMP STATION CONTROL WIRING PLAN
PUMP STATION MECHANICAL PLAN
DI502 INSTRUMENTATION DETAILS PART 2
DI503 INSTRUMENTATION DETAILS PART 3
DI701 NETWORK DIAGRAM
C904 TOWN OF GLASTONBURY DETAILS
S201 ALUMINUM STAIR DETAILS
E201 ELECTRICAL SCHEDULES
EU1 ELECTRICAL SITE UTILITY PLAN
S302 WET WELL FRAMING PLAN AND DETAILS
Bid # 2027-09
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C001
ABBREVIATIONS,
NOTES, AND
LEGEND
Parker Terrace
N/F CPD Properties-2749
Main Street LLC Volume 2486, Page 261
N/F Solo Monk LLC, Ariel
Nathaniel Glastonbury LLC Et Al
Volume 3782, Page 543
N/F International Society For
Krishna Consciousness of
Connecticut, Inc.
Volume 3413, Page 171
N/F NJ Energy Realty, LLC
Volume 3653, Page 165
N/F Julia M. Krawiec, Judith A.
Krawiec, Karen K. Hancock
& Susan K. Mancini Volume 2608, Page 342
Subject Property Area: 15,663± SF
0.36± Acres
BENCHMARK
BENCHMARK
Parker Terrace
N/F CPD Properties-2749
Main Street LLC Volume 2486, Page 261
N/F Solo Monk LLC, Ariel
Nathaniel Glastonbury LLC Et Al
Volume 3782, Page 543
N/F International Society For
Krishna Consciousness of
Connecticut, Inc.
Volume 3413, Page 171
N/F NJ Energy Realty, LLC
Volume 3653, Page 165
N/F Julia M. Krawiec, Judith A.
Krawiec, Karen K. Hancock
& Susan K. Mancini Volume 2608, Page 342
Subject Property Area: 15,663± SF
0.36± Acres
BENCHMARK
BENCHMARK
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C100
EXISTING
CONDITIONS
PLAN
N
Parker Terrace
N/F CPD Properties-2749
Main Street LLC Volume 2486, Page 261
N/F Solo Monk LLC, Ariel
Nathaniel Glastonbury LLC Et Al
Volume 3782, Page 543
N/F International Society For
Krishna Consciousness of
Connecticut, Inc.
Volume 3413, Page 171
N/F NJ Energy Realty, LLC
Volume 3653, Page 165
N/F Julia M. Krawiec, Judith A.
Krawiec, Karen K. Hancock
& Susan K. Mancini Volume 2608, Page 342
BENCHMARK
BENCHMARK
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C200
DEMOLITION,
EROSION AND
SEDIMENTATION
CONTROL PLAN
N
Parker Terrace
N/F CPD Properties-2749
Main Street LLC Volume 2486, Page 261
N/F Solo Monk LLC, Ariel
Nathaniel Glastonbury LLC Et Al
Volume 3782, Page 543
N/F International Society For
Krishna Consciousness of
Connecticut, Inc.
Volume 3413, Page 171
N/F NJ Energy Realty, LLC
Volume 3653, Page 165
N/F Julia M. Krawiec, Judith A.
Krawiec, Karen K. Hancock
& Susan K. Mancini Volume 2608, Page 342
Subject Property Area: 15,663± SF
0.36± Acres
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C300
SITE LAYOUT
PLAN
N
AR
QA
AR
QA
Parker Terrace
N/F CPD Properties-2749
Main Street LLC Volume 2486, Page 261
N/F Solo Monk LLC, Ariel
Nathaniel Glastonbury LLC Et Al
Volume 3782, Page 543
N/F International Society For
Krishna Consciousness of
Connecticut, Inc.
Volume 3413, Page 171
N/F NJ Energy Realty, LLC
Volume 3653, Page 165
N/F Julia M. Krawiec, Judith A.
Krawiec, Karen K. Hancock
& Susan K. Mancini Volume 2608, Page 342
Subject Property Area: 15,663± SF
0.36± Acres
BENCHMARK
BENCHMARK
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C400
GRADING,
DRAINAGE &
UTILITY PLAN
N
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C900
EROSION &
SEDIMENT
CONTROL
DETAILS
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C901
SITE AND CIVIL
3"
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C902
SITE AND CIVIL
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C903
TOWN OF
GLASTONBURY
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
C904
TOWN OF
GLASTONBURY
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
A101
PUMPING STATION
ELEVATION VIEW
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT
FOR CONSTRUCTION
STRUCTURAL
GENERAL NOTES
S001
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT
TYPICAL DETAILS I
S002
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
TYPICAL DETAILS II
S003
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
FOUNDATION PLAN
AND DETAILS
S100
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
SLAB PLAN AND
S200
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
ALUMINUM STAIR
S201
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
CANOPY FRAMING
PLAN AND DETAILS
S300
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
CANOPY FRAMING
PLAN AND DETAILS II
S301
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
JUNE 2026
MMM
PJG / NMS
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
WET WELL FRAMING
PLAN AND DETAILS
S302
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
M100
PROCESS
GENERAL
NOTES AND
SCHEDULES
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
M201
PROCESS
MECHANICAL
DEMOLITION
PLAN
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
M202
PROCESS
MECHANICAL
DEMOLITION
SECTION
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
M301
PROCESS
MECHANICAL
PUMP STATION
UPGRADE PLAN
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
M901
MECHANICAL
DETAILS
PUMP DISCHARGE PIPING
N.T.S.
NIPPLES (TYPICAL)
2" 316 S.S. PIPE CLOSE
2" BALL VALVE
PUMP DISCHARGE PIPING
N.T.S.
WITH SPRING LOADED
2" BALL VALVE
FLUSH & TEST
LIQUID FILL-BLEED
1/2" NPT SNUBBER
WITH 1/2" NPT BASE
NIPPLES (TYPICAL)
2" 316 S.S. PIPE CLOSE
BALL VALVE w/ CAP
HANDLE TO CLOSE
CONNECTION
OIL FILLED GAUGE
316 S.S. 4.5"
RANGE: 0 TO 60 PSI
2" BALL VALVE
2" X 1/2" 316 SS DIAPHRAGM
SEAL WITH TEFLON COATED
STAINLESS STEEL DIAPHRAGM
2" COMBINATION AIR VALVE
FOR WASTEWATER
MODEL D-025L BY A.R.I OR
APPROVED EQUAL
NOTES:
O
W V U T S R
K
M N
L
I J
H
VIBRATION, MECHANICAL ANALYSIS
TEMPERATURE
WEIGHT, FORCE
RADIATION
SPEED, FREQUENCY
SAFETY
INTEGRATE, TOTALIZE
TIME, TIME SCHEDULE
LEVEL
CURRENT (ELECTRICAL)
POWER
HAND
MOMENTARY
DIFFERENTIAL
RATIO (FRACTION)
FIRST-LETTER
E F
D C
SYMBOL
A B
ANALYSIS
INITIATING VARIABLE
VOLTAGE
FLOW RATE
BURNER, COMBUSTION
MEASURED OR
Q P
PRESSURE, VACUUM
QUANTITY
MULTIVARIABLE
Z Y X
EVENT, STATE OR PRESENCE
POSITION, DIMENSION
UNCLASSIFIED
SCAN
G - -
TIME RATE OF CHANGE
Z AXIS
Y AXIS
X AXIS
INDICATE
RECORD
POINT (TEST) CONNECTION
ORIFICE, RESTRICTION
LIGHT
SENSOR (PRIMARY ELEMENT)
ALARM
GLASS, VIEWING DEVICE
WELL
MULTIFUNCTION
UNCLASSIFIED
INSTRUMENTATION IDENTIFICATION LETTERS
PASSIVE FUNCTION
READOUT OR
TRANSMIT
SWITCH
CONTROL
CONTROL STATION
VALVE, DAMPER, LOUVER
MULTIFUNCTION
DRIVER, ACTUATOR, UNCLASSIFIED
RELAY, COMPUTE, CONVERT
UNCLASSIFIED
FUNCTION
OUTPUT
FINAL CONTROL ELEMENT
MIDDLE, INTERMEDIATE
LOW
HIGH
MULTIFUNCTION
UNCLASSIFIED
MODIFIER
SUCCEEDING-LETTERS
LOCALLY MOUNTED
INSTRUMENT SYMBOLS
FRONT OF PANEL
MOUNTING (PRIMARY
LOCATION)
REAR OF PANEL
OR RACK
MOUNTED
FRONT OF PANEL
MOUNTING (AUXILIARY
LOCATION)
PROCESS/CONTROLS INTERLOCK
SHARED DISPLAY
FUNCTION
(BLIND)
SHARED DISPLAY FUNCTION
(OPERATOR ACCESS
PRIMARY LOCATION)
COMPUTER
FUNCTION (BLIND)
SHARED DISPLAY
FUNCTION (OPERATOR
ACCESS
AUXILIARY LOCATION)
COMPUTER FUNCTION
(OPERATOR ACCESS
PRIMARY LOCATION)
PLC LOGIC
FUNCTION (BLIND)
PLC LOGIC FUNCTION
(OPERATOR ACCESS
PRIMARY LOCATION)
COMPUTER FUNCTION
(OPERATOR ACCESS
AUXILIARY LOCATION)
PLC LOGIC FUNCTION
(OPERATOR ACCESS
AUXILIARY LOCATION)
HAND/OFF/AUTOH/O/A
INSTRUMENTATION DESIGNATIONS
EMERGENCY STOP
SELECTOR SWITCH
E-STOP
A/B
AUTO/MANUALA/M
FORWARD/REVERSEF/R
MOTOR OVERLOAD TRIPOL
OPEN CLOSE
HYDROGEN ION CONCENTRATIONpH
O/C
ON OR OFFO/O
STARTS
START STOPS/S
I
INSTRUMENT LINE SYMBOLS
CONNECTION TO PROCESS OR
INSTRUMENT IMPULSE LINE
INSTRUMENT PNEUMATIC SIGNAL LINE
(3-15 PSIG UNLESS NOTED OTHERWISE)
INSTRUMENT ELECTRONIC SIGNAL LINE
(CURRENT OR VOLTAGE AS NOTED ON SPEC SHEETS)
FIELD TUBING OR CAPILLARY FOR THERMAL
ELEMENTS AND PRESSURE SEALS
INTERNAL SYSTEM LINK
(SOFTWARE OR DATA LINK)
UNGUIDED ELECTROMAGNETIC OR SONIC SIGNAL
HEAT TRACED LINE
INSTRUMENTS SHARING
COMMON HOUSING
FE
MAGNETIC FLOW
METER
LE
ULTRASONIC LEVEL
SENSOR
PI
PRESSURE GAUGE
TI
TEMPERATURE GAUGE
PRIMARY ELEMENTS
M
FE
TURBINE FLOW
METER
FE
ULTRASONIC FLOW
METER
FE
ORIFICE FLOW
METER
LS
PROBE LEVEL SENSOR
PDI DIFFERENTIAL PRESSURE
GAUGE
SPECIFIC
SWITCH
FUNCTION,
(TYP)
LOOP NUMBER
HAND SWITCHES
PERSONAL SAFETY ALARM PUSH
BUTTON (AIL)
OR EMERGENCY STOP PUSH BUTTON
(RIL)
AIL - AMBER INDICATING LIGHT
BIL - BLUE INDICATING LIGHT
GIL - GREEN INDICATING LIGHT
RIL - RED INDICATING LIGHT
WIL - WHITE INDICATING LIGHT
VENTURI FLOW METER
LE
LEVEL CAPACITANCE
FS
FLOW SWITCH
PS
PRESSURE SWITCH
CHLORINE RESIDUALCLR
TURBIDITYTU
ALARM ACTIVATED HORN
RED FLASHING BEACON HORNRFBH
INDUSTRIAL ETHERNET SWITCH/HUB
FIBER OPTIC CONVERTER
PERSONAL SAFETY ALARM ILLUMINATED
PUSHBUTTON
EMERGENCY STOP ILLUMINATED PUSHBUTTON
RED INDICATING LIGHT
RS232/RS485 SERIAL
POWER
INSTRUMENTATION
ETHERNET
ESE
FOC
PSA
HLS HIGH LOW ANALOG SELECT
PSA PERSONAL SAFETY ALARM
TT
TEMPERATURE TRANSMITTER
PT
PRESSURE TRANSMITTER
AV AUTOMATIC CONTROL
VALVE
EMERGENCY SHUT DOWNESD
DIGITAL OUTPUT
DIGITAL INPUT
ANALOG OUTPUT
ANALOG INPUT
DO DISSOLVED OXYGEN
NOX NITRATE
TSS TOTAL SUSPENDED SOLIDS
FIBER OPTIC MEDIA
DO
DI
AO
AI
OIT OPERATOR INTERFACE TERMINAL
HMI HUMAN MACHINE INTERFACE
PC PERSONAL COMPUTER
LCP LOCAL CONTROL PANEL
CP CONTROL PANEL
PLC PROGRAMMABLE LOGIC CONTROLLER
FO FIBER OPTIC MEDIA
(LOCAL PANEL MOUNT HMI)
1. THIS IS A GENERAL LEGEND AND NOTES SHEET AND SOME SYMBOLS OR NOTATIONS MAY NOT APPLY TO
THIS PROJECT.
2. TAG ID NUMBERS AND EQUIPMENT TAG ID NUMBERS SHALL BE PROVIDED ON ACTUAL INSTRUMENTS AND EQUIPMENT. NUMBER COMPLETE FACILITY EQUIPMENT AND INSTRUMENTATION WITH TAG IDS, ENGRAVED
LAMICOID WHITE ON BLACK.
3. ANALOG SIGNALS ARE 4-20 MA DC UNLESS OTHERWISE NOTED.
4. ALL PROCESS AND PROGRAMMABLE LOGIC CONTROL FUNCTIONS ARE DETAILED IN THE SPECIFICATIONS.
THE FOLLOWING SHEETS SCHEMATICALLY REPRESENT INSTRUMENTATION AND CONTROL.
5. ALL PROCESS CONTROL FUNCTIONS AND DISPLAYS TO BE PROVIDED AT THE COMPUTER CONTROL SYSTEM SHALL BE PROVIDED BY THE INSTRUMENTATION AND CONTROL SYSTEM PROVIDER AS SPECIFIED.
6. SEE ELECTRICAL DRAWINGS FOR INSTRUMENTATION BLOCK DIAGRAMS FOR INTERCONNECTIONS
BETWEEN CONTROL DEVICES, WIRING, AND SCADA SYSTEM NETWORK.
7. DEVICES MAY BE SUFFIXED "H" OR "L" TO DESIGNATE HIGH OR LOW ACTIVATION, AND "HH" OR "LL" TO
DESIGNATE HIGH-HIGH OR LOW-LOW ACTIVATION.
8. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
INSTRUMENTATION EQUIPMENT IDENTIFICATION, LINE SYMBOLS, ADDITIONAL ABBREVIATIONS AND
INSTRUMENT TAGGING CONVENTIONS.
9. PROVIDE ISOLATION VALVES ON ALL SAMPLE LINES, 2 VALVE MANIFOLDS FOR ALL ABSOLUTE AND PRESSURE GAUGE DEVICES, AND 3-VALVE MANIFOLDS FOR ALL DIFFERENTIAL PRESSURE DEVICES.
10. REFERENCE CONTROL PANEL DRAWINGS INSTRUMENTATION CONFIGURATIONS AND PROCESS
INSTRUMENTATION DRAWINGS FOR DETAILS.
11. SEE ELECTRICAL AND MECHANICAL SHEETS FOR INSTRUMENT AND EQUIPMENT LOCATIONS AND
ADDITIONAL INSTALLATION DETAILS.
FOHS
##A
LYH
LSH
HS
MODIFIER
LOC
R
INSTRUMENTATION
LEGEND
DI001
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
DGM
DGM
DGM
DI001
RGT
CRH
(PCP)
LSHH-100
RUN P-1
CR1-2
CR2-2
RUN P-2
120 VAC CONTROL POWER
R
(PCP)
PLC DI
WET WELL BACKUP
LEVEL CONTROL
ENABLED
RUN P-1
VFD AT
CONSTANT
SPEED
CR1-4
CR2-4
RUN P-2
VFD AT
CONSTANT
SPEED
CRH-1
CR1
(PCP)
CR2
(PSCP)
RUN P-1
RUN P-2
CR2-1
TDR2
N.O.T.C.
(PCP)
CR1-1
TDR1
N.O.T.C.
(PCP)HS-100B (PCP)
RESET
(PCP)
TDR4
N.C.T.O.
TDR2 (ON-DELAY): 0 TO 600 SECS.
INITIALLY SET TO 45 SECS.
TDR3 (OFF-DELAY): 0 TO 600 SECS.
INITIALLY SET TO 90 SECS.
CR1-3
CR2-3
TDR1 (ON-DELAY): 0 TO 600 SECS.
INITIALLY SET TO 15 SECS.
HS-100A (PCP)
OFF ON
N.T.S.
N.T.S.
OPERATOR
INTERFACE
TERMINAL
ETHERNET
SWITCH
UPS
FRONT-PANEL
PROG. PORT
CAT6 PATCH CABLE
(TYP.)
PLC
PUMP CONTROL PANEL (PCP)
ALARM LIGHT
NOTE: SEE SECTION 40 95 13 FOR ADDITIONAL CONTROL
PANEL REQUIREMENTS, DEVICES AND FUNCTIONS.
NOTES:
1. 120 VAC CONTROL POWER FOR THIS CIRCUIT IS NOT FROM THE UPS
2. CONTACT IS FROM THE INTRINSICALLY SAFE RELAY IN THE PUMP CONTROL PANEL
3. 120 VAC POWER FOR THE INSTRICALLY SAFE RELAYS NOT FROM THE UPS
MINICSAS
RELAY P-1
MINICSAS
RELAY P-2
CRH-2
(PCP)
CR3-2
RUN P-3
CR3-4
RUN P-3
VFD AT
CONSTANT
SPEED
CR2
(PSCP)
RUN P-3
CR3-1
TDR3
N.O.T.C.
MINICSAS
RELAY P-3
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
DGM
DGM
DGM
INSTRUMENTATION
DETAILS
PART 1
DI501DI501
LSHH
LYH
LY
100A
XS
109A
XS
109B
LE
100A
HS
##A
I
FROM BACKUP
LEVEL CONTROL
CIRCUIT (TYP.)
NOTES
1. SEE DIVISION 26 FOR VFD SPECIFICATIONS.
2. TYP. FOR 3 PUMPS
YL
KQI
YA
TAH
LSH
I I
HS
##B
I
I
LSH
TSH
FIT
FE
VENDOR FURNISHED
CABLE
XS
110A
XS
110B
XS
111A
XS
111B
M
120 VAC
POWER
TIT
XS
XS
SUBMERSIBLE
LEVEL TRANSDUCER
AND TRANSMITTER
FLOAT SWITCH
X-IN
DIAMETER
LT
100A
I
INSTRUMENTATION
DETAILS
PART 2
DI502
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
DGM
DGM
DGM
DI502
ESL
ESH
XS
010A
HS
YL
010A
XS
010B
TIT
YL
010B
YL
010C
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
DGM
DGM
DGM
INSTRUMENTATION
DETAILS
PART 3
DI503DI503
ETHERNET (CAT6)
ETHERNET (FIBER OPTIC)
ETH
FO
OPERATOR INTERFACE
TERMINAL (OIT)
MODULAR
PROGRAMMABLE LOGIC
CONTROLLER (PLC)
INDUSTRIAL ETHERNET SWITCH
WITH RJ45 PORTS
UPS UNINTERRUPTIBLE POWER
SUPPLY
POWER/DATA PORT
RJ45 PORT
120 VAC
GFCI OUTLET
OIT
LEGEND
RJ45 PORT
ES-MCP
PLC-MCP
ETH
CAT6 PATCH CABLE
(TYP.)
MAIN CONTROL PANEL (MCP)
UPS
PARKER TERRACE PS
OIT-MCP
CCF
PROGRAMMABLE LOGIC
CONTROLLER (PLC) WITH
EMBEDDED I/O
CCF CORROSION CONTROL
FACILITY
ISP ROUTER FOPP FO
FURNISHED BY OWNER,
INSTALL BY
CONTRACTOR
ES-NCP
NETWORK VIDEO RECORDER
ETH ETH
ETH
VFD1
VFD2
NETWORK CONTROL PANEL (NCP)
ETH ETH
ETH
ETH
ETH
ETH
ETH ETH
ETH
ETH
ETH
ETH
ETH
ETH ETH ETH ETH
ETH ETH ETH ETH
ETH
ETH ETH ETH ETH
IP CAM 1
IP CAM 2
IP CAM 3
FIREWALL
ETH
TOWN FIBER,
FURNISHED BY OWNER
VFD3
ETH ETH
ETH
ETH
ETH
ETH
ETH ETH
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2025
Issued For:
MARCH 2026
PCB
KJM
RGT
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT 06033
FOR CONSTRUCTION
DGM
DGM
DGM
NETWORK
DIAGRAM
DI701DI701
ACU-2
LP
ATS VFD1 TRXVFD2 VFD3
MDP
AC
U
-1
MTS
M C
B
180 KW NATURAL GAS
GENERATOR 12'-8" X 4'-5"
H P-
ELECTRICAL PLAN1
SCALE: 1/4" = 1'-0"E101
LP-11
M
LP-1,3
WP
LP-5,7
A A
A
A
EM EX
EM
EX
LP-6
B
B
B
LP-8
LP-8
LP-8
LP-13
LP-11
TO UTILITY
MDP-1,3,5
MDP-2,4,6
MDP-7,9,11
PUMP-1
PUMP-2
PUMP-3
WP
LP-9
H P-
LP-2,4
WP
WP
WP
GFI
GFI
GFI
LP-13
LP-17 LP-19
LP-15
WP
LP-12,14,16
5HP HOIST MOTOR
A
A
LP-18
MCP
N C
P
LP-20
OS
J
J
J
J J
J
TC
LP-10
TYP
30X30 ACCESS HATCH
MDP-8,10,12
WP
LP-22
J
J
EF-1
MCB MDP
TRX
LP
400A
MCPVFD1 VFD2 VFD3
400A, 480/277V
3PH, 4W
100A, 208/120V
3PH, 4W
PUMP-1 PUMP-2 PUMP-3
POWER RISER DIAGRAM2
NTSE101
M
4#600KCMIL ~ 4"C
3#2/0 + 1#6G ~ 2"C
3#6 + 1#10G ~ 1"C 4#1 + 1#8G ~ 2"C
2#12 + 1#12G ~ 3/4"C
30KVA,
I/P: 480V, 3PH, 3W
O/P: 120/208V, 3PH, 4W
TO UTILITY
MTS ATS
4#600KCMIL + 1#3G ~ 4"C
400A, 480V, NEMA
3R GENERATOR
CONNECTION BOX
4#600KCMIL + 1#3G ~ 4"C
400-3
NEW 180KW,
480/277V
GENERATOR
N
L
E
N
L
E
#3/0 GROUNDING
CONDUCTOR
#6 GROUNDING
CONDUCTOR
WEATHERPROOF UTILITY
METER PER UTILITY CO
REQUIREMENTS
3#1/0 + 1#6G ~ 2"C
TO PUMP CONNECTION
JUNCTION BOX (SEE PLANS)
ELECTRICAL KEYNOTES
UNIT IS POWERED FROM ASSOCIATED OUTDOOR UNIT. PROVIDE CONDUIT,
CONDUCTORS, AND FINAL CONNECTIONS REQUIRED FOR PROPER OPERATION.
COORDINATE REQUIREMENTS WITH MECHANICAL CONTRACTOR, MANUFACTURERS
REQUIREMENTS, AND APPROVED SHOP DRAWINGS.
WIRE THROUGH TIME CLOCK.
CONNECT TO CIRCUIT VIA ASSOCIATED VFD. PROVIDE 3#1/0 + 1#6G IN 2” CONDUIT &
(1) 2" SPARE CONDUIT. RUN CONDUIT FROM JUNCTION BOX BELOW GRADE TO VFD
LOCATION. PROVIDE ALL CONDUCTORS AND FINAL CONNECTIONS PER VFD
MANUFACTURER'S RECOMMENDATIONS FOR PROPER OPERATION.
PROVIDE AND INSTALL MELTRIC DS200 SWITCH-RATED FEMALE RECEPTACLE ON
NEMA 4X JUNCTION BOX (200A, 480V, 3Ø) FOR WASTEWATER PUMP TO VFD
CONNECTION. RECEPTACLE SHALL BE RATED FOR WET ENVIRONMENTS.
COORDINATE INSTALLATION WITH MANUFACTURERS REQUIREMENTS AND TYPICAL
PUMP CABLE DISCONNECT DETAIL ON SHEET M901.
PROVIDE AND INSTALL MELTRIC DS200 SWITCH-RATED MALE INLET (200A, 480V, 3Ø)
ON PUMP POWER CABLE FOR CONNECTION TO FEMALE RECEPTACLE. INLET SHALL
BE COMPATIBLE WITH DS200 RECEPTACLE AND RATED FOR WET ENVIRONMENTS.
COORDINATE INSTALLATION WITH MANUFACTURERS REQUIREMENTS AND TYPICAL
PUMP CABLE DISCONNECT DETAIL ON SHEET M901.
OCCUPANCY SENSOR RATED FOR WET/DAMP LOCATIONS TO BE MOUNTED UNDER
CANOPY FOR CONTROL OF CANOPY LIGHTING. LIGHTS TO BE CONTROLLED IN
COMBINATION WITH TIME CLOCK AND OCCUPANCY SENSOR. LIGHTS WILL BE OFF
DURING DAYTIME HOURS. DURING NIGHT TIME HOURS, LIGHTS WILL BE TURNED ON
BY OCCUPANCY SENSOR. COORDINATE ON/OFF TIMES WITH OWNER/ARCHITECT.
LIGHT FIXTURES TYPE "B" TO BE CONTROLLED IN COMBINATION WITH TIME CLOCK
AND FIXTURE'S OCCUPANCY SENSOR KIT. LIGHTS WILL BE OFF DURING DAYTIME
HOURS. DURING NIGHT TIME HOURS, LIGHTS WILL BE TURNED ON BY THEIR
CORRESPONDING OCCUPANCY SENSOR. COORDINATE ON/OFF TIMES WITH
OWNER/ARCHITECT. TYPICAL NOTE FOR FIXTURE TYPE “B”.
PROVIDE MAGNETIC DOOR CONTACT SWITCH (NORMALLY CLOSED) AT WET WELL
ACCESS HATCH. WIRE AS LOW-VOLTAGE CONTROL INPUT TO START EXHAUST FAN
UPON HATCH OPENING.
PROVIDE EXHAUST FAN MOTOR STARTER WITH OVERLOAD PROTECTION IN NEMA 4X
ENCLOSURE. PROVIDE CONTROL POWER TRANSFORMER AS REQUIRED FOR
LOW-VOLTAGE CONTROL CIRCUITS. FAN SHALL BE CONTROLLED BY HATCH
CONTACT SWITCH AND MANUAL OVERRIDE SWITCH AS INDICATED.
PROVIDE MAINTAINED MANUAL OVERRIDE SWITCH TO START WET WELL EXHAUST
FAN. OVERRIDE SHALL BYPASS HATCH CONTACT SWITCH AND TURN FAN ON.
PROVIDE LABEL ON SWITCH THAT SAYS, “WET WELL EXHAUST FAN OVERRIDE”.
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
MARCH 2026
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT
CONSTRUCTION
BJZ
BJZ
CHD
PUMP
STATION
ELECTRICAL
PLAN
E101
4 5
4 5
4 5
ACU-2
ATS VFD1 TRXVFD2 VFD3
MDP
AC
U
-1
MTS
M C
B
180 KW NATURAL GAS
GENERATOR 12'-8" X 4'-5"
HP-1
CONTROL WIRING PLAN1
SCALE: 1/4" = 1'-0"E102
M
PUMP-1
PUMP-2
PUMP-3
H P-
MCP
J
IS
P
INTRINSIC SAFETY
BARRIER PANEL
NETWORK CONTROL
PANEL
J
J
(TYP)
J
J
LP
N
C P
T
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
MARCH 2026
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT
CONSTRUCTION
BJZ
BJZ
CHD
PUMP
STATION
CONTROL
WIRING PLAN
E102
CONTROL WIRING KEYNOTES
COORDINATE ALL CONDUCTOR SIZES AND ROUTING WITH INSTRUMENTATION AND
CONTROLS PLANS & MANUFACTURERS RECOMMENDATIONS
1" CONDUIT WITH TWO VENDOR CABLES FOR FLOAT SWITCH AND SUBMERSIBLE
LEVEL TRANSDUCER AND TRANSMITTER TO INTRINSIC SAFETY BARRIER PANEL (ISP).
COORDINATE CABLES WITH MANUFACTURERS INSTALLATION GUIDE. COORDINATE
JUNCTION BOX MOUNTING HEIGHT AND LOCATION WITH OWNER/ARCHITECT.
(2) 3/4" CONDUITS FROM ISP TO MCP. (1) WITH 2#14 AWG AND (1) WITH 2C-TSH.
1" CONDUIT WITH TWO CAT6 CABLES FOR CAMERAS TO NCP. COORDINATE LOCATION
AND MOUNTING HEIGHT OF JUNCTION BOX WITH OWNER/ARCHITECT
3/4" CONDUIT WITH ONE CAT6 CABLE FOR CAMERA TO NCP. COORDINATE LOCATION
AND MOUNTING HEIGHT OF JUNCTION BOX WITH OWNER/ARCHITECT
3/4" CONDUIT WITH 2C-TSH FROM FLOW METER TO MCP
(2) 3/4" CONDUITS FROM VFD TO MCP. (1) WITH 14#14 AWG AND, (1) WITH TWO SETS
2C-TSH, AND A CAT6 CABLE.
3/4" CONDUIT WITH 6#14 AWG FROM VFD TO ASSOCIATED PUMP
3/4" CONDUIT WITH 4#14 AWG FROM GENERATOR TO MCP
3/4" CONDUIT WITH 4#14 AWG FROM ATS TO MCP
1-1/2" CONDUIT BELOW GRADE FOR FIBER OPTIC SERVICE, SEE SITE UTILITY PLAN
EU1
3/4" CONDUIT WITH 6#14 AWG FOR DOOR SWITCH AND DURESS PUSH BUTTON TO
MCP. COORDINATE LOCATION AND MOUNTING HEIGHT WITH OWNER/ARCHITECT
3/4" CONDUIT WITH 2C-TSH FOR BUILDING THERMOSTAT TO MCP.
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
MARCH 2026
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT
CONSTRUCTION
BJZ
BJZ
CHD
ELECTRICAL
SCHEDULES
E201
Parker Terrace
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
MARCH 2026
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT
CONSTRUCTION
BJZ
BJZ
CHD
ELECTRICAL
SITE UTILITY
PLAN
EU1
ELECTRCIAL SITE PLAN1
SCALE: 1" = 8'-0"ESU1
(2) 1-1/2"C BELOW GRADE
FOR FIBER OPTIC TO NCP
4#600KCMIL IN (1) 4"C
PLUS (1) 4"C SPARE
BELOW GRADE
POLE MOUNTED UTILITY
TRANSFORMERS
LIMIT OF WORK
NOTE:
UNDERGROUND CONDUITS SHALL BE DIRECT BURIED BELOW GRADE.
CONDUITS INSTALLED UNDER ROADWAYS, DRIVEWAYS, OR OTHER
PAVED AREAS SHALL BE CONCRETE ENCASED. SEE DETAIL 2 ON THIS
SHEET FOR CONCRETE-ENCASED DUCT BANK INSTALLATION. CONDUIT
SHALL BE PVC SCHEDULE 80 WHERE EMERGING FROM GRADE.
NOTES:
1.
2.
3.
2 - WAY
5 3/4"
FINISHED GRADE (PAVEMENT OR
GRASS) - AFTER INSTALLATION
REPAIR TO PRE CONSTRUCTION
CONDITIONS TO THE ACCEPTANCE
OF THE OWNER.
8 1/2" 5 3/4"
3/
4"
3/ 4"
20"
/2
4.
5.
NOTE 2
2" M
IN
(T
YP
2" MIN.
(TYP.)
3"
MIN.
DUCTBANK DETAIL2
NOT TO SCALEESU1
CONCRETE SHALL BE 2500 PSI, 1/2" MAXIMUM STONE, 6-9" SLUMP OF SUCH
CONSISTENCY THAT SPADING WILL ENSURE THE FLOW OF CONCRETE BETWEEN AND
UNDER INDIVIDUAL DUCTS BUT NOT SO WET AS TO FLOAT THE DUCTS. FOR TIER
BUILDUP CONSTRUCTION A STIFFER CONSISTENCY SHOULD BE USED.
MINIMUM COVER FROM TOP OF DUCTBANK TO THE PAVEMENT OR EARTH SURFACE
SHALL BE AS FOLLOWS:
a. STATE HIGHWAYS -- 36"
b. RAILROAD TRACKS -- 60"
c. ALL OTHER AREAS -- 24"
DUCTS SHALL BE 4" SCHEDULE 40 PVC CONDUIT.
PROVIDE MAGNETIC WIRING TAPE +/- 12" ABOVE TOP OF DUCTBANK WITH "ELECTRIC" LABEL.
DUCTBANK CONFIGURATION IS TYPICAL AND SHOWS MINIMUM REQUIREMENTS. DETAIL SHALL BE
ADAPTED AS REQUIRED TO THE CONDUIT SIZE. QUANTITY AND CONFIGURATIONS SHOWN ON
CONTRACT DRAWINGS.
3" COMPACTED GRAVEL - TYPICAL
ALL CONFIGURATIONS
180 KW NATURAL GAS
GENERATOR 12'-8" X 4'-5"
MECHANICAL PLAN1
SCALE: 1/4" = 1'-0"M-1
ACU-1
ACU-2
HP-1
T
W
EPWH-1
FCO
G
HP-2
AIR SOURCE HEAT PUMP PIPING DETAIL3
SCALE: NOT TO SCALE
REFRIGERANT PIPE SUPPORT AT WALL2
SCALE: NOT TO SCALE
A
TO
ACU-1 & ACU 2
WALL MOUNTED HEAT PUMP DETAIL1
SCALE: NOT TO SCALE
3/4"
3/4" CW DROP.
WH-1
BALL VALVE SHUT-OFF
3/4" CW DROP.
BALL VALVE SHUT-OFF
A M-1
A M-1
30X30 ACCESS HATCH
16X16 ALUMINUM
EXHAUST DUCT DN
FROM EXHAUST FAN.
REFER TO SECTION
SECTION A2
SCALE: 1/4" = 1'-0"M-1
X1
ALUMINUM LANDING
FLASHING AND SEALING BY GC
CURB
MECHANICAL KEYNOTES
COORDINATE REFRIGERANT PIPE ROUTING IN FIELD TO AVOID CONFLICTS WITH ELECTRICAL
EQUIPMENT, PANELS, AND CONDUITS.
PROVIDE 1" CONDENSATE DRAIN DOWN EXTERIOR WALL TO GRADE AT LOCATION INDICATED.
CONCEAL CONDENSATE PIPING WITH PVC AND TERMINATE WITH A MITERED CUT AND
CONCRETE BLOCK SPLASH.
1-1/4" GAS DOWN OF FACE OF BUILDING, ROUTE TO GENERATOR
3/4” COLD WATER UP FROM BELOW FLOOR, PROVIDE BALL VALVE SHUT-OFF'S, METER BY
LOCAL UTILITY.
3" SANITARY BELOW FLOOR ROUTE 5'-0" OUT FROM BUILDING FACE. COORDINATE WITH CIVIL.
2" VENT UP IN WALL, 2" VENT THROUGH ROOF.
INSTANTANEOUS ELECTRIC HOT WATER HEATER, WALL MOUNTED. ROUTE 1/2" HOT WATER
TO MOP BASIN FAUCET.
WALL MOUNT HEAT PUMP. REFER TO DETAIL.
16X16 ALUMINUM EXHAUST DUCT. TERMINATE 12" ABOVE LANDING.
14x28 EXHAUST LOUVERED GRILLE PRICE MODEL: 630, 45° FIXED LOUVERS, 3/4" BLADE
SPACING, SURFACE MOUNT, ALUMINUM CONSTRUCTION.
NEW EXHAUST FAN TO SERVE EXISTING WET WELL. FAN TO BE MOUNTED ON THE NEW
TOPPING SLAB OF THE WET WELL. REFER TO SCHEDULE. CONTRACTOR SHALL FLASH IN
CURB TO CONCRETE SLAB AND SEAL OPENING AROUND AND UNDERNEATH THE CURB
FLANGE WATERTIGHT WITH WATERPROOF SEALANT.
ELECTRIC POINT OF USE WATER HEATER SCHEDULE
HEAT PUMP SCHEDULE
DUCTLESS INDOOR UNIT SCHEDULE
PLUMBING FIXTURE SCHEDULE
Date:
Drawn By:
Reviewed By:
Approved By:
Drawing Title:
Sheet Number:
Seal:
Revisions:
Rev Date Description
Project:
Consultants:
W&S Project No:
WESTON & SAMPSON COPYRIGHT 2022
Issued For:
MARCH 2026
ENG24-1204
Weston & Sampson Engineers, Inc.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
(860) 513-1473 (800) SAMPSON
www.westonandsampson.com
TOWN OF GLASTONBURY
PARKER TERRACE PUMPING
STATION UPGRADES
30 PARKER TERRACE,
GLASTONBURY, CT
CONSTRUCTION
BZ
BZ
RH
PUMP
STATION
MECHANICAL
PLAN
M-1
SCHEDULE OF PIPE MATERIALS
FAN SCHEDULE
P101
| 01 - Cover |
| Cover |
| 02-Civil Drawings |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-001 General Notes |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-001 General Notes |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-100 Existing Site Plan |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-100 Existing Site Plan |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-200 Demo Sheet |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-200 Demo Sheet |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-300 Pump Station Layout |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-300 Pump Station Layout |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-400 Pump Station Utility |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-400 Pump Station Utility |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-900 Soil & Erosion Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-900 Soil & Erosion Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-901 Civil Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-901 Civil Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-902 Civil Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-902 Civil Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-903 Town Civil Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-903 Town Civil Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-904 Town Civil Details |
| 02 Parker Terrace Pump Station Civil Drawing - FEB 2026-C-904 Town Civil Details |
| 03 - Elevation Drawing-A101 |
| A101 |
| 04 - Structures |
| Parker Terrace Pump Station Structure-S001 NOTES |
| Parker Terrace Pump Station Structure-S002 DETS |
| Parker Terrace Pump Station Structure-S003 DETS2 |
| Parker Terrace Pump Station Structure-S100 FDN PLN |
| Parker Terrace Pump Station Structure-S200 SLB PLN |
| Parker Terrace Pump Station Structure-S201 STAIR DTL |
| Parker Terrace Pump Station Structure-S300 FRM PLN |
| Parker Terrace Pump Station Structure-S301 FRM PLN 2 |
| Parker Terrace Pump Station Structure-S302 WETWALLFRM |
| 05 - Process Mechanical Drawings |
| 05 Parker Terrace Pump Station Mechanical Drawing - Jan 2026-M-100 General Notes |
| M-100 General Notes |
| 05 Parker Terrace Pump Station Mechanical Drawing - Jan 2026-M-201 Demo Sheet |
| M-201 Demo Sheet |
| 05 Parker Terrace Pump Station Mechanical Drawing - Jan 2026-M-202 Demo Sheet |
| M-202 Demo Sheet |
| 05 Parker Terrace Pump Station Mechanical Drawing - Jan 2026-M-301 Proposed Pump Station |
| M-301 Proposed Pump Station |
| 05 Parker Terrace Pump Station Mechanical Drawing - Jan 2026-M-901 Mechanical Details |
| M-901 Mechanical Details |
| 06 - Instrumentation |
| DI001 INSTRUMENTATION LEGEND |
| DI501 INSTRUMENTATION DETAILS PART 1 |
| DI502 INSTRUMENTATION DETAILS PART 2 |
| DI503 INSTRUMENTATION DETAILS PART 3 |
| DI701 NETWORK DIAGRAM |
| 07 - Electrical |
| E-1-E101 |
| E-1-E102 |
| E-1-E201 |
| E-1-ESU1 |
| 08 - Mechanical |
| M-1 |