22-Bid Tabulation.pdf

PDF 441 KB Posted

Attached to
Regional Effluent and Reuse Solutions - Bid Pack 1
Solicitation number
PNC2130616C1
Issued by
Florida

About this file

This document is a bid tabulation for PNC2130616C1 Regional Effluent and Reuse Solutions Bid Pack 1, which includes a comprehensive infrastructure project involving pipeline installation, directional drilling, and associated civil works. The bid covers multiple line items including bond and insurance, mobilization, maintenance of traffic, utility connections, excavation, pipe installation (24-inch HDPE and ductile iron), surface monitoring, pavement restoration, and various civil infrastructure elements. The project involves significant linear foot and quantity-based work, with five different contractors submitting competitive bids: Quality Enterprises USA, Inc., Lanzo Construction Co. Florida, David Mancini and Sons, Inc., Southern Underground Industries, and Ric-Man International.

The bid tabulation reveals total bid amounts ranging from approximately $3,979,905 to $7,501,006, with bid allowances of $344,770 across all submissions. Each contractor provided unit pricing for 23 distinct line items, covering everything from bonds and insurance to specific infrastructure installation and restoration work. The most significant cost items include horizontal directional drilling of 24-inch HDPE pipe (Item #0-7), microtunneling of 24-inch ductile iron pipe with steel casing (Item #0-8), and various pipe fitting and valve installations. The pricing demonstrates significant variability between contractors, with unit prices for similar work varying substantially, which could impact the overall project award and budgeting considerations.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PNC2130616C1 Regional Effluent and Reuse Solutions Bid Pack 1 Total Cost Allowances

Total

# Items Quantity Required

Unit of Measure Unit Price

Total Extended Amount Unit Price

Total Extended Amount Unit Price

Total Extended Amount Unit Price

Total Extended Amount Unit Price

Total Extended Amount

#0-1 Bond and Insurance 1 Lump Sum 51,600.00$ 51,600.00$ 90,000.00$ 90,000.00$ 112,500.00$ 112,500.00$ 128,697.04$ 128,697.04$ 253,000.95$ 253,000.95$ #0-2 Mobilization 1 Lump Sum 879,831.00$ 879,831.00$ 175,000.00$ 175,000.00$ 282,633.00$ 282,633.00$ 69,891.77$ 69,891.77$ 733,997.00$ 733,997.00$ #0-3 Maintenance of Traffic 1 Lump Sum 160,134.00$ 160,134.00$ 60,000.00$ 60,000.00$ 65,114.00$ 65,114.00$ 30,040.75$ 30,040.75$ 230,000.00$ 230,000.00$ #0-4 Cut and Connect to Existing Main 4 each 7,346.00$ 29,384.00$ 7,800.00$ 31,200.00$ 5,520.00$ 22,080.00$ 10,768.01$ 43,072.04$ 10,000.00$ 40,000.00$ #0-5 Pavement Removal 52 Square Yard 49.00$ 2,548.00$ 295.00$ 15,340.00$ 21.00$ 1,092.00$ 78.15$ 4,063.80$ 200.00$ 10,400.00$ #0-6 Excavation and Backfill of Temporary Pits 1296 Cubic Yard 224.00$ 290,304.00$ 68.00$ 88,128.00$ 99.00$ 128,304.00$ 95.63$ 123,936.48$ 61.00$ 79,056.00$

#0-7 F&I, 24 inch HDPE DR11 with 30 inch Steel Casing by Horizontal Directional Drill 1320 Linear Foot 780.00$ 1,029,600.00$ 1,175.00$ 1,551,000.00$ 1,378.00$ 1,818,960.00$ 1,070.32$ 1,412,822.40$ 1,700.00$ 2,244,000.00$

#0-8 F&I, 24 inch DIP with 36 inch Steel Casing by Microtunneling 105 Linear Foot 8,590.00$ 901,950.00$ 13,900.00$ 1,459,500.00$ 13,450.00$ 1,412,250.00$ 13,881.30$ 1,457,536.50$ 26,000.00$ 2,730,000.00$

#0-9 Surface Monitoring Instrumentation 16 Each 585.00$ 9,360.00$ 6,300.00$ 100,800.00$ 1,085.00$ 17,360.00$ 59,622.18$ 953,954.88$ 11,000.00$ 176,000.00$ #0-10 F&I, 24 inch Ductile Iron Pipe, Class 250 90 Linear Foot 509.00$ 45,810.00$ 810.00$ 72,900.00$ 744.00$ 66,960.00$ 604.32$ 54,388.80$ 690.00$ 62,100.00$ #0-11 F&I, 24 inch Ductile Iron Compact Fittings 1.22 Ton 75,247.00$ 91,801.34$ 58,000.00$ 70,760.00$ 108,470.00$ 132,333.40$ 135,918.37$ 165,820.41$ 47,000.00$ 57,340.00$ #0-12 F&I, 24 inch Plug Valves 4 Each 57,146.00$ 228,584.00$ 57,400.00$ 229,600.00$ 71,121.00$ 284,484.00$ 65,408.85$ 261,635.40$ 61,000.00$ 244,000.00$

#0-13 F&I, Air Release Valve With Maintenance Access Structure 4 Each 23,487.00$ 93,948.00$ 20,600.00$ 82,400.00$ 12,406.00$ 49,624.00$ 21,548.31$ 86,193.24$ 21,000.00$ 84,000.00$

#0-14 F&I, Stabilized Subgrade 64 Square Yard 26.00$ 1,664.00$ 210.00$ 13,440.00$ 83.00$ 5,312.00$ 19.74$ 1,263.36$ 44.00$ 2,816.00$ #0-15 F&I, Limerock Base 67 Square Yard 80.00$ 5,360.00$ 220.00$ 14,740.00$ 162.00$ 10,854.00$ 63.16$ 4,231.72$ 82.00$ 5,494.00$ #0-16 F&I, Asphalt Pavement Restoration 50 Square Yard 145.00$ 7,250.00$ 175.00$ 8,750.00$ 209.00$ 10,450.00$ 112.64$ 5,632.00$ 140.00$ 7,000.00$ #0-17 Mill and Resurface Asphalt Pavement 1632 Square Yard 27.00$ 44,064.00$ 31.00$ 50,592.00$ 34.00$ 55,488.00$ 35.45$ 57,854.40$ 36.00$ 58,752.00$ #0-18 F&I, Pavement Marking and Striping 1 Lump Sum 36,000.00$ 36,000.00$ 23,900.00$ 23,900.00$ 6,427.00$ 6,427.00$ 3,947.71$ 3,947.71$ 4,900.00$ 4,900.00$ #0-19 F&I, Type 'F' Curb and Gutter 450 Linear Foot 58.00$ 26,100.00$ 44.00$ 19,800.00$ 53.00$ 23,850.00$ 69.15$ 31,117.50$ 94.00$ 42,300.00$ #0-20 F&I, Concrete Median 34 Sqaure Yard 130.00$ 4,420.00$ 75.00$ 2,550.00$ 167.00$ 5,678.00$ 107.75$ 3,663.50$ 210.00$ 7,140.00$ #0-21 F&I, 6-inch Concrete Sidewalk 47 Square Yard 94.00$ 4,418.00$ 50.00$ 2,350.00$ 172.00$ 8,084.00$ 210.91$ 9,912.77$ 120.00$ 5,640.00$

#0-22 Remove and Replace Existing Road Sign and Post Assembly 1 Each 7,200.00$ 7,200.00$ 1,800.00$ 1,800.00$ 774.00$ 774.00$ 5,614.27$ 5,614.27$ 2,100.00$ 2,100.00$

#0-23 Restoration of Green Areas 3175 Square Yard 9.00$ 28,575.00$ 7.00$ 22,225.00$ 22.00$ 69,850.00$ 19.74$ 62,674.50$ 24.00$ 76,200.00$

Bid Tabulation

$4,935,231.40 $5,322,735.24 $7,501,005.95 $344,770.00 $344,770.00 $344,770.00

$4,590,461.40 $4,977,965.24 $7,156,235.95 David Mancini and Sons, Inc. Southern Underground Industries Ric-Man InternationalQuality Enterprises USA, Inc

$3,979,905.34 $344,770.00

$4,324,675.34

Lanzo Construction Co., Florida $4,186,775.00 $344,770.00

$4,531,545.00