Broward County, Florida, through its Water and Wastewater Services department, is soliciting bids for the Regional Effluent and Reuse Solutions - Bid Pack 1 project, a critical infrastructure development involving the construction of a secondary effluent water transmission main. The project encompasses the installation of 1,320 linear feet of new secondary effluent water pipes using horizontal directional drilling and 105 linear feet using microtunneling methods. Comprehensive work includes installing fittings and valves, restoring green areas, replacing concrete sidewalks and curbing, resurfacing asphalt, and reinstating trees, pavement markings, and signage. Vendors must possess specific state or county contractor licenses, including Certified General Contractor or Certified Underground Utility and Excavation Contractor certifications, and must perform at least 50% of the contract work without subcontracting. The solicitation requires electronic submission through BPRO by August 22, 2025, at 2:00 p.m., with vendors encouraged to submit questions through the platform prior to the submission deadline. Evaluation will be based on the lowest responsive, responsible bidder, with the county potentially ordering up to an additional 20% of original quantities within one year of award.

The project is funded through a $6,250,000 Community Development Block Grant Mitigation (CDBG-MIT) from the Florida Department of Economic Opportunity, with Broward County providing a matching $6,250,000, bringing the total project cost to $12,500,000. While no specific set-aside designations for disadvantaged enterprises are explicitly detailed, the county requires comprehensive ownership disclosure and has provisions that prohibit considering social, political, or ideological interests when evaluating vendor responsibility. The project does not indicate an incumbent vendor, but requires integration with existing water infrastructure, including connections to the North Regional Wastewater Treatment Plant and the City of Pompano Beach Oasis Water Reuse facility. Based on the bid tabulation, total bid amounts from five contractors range from approximately $3,979,905 to $7,501,006, with bid allowances of $344,770. The project includes strict requirements for insurance, with general liability set at $2,000,000 per occurrence and $4,000,000 in aggregate, and specific provisions for environmental liability, worker's compensation, and other operational risks.

Opportunity text

Scope of Work: Scope includes the furnishing of all labor, materials, equipment, services, and incidentals for the construction of effluent water transmission main which includes 1,320 linear feet of new secondary effluent water pipes through a horizontal directional drill method of installation, and 105 linear feet of new secondary effluent water pipes through a microtunnel method of installation. Other items to be completed include installation of all required fittings and valves, restoration of green areas, replacement of concrete sidewalk and curbing, replacement and/or milling and resurfacing of asphalt, and replacement of all disturbed trees, pavement markings and signage. Solicitation Requirements: (Vendor is cautioned that this is a summary only and the full solicitation must be reviewed). - Grant Funding - County/State License Requirements - Bonding Requirements Office of Economic and Small Business Development Requirements: Not applicable to this solicitation. Questions and Answers: The County provides a specified time for Vendors to ask questions and seek clarification regarding the solicitation requirements. All questions or clarification inquiries must be submitted through BPRO by the Questions due date. The County will respond to questions in BPRO (Messages section). Submittals: Vendor MUST submit its solicitation response electronically through BPRO and receive a Submission Receipt. It is solely the Vendor's responsibility to ensure its response is submitted and received through BPRO by the closing date and time. The County will not consider solicitation responses received by other means. Vendors are encouraged to submit in advance of the closing date and time. Refer to the Purchasing Division website or contact support@gobonfire.com for submittal instructions. In the event that the Vendor is having difficulty submitting a document, immediately notify the Purchasing Agent and then contact support@gobonfire.com for technical assistance.