About this opportunity

The City of Fort Worth is seeking competitive bids for the PW 2022 Bond Year 3 Contract 19 (CPN 104325), a comprehensive infrastructure improvement project spanning four primary work units. The procurement involves water, sewer, stormwater, and roadway infrastructure upgrades, including 8,680 linear feet of 8" PVC water pipe, 3,210 linear feet of 8" PVC sewer pipe, 124 linear feet of reinforced concrete pipe, and extensive pavement reconstruction totaling approximately 30,710 square yards of concrete pavement. Bidders must be prequalified in specific work types including water distribution, sewer collection, and paving construction over 15,000 square yards. Electronic bids are due on September 11, 2025, at 2:00 PM CST, with a mandatory prebid web conference scheduled for September 2, 2025, at 2:00 PM. The City will award the contract to the lowest responsible bidder, considering qualifications and competencies, with the ability to waive irregularities and reject any or all bids at its discretion.

The project includes provisions for minority and women-owned business enterprise participation, requiring contractors to meet specific business equity ordinance goals. Contractors must perform at least 35% of the work with their own organization and complete the project within 450 calendar days. The total base bid amount is approximately $385,000, with construction allowances of $100,000 for water, $50,000 for sewer, and $20,000 for stormwater to address unforeseen conditions. Bidders must provide a 5% bid bond and meet comprehensive insurance and bonding requirements. The project includes an alternative Unit 4A option for pavement pulverization, offering flexibility in approach. Successful contractors will need to demonstrate compliance with environmental regulations, including Storm Water Pollution Prevention Plan (SWPPP) requirements for areas over one acre, and coordinate with existing infrastructure such as irrigation systems and utility installations.

Opportunity text

The major work will consist of the (approximate) following: Unit I: 8,680 LF 8" PVC Water Pipe 180 LF 8" DIP Water Pipe 180 LF 20" Casing by other than open cut 780 LF 12" PVC Water Pipe 11,040 SY 11" Pulverization 11,040 SY 3" Asphalt Pavement Type D 2425 SY 11" TxDOT Full - Depth Repair CRCP (11") Unit II: 3,210 LF 8" PVC Sewer Pipe 150 LF 8" by Pipe Enlargement 29 EA 4' Manhole Unit III: 124 LF 21" RCP, Class III Unit IV: 17,560 SY 6" Concrete Pavement 13,150 SY 7" Concrete Pavement 50,760 SF 4" Concrete Sidewalk 27,000 SF 6" Concrete Sidewalk 13,800 SY 1" Asphalt Pavement Type D Unit IVA (Alternative): 16,794 SY Pavement Pulverization 16,794 SY 3" Asphalt Pvmt Type D 8,300 LF 6" Curb & Gutter