Pump Station 2 Variable Frequency Drive (VFDs) Upgrade at the Water Resource Recovery Facility

Closed State & local contract opportunity Posted

Solicitation number
REQ- 0004099
State
Michigan
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 44

Opportunity details come from glwater.bonfirehub.com. Updated .

About this opportunity

The Great Lakes Water Authority (GLWA) is seeking bids for a comprehensive Pump Station 2 Variable Frequency Drives (VFDs) Upgrade project at the Water Resource Recovery Facility (WRRF) in Wayne County, Michigan. The procurement involves replacing five existing low-voltage VFDs with new medium voltage VFDs, rewinding five existing 900 HP sewage pump motors to 1000 HP medium-voltage induction motors, and performing extensive electrical distribution system upgrades. Qualified contractors must demonstrate experience with medium voltage power systems, large horsepower motors, VFDs, transformer installations, and complex retrofit construction projects in wastewater facilities. The project requires a phased approach to minimize operational disruptions, maintaining N+1 power redundancy throughout the construction process, and limiting pump removal to no more than one unit at a time. Key procurement dates include mandatory site tours on July 28 and 29, 2025, with questions due by August 5, 2025, and final bids due on September 8, 2025, at 12:00 PM EST. The evaluation criteria will be 97% lowest cost/responsive/responsible and 3% economic equity, with an anticipated Notice to Proceed in January 2026 and substantial completion expected 72 months from NTP.

The solicitation includes a robust Business Inclusion and Diversity (B.I.D.) Program that provides economic equity credits for vendors meeting specific diversity criteria. Contractors can earn up to 3% additional scoring points for having a business presence in Michigan, being located in an economically disadvantaged service territory, or being in a GLWA service territory. Accepted diversity certifications include Disadvantaged Business Enterprise (DBE), Minority Business Enterprise (MBE), Woman Business Enterprise (WBE), and Small Business Enterprise (SBE). The project includes several provisional allowances totaling $2,515,000, covering items such as raceways ($200,000), structural testing ($25,000), integration services ($40,000), pump dynamics modifications ($250,000), and a $2,000,000 allowance for owner-authorized changes. Contractors must provide a 5% Bid Bond and 100% Performance and Payment Bonds, with the project requiring coordination with existing systems, including integration services from Emerson and Rockwell. Liquidated damages are specified at $4,500 per day for Substantial Completion and $2,250 per day for Final Completion, with the total project timeline extending to 75 months from the Notice to Proceed.

Opportunity text

The Great Lakes Water Authority (GLWA) request bids from construction companies ("Contractor") to provide Pump Station 2 Variable Frequency drives (VFDs) upgrade at the Water Resource Recovery Facility (WRRF). The project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades. Pump Station 2 receives its influent flow from the Oakwood Interceptor and North Interceptor East Arm (NIEA). It has two (2) wet wells with a total of five (5) sluice gates and five (5) stop logs to control the influent flow from its two (2) sources. Wet wells 1 and 2 receive their flow from the Oakwood Interceptor and NIEA, respectively. Pump Station 2 lifts this wastewater up to a level from which eight (8) centrifugal pumps can pump it out of the wet wells and it can flow by gravity through the screening facility. Five (5) of the eight (8) pumps are variable speed pumps with VFDs. The VFDs are used to control the flow of the wastewater to achieve the required amount of flow.

Files

Show all 18

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities