Public Water System Upgrade Project

Closed State & local contract opportunity Posted

Solicitation number
Fredericksburg Sewer & Water Authority, Lebanon County
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from pennbid.bonfirehub.com. Updated .

About this opportunity

The Fredericksburg Sewer & Water Authority is requesting sealed proposals for a Public Water System Upgrade Project comprising five prime contracts (pipeline construction, general construction, electrical, plumbing, and HVAC) with proposals due October 14, 2026 at 2:00 p.m. via PennBid, and a mandatory pre-bid meeting for certain contracts on September 16, 2026 at the project site (2529 State Route 22, Fredericksburg, PA 17026).

Contract No. 1 (Pipeline Construction) involves approximately 1,135 linear feet of 10-inch PVC, 6,570 linear feet of 8-inch PVC, 876 linear feet of 6-inch PVC, and 110 linear feet of 4-inch PVC water mains, including demolition or reconfiguration of existing mains at multiple locations and pipeline disinfection. Contract No. 2 (General Construction) encompasses construction of a 127-foot by 62-foot manganese filter building with four 96-inch GreenSandPlus filters, rehabilitation of existing office and garage buildings, installation of process equipment (Peerless turbine distribution pumps, Grundfos recycling pumps, chemical feed systems for sodium hypochlorite, hydrofluorosilicic acid, and ortho-polyphosphate), sludge wasting and backwash equipment, modifications at Well 6 and water storage tanks, and process piping. Contract No. 3 (Electrical Construction) covers electrical power supply and distribution, 150 kW standby generation with automatic transfer switch, conduits, wiring, and well pump control panels. Contracts No. 4 and 5 address plumbing and HVAC systems. The project is subject to Davis-Bacon prevailing wage requirements, Build America Buy America (BABA) compliance, American Iron and Steel (AIS) requirements, and E-Verify compliance under the Public Works Employment Verification Act.

Each proposal requires a 10 percent bid bond or bank cashier's check. Contract 1 uses unit pricing; Contracts 2–5 require lump-sum bids. Addendum 1, issued September 18, 2026, revised the questions deadline to October 5 at 4:00 p.m. and the bid deadline to October 14 at 2:00 p.m., added mandatory BABA and AIS compliance language, and made the pre-bid meeting mandatory for Contracts 2 and 3. Substantial completion is due within 365 days; final completion within 395 days from Notice to Proceed, with liquidated damages of $500 per day. The project is funded through PENNVEST. No incumbent is identified. All bidding documents are available at no cost on PennBid.

Opportunity text

Sealed proposals will be received electronically via the PennBid program by the Fredericksburg Sewer & Water Authority for the Public Water System Upgrade Project until 2:00 p.m. prevailing time on Monday, October 5, 2026. The bid results will be posted on PennBid shortly thereafter. All bidding documents and specifications are available at no cost on PennBid: https://pennbid.bonfirehub.com Each proposal must be accompanied by a bank cashier's check or bid bond (in the required form) for ten percent (10%) of the bid total. The work shall generally be comprised of five (5) prime contracts as follows: Contract No. 1 - Pipeline Construction: The work of this contract generally consists of the construction of approximately 1,135 LF of 10-inch, 6,570 LF of 8-inch, and 876 LF of 6-inch PVC water mains, demolition or reconfiguration of water mains at multiple locations, disinfection of pipelines, and other incidental work as indicated in the Contract Documents. Contract No. 2 - General Construction: The work of this contract generally consists of the construction of a manganese filter building, rehabilitation of the existing office building and garage, physical installation of all process equipment, chemical feed equipment, sludge wasting equipment, water recycling equipment, backwash equipment, physical modifications at Well 6, equipment modifications at the water storage tanks, process piping, chemical spill drain piping, and other incidental work as indicated in the Contract Documents. The General Contractor shall be responsible for developing and coordinating the overall project work schedule among all prime and subcontractors, as well as arranging and managing periodic job progress meetings, as deemed necessary. Contract No. 3 - Electrical Construction: The work of this contract generally consists of furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring for all process and other powered equipment provided under all other contracts, electrical upgrade of Well 6, installation of well controls at new wells 7 & 8, electrical installation of a mixer in the West Water Tower, demolition of the electrical service to the existing mixers in both water towers, and other incidental work as indicated in the Contract Documents. Contract No. 4 - Plumbing Construction: The work of this contract generally consists of furnishing and installing domestic cold and hot water supply piping, fixtures, accessories, point-of-use water heaters, sanitary waste and vent piping, and other incidental work as indicated in the Contract Documents. Contract No. 5 - HVAC Construction: The work of this contract generally consists of furnishing and installing heating and ventilation equipment in the proposed filter and refurbished office buildings, including air conditioning and heating units, compressor, electric unit heaters, gas unit heaters, propane tank and piping, and other related incidental work as indicated in the Contract Documents. Individual descriptions of the work for each contract and bid item are set forth in the bid documents. A pre-bid conference will be held at 9:00 a.m. on Wednesday, September 16, 2026, at the project site (2529 State Route 22, Fredericksburg, PA 17026). The pre-bid conference shall be mandatory for any bidder that submits a bid for Contract No. 2 - General Construction only. Bidders for other contracts are encouraged to attend but are not required to. Questions shall be submitted via the "Public Q & A" feature within PennBid. Bidders are advised that this project is subject to the Davis-Bacon Act and applicable Davis-Bacon Related Acts. The successful bidders and all subcontractors shall pay laborers and mechanics employed on the project not less than the prevailing wage rates and fringe benefits contained in the applicable U.S. Department of Labor wage determination included in the Contract Documents. Contractors shall comply with the labor standards and requirements of 29 CFR Parts 1, 3, and 5, including weekly certified payroll requirements. The Fredericksburg Sewer & Water Authority hereby reserves the right, which is understood and agreed to by all bidders, to reject any and all bids and to waive any omissions, errors, mistakes, defects, or irregularities in any bid at its sole discretion.

Files

File Type Posted
800 SERIES PLOTS - Plumbing Plan Set (Bid Set).pdf PDF
55-800 SERIES PLOTS - Plumbing Plan Set (Addendum 1).pdf PDF
752 - GES Well 7 Control Panel.pdf PDF
1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 1).pdf PDF
17-654 - HT Mech Dwgs - Piping Layouts.pdf PDF
654 - HT Mech Dwgs - Piping Layouts.pdf PDF
32-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf PDF
43-Bid Manual Section 8 - Dutchland Specifications (Addendum 1).pdf PDF
22-652 - HT Mech Dwgs - Piping Valves.pdf PDF
300 SERIES PLOTS - Water Piping Plans (Addendum 1).pdf PDF
656 - HT Mech Dwgs - Tanks Piping Blowers.pdf PDF
21-653 - HT Filter Control Panel.pdf PDF
71-Pre-Bid Meeting Minutes.pdf PDF
19-651 - HT Mech Dwgs - Internals.pdf PDF
64-700 SERIES PLOTS - Electrical Plan Set (Addendum 1).pdf PDF
63-251 - WWTP Contract 2 As-Built Plans (Addendum 1).pdf PDF
500 SERIES PLOTS - South Wells Plan (Addendum 1).pdf PDF
70-Pre-Bid Meeting Agenda.pdf PDF
200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 1).pdf PDF
69-300 SERIES PLOTS - Water Piping Plans (Addendum 1).pdf PDF
3-Bid Manual Section 1 - Front End Specifications.pdf PDF
754 - GES Manganese FIlter Control Panel (Addendum 1).pdf PDF
900 SERIES PLOTS - HVAC Plan Set (Addendum 1).pdf PDF
8-Bid Manual Section 5 - Construction Specifications A.pdf PDF
34-Bid Manual Table of Contents (Addendum 1).pdf PDF
6-Bid Manual Section 4 - General Specifications.pdf PDF
251 - WWTP Contract 2 As-Built Plans (Addendum 1).pdf PDF
25-753 - GES Well 8 Control Panel.pdf PDF
7-Bid Manual Section 6 - Construction Specifications B.pdf PDF
652 - HT Mech Dwgs - Piping Valves (Addendum 1).pdf PDF
35-Bid Manual Section 2 - Bid Forms (Addendum 1).pdf PDF
36-Bid Manual Section 1 - Front End Specifications (Addendum 1).pdf PDF
751 - GES Well 6 Control Panel.pdf PDF
20-655 - HT OIT Screens.pdf PDF
38-Bid Manual Section 9 - Mechanical HVAC Plumbing Specifications (Addendum 1).pdf PDF
31-800 SERIES PLOTS - Plumbing Plan Set (Bid Set).pdf PDF
900 SERIES PLOTS - HVAC Plan Set (Bid Set).pdf PDF
400 SERIES PLOTS - North Wells Plans (Bid Set).pdf PDF
753 - GES Well 8 Control Panel (Addendum 1).pdf PDF
653 - HT Filter Control Panel (Addendum 1).pdf PDF
30-900 SERIES PLOTS - HVAC Plan Set (Bid Set).pdf PDF
46-252 - WWTP Contract 3 As-Built Plans (Addendum 1).pdf PDF
62-754 - GES Manganese FIlter Control Panel (Addendum 1).pdf PDF
655 - HT OIT Screens (Addendum 1).pdf PDF
60-400 SERIES PLOTS - North Wells Plans (Addendum 1).pdf PDF
27-755 - GES Distribution Pump Control Panel.pdf PDF
10-Bid Manual Section 8 - Dutchland Specifications.pdf PDF
Bid Manual Section 1 - Front End Specifications (Addendum 1).pdf PDF
50-756 - GES Sludge Pump Control Panel (Addendum 1).pdf PDF
654 - HT Mech Dwgs - Piping Layouts (Addendum 1).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity