2-Bid Manual Section 7 - Process Equipment Specifications.pdf

PDF 1 MB Posted

Attached to
Public Water System Upgrade Project
Solicitation number
Not on record
Issued by
Lehigh County, Pennsylvania

About this file

This file contains technical specifications for the Public Water System Upgrade Project issued by the Fredericksburg Sewer & Water Authority in Pennsylvania. The project encompasses multiple specification sections detailing equipment, materials, and installation requirements for a comprehensive water treatment facility upgrade. The primary focus includes green sand filtration systems (four vertical pressure filters rated at 200 GPM each with a combined system capacity of 600 GPM), chemical addition equipment for sodium hypochlorite, hydrofluorosilicic acid, and ortho-polyphosphate feed systems, process piping and valves using various materials including stainless steel, ductile iron, and PVC, plant instrumentation including magnetic flowmeters and chlorine analyzers, and laboratory cabinets and workbenches. The specifications establish detailed requirements for filter tank construction (96-inch O.D. welded steel vessels meeting ASME Code Section VIII), filtration media consisting of GreensandPlus and anthracite with specific gradation requirements, chemical metering pumps (Stenner S420 Series peristaltic pumps with variable-speed controls), and various piping systems with specific pressure ratings and joint construction methods. Equipment delivery is required within 180 calendar days from contract award, with liquidated damages of $5,000 per day for non-compliance.

The specifications require single-source responsibility from manufacturers and suppliers to ensure coordinated system operation, with pre-qualification of equipment manufacturers required fifteen days prior to bid opening. All equipment must comply with relevant ASTM, AWWA, ASME, and NSF standards, with manufacturers demonstrating minimum experience requirements and providing comprehensive shop drawings, operation and maintenance manuals, and field testing documentation. Hydrostatic pressure testing of piping systems is mandated at 150 psi or 50 percent above normal working pressure, with specific leakage allowances and alignment requirements before backfilling. The project includes provision for manufacturer's technical support during installation, media loading, system conditioning, and commissioning, with factory-trained technicians providing specified days of on-site supervision. Spare parts and special tools must be provided for all chemical metering pump models, and all equipment warranties extend for a minimum of one year from project acceptance and startup.

View the file

Other files

File Type Posted
29-700 SERIES PLOTS - Electrical Plan Set (Bid Set).pdf PDF
30-900 SERIES PLOTS - HVAC Plan Set (Bid Set).pdf PDF
600 SERIES PLOTS - Treatment Building Plans (Addendum 1).pdf PDF
17-654 - HT Mech Dwgs - Piping Layouts.pdf PDF
13-400 SERIES PLOTS - North Wells Plans (Bid Set).pdf PDF
755 - GES Distribution Pump Control Panel (Addendum 1).pdf PDF
25-753 - GES Well 8 Control Panel.pdf PDF
65-653 - HT Filter Control Panel (Addendum 1).pdf PDF
51-100 SERIES PLOTS - Process Plans (Addendum 1).pdf PDF
61-500 SERIES PLOTS - South Wells Plan (Addendum 1).pdf PDF
72-Pre-Bid Meeting Sign-In Sheet.pdf PDF
49-900 SERIES PLOTS - HVAC Plan Set (Addendum 1).pdf PDF
400 SERIES PLOTS - North Wells Plans (Bid Set).pdf PDF
300 SERIES PLOTS - Water Piping Plans (Bid Set).pdf PDF
700 SERIES PLOTS - Electrical Plan Set (Addendum 1).pdf PDF
800 SERIES PLOTS - Plumbing Plan Set (Bid Set).pdf PDF
200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 1).pdf PDF
26-752 - GES Well 7 Control Panel.pdf PDF
3-Bid Manual Section 1 - Front End Specifications.pdf PDF
60-400 SERIES PLOTS - North Wells Plans (Addendum 1).pdf PDF
21-653 - HT Filter Control Panel.pdf PDF
44-Bid Manual Section 4 - General Specifications (Addendum 1).pdf PDF
15-300 SERIES PLOTS - Water Piping Plans (Bid Set).pdf PDF
16-200 SERIES PLOTS - Ex Building and Site Improvements (Bid Set).pdf PDF
751 - GES Well 6 Control Panel.pdf PDF
64-700 SERIES PLOTS - Electrical Plan Set (Addendum 1).pdf PDF
52-752 - GES Well 7 Control Panel (Addendum 1).pdf PDF
500 SERIES PLOTS - South Wells Plan (Bid Set).pdf PDF
70-Pre-Bid Meeting Agenda.pdf PDF
50-756 - GES Sludge Pump Control Panel (Addendum 1).pdf PDF
300 SERIES PLOTS - Water Piping Plans (Addendum 1).pdf PDF
27-755 - GES Distribution Pump Control Panel.pdf PDF
653 - HT Filter Control Panel (Addendum 1).pdf PDF
68-200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 1).pdf PDF
653 - HT Filter Control Panel.pdf PDF
1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf PDF
20-655 - HT OIT Screens.pdf PDF
66-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 1).pdf PDF
651 - HT Mech Dwgs - Internals.pdf PDF
32-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf PDF
1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 1).pdf PDF
251 - WWTP Contract 2 As-Built Plans (Addendum 1).pdf PDF
654 - HT Mech Dwgs - Piping Layouts.pdf PDF
Addendum 1.pdf PDF
46-252 - WWTP Contract 3 As-Built Plans (Addendum 1).pdf PDF
67-652 - HT Mech Dwgs - Piping Valves (Addendum 1).pdf PDF
651 - HT Mech Dwgs - Internals (Addendum 1).pdf PDF
22-652 - HT Mech Dwgs - Piping Valves.pdf PDF
12-600 SERIES PLOTS - Treatment Building Plans (Bid Set).pdf PDF
11-100 SERIES PLOTS - Process Plans (Bid Set).pdf PDF
Show 40 more

Latest 50 of 119 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division 11 - Equipment Section 11000 – Common Requirements for Process Equipment

FSWA 11000-1

Public Water System Upgrades

DIVISION 11 – EQUIPMENT

SECTION 11000 – COMMON REQUIREMENTS FOR PROCESS EQUIPMENT

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications, apply to this Section.

B. Related Sections

1. Division 1 Sections as referenced.

2. Division 11 Sections as referenced.

1.2 SUMMARY

A. This Section includes common requirements for equipment specified in individual Sections of Division 11-Equipment.

1.3 SUBMITTALS

A. Product Data: Make submissions in accordance with Section 01300. Submit Product Data applicable to items listed under Submittals in each Section of Division 11, and such items as may be scheduled on the Drawings.

B. Shop Drawings: Make submissions in accordance with Section 01300. Submit shop drawings applicable to items listed under Submittals in each Section of Division 11, and such items as may be scheduled on the Drawings.

C. Operation and Maintenance (O&M) Manuals: Make submissions in accordance with Section 01300. Submit O&M Manuals, as prepared by the manufacturers or the Contractor, for the items listed under O&M Manuals in each Section of Division 11.

1.4 QUALITY ASSURANCE

A. Component Standards: All equipment and materials furnished shall be new and shall bear manufacturer’s name and trade name. Equipment shall be manufacturer by a manufacturer regularly engaged in the production of the equipment specified, and shall be the manufacturer’s latest approved design.

B. Requirements of Regulatory Agencies: Comply with construction requirements of State, County, and such other local political subdivision specifications as may exceed the requirements of the codes, standards, and approving bodies referenced herein.

C. Electrical Requirements: Comply with requirements for both the Underwriters’

Laboratories, Inc. (UL) Listings, Labels and Certifications and the National Electrical Manufacturers’ Associations (NEMA) Stamps or Seals as applicable to electrical equipment or apparatus forming parts of the Equipment.

FSWA 11000-2

Public Water System Upgrades

1. Provide Electrical Control panels constructed in accordance with the practices and requirements of the Underwriters’ Laboratories, or other nationally recognized certification agency, with the appropriate certification label installed.

D. Equipment Compatibility: Where like items of equipment are incorporated into manufactured units or equipment systems (i.e. three pumps) such items shall be identical.

E. Specification Compliance: Manufacturers of equipment specified in individual

Sections of Division 11 shall be completely responsible for providing equipment which fully satisfies the intent of the Specifications including mechanical and electrical integrity, materials quality, and functional requirements established in the Specification Sections.

1.5 DELIVERY, STORAGE AND HANDLING

A. Deliver, store and handle equipment according to Section 01600. In addition, unless specified otherwise in the individual Specification Sections of Division 11, deliver, store and handle products according to the following:

1. Delivery:

a. Deliver equipment crating and packaging shall clearly identify pick points or lift points. In the absence of crating or packaging, pick points or lift points shall be identified on the equipment.

b. When transporting materials, equipment and machinery both on site and from Contractor’s storage to the Site, do so in accordance manufacturer’s recommendations.

2. Unloading:

a. When unloading materials and equipment, provide special lifting harness or apparatus as may be required by manufacturers.

Handle materials and equipment according to manufacturer’s instructions.

b. Contractor shall determine the required equipment needed for unloading operations and have such equipment on Site to perform unloading work on the date of equipment delivery.

3. Storage: Store materials, equipment and machinery, both on and off Site, according to manufacturer’s recommendations.

PART 2 – PRODUCTS

Not Used

PART 3 – EXECUTION

3.1 EXAMINATION

FSWA 11000-3

Public Water System Upgrades

A. Examine substrates and conditions for compliance with requirements for installation tolerances and other conditions affecting performance.

B. Examine rough-in of piping systems to verify locations of piping connections before equipment installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. General Requirements:

1. Install equipment with skilled mechanical erection labor according to manufacturer’s instructions and installation drawings.

2. Install equipment level, plumb and properly aligned.

3. Check motor and control panel data plates to compatibility to service voltage.

4. Check tightness of all fasteners.

5. Verify proper installation of supports and anchors for equipment and piping.

6. Grout bases as recommended by equipment manufacturer.

3.3 FIELD QUALITY CONTROL

A. Acceptance (Field) Tests: Upon Completion of the installation and adjustment of the equipment in a manner satisfactory to the Engineer, the Contractor with his own forces (including such equipment and other experts as may be necessary) shall place equipment in satisfactory operation and perform the Acceptance Tests.

1. Give the Owner at least seven days written notice prior to placing equipment in operation and designate the day for the Acceptance Tests.

2. Have on hand for the Engineer’s use during the Acceptance Tests, the complete test procedures and the installation acceptance certificate, as prepared by the manufacturer.

3. If during the demonstrations deficiencies are found, then subsequent to correction of the deficiencies by the Contractor, the Acceptance Test shall be repeated.

4. The Acceptance test shall be considered concluded at the end of the time period designated for the Test if the Engineer is satisfied with the test results.

5. During the Acceptance Test time, the Contractor’s Personnel shall instruct and train the Owner’s Personnel in the operation and maintenance of the equipment. Training shall include, but not be limited to, the following:

a. Start-up and shut-down procedures.

b. Equipment adjustments.

c. Troubleshooting.

d. Review of the equipment Installation, Operation, and Maintenance

Manual. This portion of the training is to include classroom

FSWA 11000-4

Public Water System Upgrades instruction, along with detailed discussions of the components and subsystems equipment.

e. Supervision of Owner operating personnel during total system operation.

f. Preventive maintenance scheduling and procedures.

B. Operating Costs: Include in the Bid Price the costs for lubricating grease, lubricating oils, and other materials and apparatus not specifically identified herein, but required to conduct the Acceptance Tests.

1. Electrical Power: The Owner will provide the electrical power for conducting the Acceptance Test through the permanent electrical service as installed to the equipment.

3.4 MANUFACTURER’S REPRESENTATIVE

A. Provide services of manufacturer’s authorized representative as indicated in the individual Sections of Division 11.

B. Provide written certification upon request from Engineer indicating names of authorized representatives.

END OF SECTION 11000

Division 11 – Equipment Section 11010 – Process Piping, Valves, and Appurtenances

FSWA 11010-1

SECTION 11010 – PROCESS PIPING, VALVES, AND APPURTENANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes piping and related components, valves, and appurtenances for Process Piping and Chemical Feed Systems.

B. Related Sections

1. Division 11 – Equipment

C. Piping, valves and specialties specified in this Section cover those Products not furnished as part of equipment systems specified in the individual Sections of Division 11 –Equipment.

1.3 REFERENCES

A. ASTM A74 – Standard Specification for Cast Iron Soil Pipe and Fittings.

B. ASTM C564 – Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings.

C. ASTM D1785 – Standard Specification for Poly Vinyl Chloride (PVC) Plastic Pipe, Schedules 40, 80 and 120.

D. ASTM D2241 – Standard Specification for Poly Vinyl Chloride (PVC) Plastic Pipe

(SDR-PR).

E. ASTM D2729 – Standard Specification for Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings.

F. ASTM D2855 – Standard Practice for Making Solvent-Cemented Joints with Poly Vinyl Chloride (PVC) Pipe and Fittings.

G. ASTM D3033 – Standard Specification for Type PSP Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings.

H. ASTM D3034 – Standard Specification for Type PSM Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings.

FSWA 11010-2

I. ASTM F477 – Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe.

J. AWWA C105 – Polyethylene Encasement for Ductile Iron Piping for Water and Other Liquids.

K. AWWA C110 – Ductile Iron and Gray Iron Fittings 3 in. through 48 in., for Water and Other Liquids.

L. AWWA C111 – Rubber-Gasket Joints for Ductile Iron and Gray Iron Pressure Pipe and Fittings.

M. AWWA C151 – Ductile Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined Molds, for Water or Other Liquids.

N. AWWA C500 – Gate Valves for Water and Sewerage Systems.

O. AWWA C504 – Rubber-Seated Butterfly Valves.

P. AWWA C507 – Ball Valves, 6 in. through 48 in.

Q. AWWA C508 – Swing-Check Valves for Waterworks Service, 2 in. through 24 in.

NPS.

R. AWWA C509 – Resilient-Seated Gate Valves for Water Supply Service.

S. AWWA C550 – Protective Epoxy Interior Coatings for Valves and Hydrants.

T. AWWA C601 – Standard Methods for the Examination of Water and Waste Water.

U. CISPI 301 – Cast Iron Soil Pipe and Fittings for Hubless Cast Iron Sanitary Systems.

1.4 QUALITY ASSURANCE

A. Pipe: Manufacturer’s name and class of pipe marked on the pipe. Manufacturer’s certification on manufacturing and testing.

B. Welding Materials and Procedures: Conform to ASME Code and applicable state labor regulations.

C. Welder’s Certification: In accordance with ANSI/ASME Section 9 or ANSI/ASME D1.1.

1.5 SUBMITTALS

A. Product Data: For each type of product indicated.

1. Include rating data, flow rates, pressure classifications, capacities, and other data specified in this Section.

FSWA 11010-3

2. Include materials, seats, trim, connections, arrangement, and other details of construction specified in this Section.

3. Include dimensions and arrangement, of each product.

B. Field quality-control test reports.

1. Include results of leakage tests.

C. Operation and Maintenance Data:

1. Provide for products requiring installation instructions, operating instructions, setup, calibration, or initial adjustment.

2. Provide for products requiring periodic inspection, calibration, or adjustment; or for products with replaceable components, wear items, or spare parts.

3. Provide for electrically operated products.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Preparation for Transport: Prepare items according to the following:

1. Ensure that items are dry and internally protected against rust and corrosion.

2. Protect against damage to threaded ends and flange faces.

3. Set valves in best position for handling. Set valves closed to prevent rattling.

B. During Storage: Use precautions for valves according to the following:

1. Do not remove end protectors unless necessary for inspection; then reinstall for storage.

2. Protect products from weather. Store indoors and maintain temperature higher than ambient dew-point temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is necessary.

C. Handling: Use sling to handle valves if size requires handling by crane or lift. Rig valves to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

D. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.

E. Protect stored products from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside.

F. Protect flanges, fittings, and specialties from moisture and dirt.

G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.

PART 2 - PRODUCTS

FSWA 11010-4

2.1 STAINLESS STEEL PIPE AND FITTINGS

A. Pipe 1/2” through 2-1/2”: 304L stainless steel manufactured to ASTM A-312, Schedule 40.

B. Pipe 3” and up: 304L stainless steel manufactured to ASTM A-778, Schedule 40.

C. Fittings 1/2” through 2-1/2”: 304 stainless steel, threaded, ASTM A-312, 150 lb.

D. Fittings 3” and up: 304 stainless steel, butt welded, ASTM A-778, 150 lb.

2.2 BLACK STEEL PIPE AND FITTINGS

A. ASTM A53, Schedule 40 up to 12-inch diameter; 0.375” nominal wall thickness for pipe 12” diameter and larger.

B. Joints 2” diameter and smaller shall be screwed. Joints 2-1/2” diameter and larger shall be flanged.

C. Fittings 2” diameter and smaller shall be ANSI 125 pound screwed in accordance with ASTM B16.4. Fittings 2-1/2” diameter and larger shall be flanged.

2.3 GALVANIZED STEEL PIPE

A. ASTM A120, Schedule 40 Galvanized Steel.

B. Fittings and Joints 1/2” through 2-1/2”: threaded.

C. Fitting and Joints 3” and up: Butt welded.

2.4 DUCTILE-IRON PIPE AND FITTINGS

A. Mechanical-Joint, Ductile-Iron Pipe (Below Grade): AWWA C151, ANSI A21.10 and ANSI A21.11, with mechanical-joint bell and plain spigot end. Provide with standard asphaltic coating and double cement lining with seal coat.

1. Mechanical-Joint, Ductile-Iron Fittings: AWWA C110, ANSI A21.10 and

ANSI A21.11, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern.

2. Glands, Gaskets, and Bolts: AWWA C111 and ANSI A21.11, ductile- or gray-iron glands, rubber gaskets, and steel bolts.

B. Push-on-Joint, Ductile-Iron Pipe (Below Grade): AWWA C151 and ANSI A21.11, with push-on-joint bell and plain spigot end. Provide with standard asphaltic coating and double cement lining with seal coat.

1. Push-on-Joint, Ductile-Iron Fittings: AWWA C110 and ANSI A21.11, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern.

2. Gaskets: AWWA C111, rubber.

FSWA 11010-5

C. Flanged, Ductile-Iron Pipe (Above Grade, Inside Buildings and Structures):

AWWA C151, with flanged ends. Provide with standard asphaltic coating and double dement lining with seal coat.

1. Flanged, Ductile Iron Fittings: AWWA C110, ductile iron standard pattern.

Flanges conforming to ASME B16.1, class 125.

2. Gaskets: AWWA C110 and AWWA C111, full face.

3. Bolts: ANSI B18.2.2, low carbon steel conforming to ASTM A307, hex head.

D. Piping designated to carry air shall not receive the double cement interior lining.

E. Force mains shall be lined with Sewper Coat by Griffin Pipe, or Protecto 401 Ceramic Epoxy by US Pipe and Foundry Co. or equal.

2.5 PE PRESSURE PIPE

A. Polyethylene pipe shall be manufactured in accordance with AWWA C901 for sizes ½-inch through 3” and in accordance with AWWA C906 for sizes 4” through 54”.

B. Polyethylene fittings shall be made from material meeting same requirements as pipe. Polyethylene fittings shall be molded or fabricated by the manufacturer of pipe.

C. Molded fittings shall be manufactured in accordance with either ASTM D2683 (socket fused) or ASTM 3261 (butt fused) and shall be so marked.

2.6 POLYVINYL CHLORIDE (PVC) GRAVITY PIPE AND FITTINGS

A. Pipe: Type PSM SDR 35, ASTM D 3034 (4” – 15”).

B. Fittings: Conforming to same applicable standards as pipe.

C. Joints: ASTM D3212 push on joint with ASTM F477 elastomeric gaskets. Gasket shall be locked in groove of bell to prevent displacement when pipes are joined.

2.7 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE AND FITTINGS

A. PVC, Schedule 80 Pipe: ASTM D 1784 and D 1785.

1. PVC, Schedule 80 Socket Fittings: ASTM D 2467.

B. Solvent Cements for Joining Plastic Piping:

1. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.

2.8 PVC PRESSURE PIPE AND FITTINGS – SDR 21

A. Pipe: ASTM D2241, SDR-21, Class 200, NSF 14 certified.

FSWA 11010-6

B. Fittings: Conforming to same applicable specifications as pipe.

C. Joints: ASTM D3139 push on joints with ASTM F477 elastomeric gasket. Gaskets shall be locked in groove of bell to prevent displacement when pipes are joined.

2.9 COPPER TUBING AND FITTINGS

A. Underground

1. Tubing: ASTM B88 Type K annealed.

2. Joints: Compression.

3. Fittings: Cast copper alloy compression tube fittings.

B. Above Grade

1. Tubing: ASTM B88 Type L, drawn tempered.

2. Joints: Solder

3. Fittings:

a. Wrought copper or bronze solder joints, ANSI B16.22

b. Cast bronze solder joint fittings ANSI B16.18

4. Solder: ASTM B32 alloy grade 95TA. Use flux recommended by solder manufacturer.

2.10 BLOWER/AIR PIPE AND FITTINGS

A. Underground

1. Ductile Iron Pipe, ANSI A21.51, minimum class thickness Class 52, unlined, uncoated and unpainted on interior of pipe.

2. Joints: Mechanical and Push-On Joints, ANSI A21.11

3. Fittings: Mechanical Joint, ANSI A21.10 and ANSI A21.11, unlined, uncoated and unpainted on interior of fitting.

B. Above Grade

1. Stainless Steel Pipe, ASTM A312, 10 Gauge, welded and seamless, Type

304L stainless steel.

2. Joints: Butt weld

3. Fittings: ASTM A403, butt weld.

2.11 CHEMICAL TUBING

A. Flexible, reinforced, clear Nylon tubing. Rated for 150 psi @ 70 degrees F.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. “Nylobrade” by Newage Industries

2. STI Flow

3. Flo-Products

4. Indelco Plastics

5. Or Equal

FSWA 11010-7

2.12 FABRICATED PIPE SUPPORTS

A. Adjustable Saddle Supports

1. Galvanized Steel construction, with base plate drilled for anchor bolts, steel pipe stand, threaded adjusting mechanism, and saddle to hold pipe.

2. For plastic pipe, provide with metal shields to prevent point loads on the piping.

3. Where Pipe Supports are installed on sloped floors, provide shims and grout under base plate to make support vertical.

B. Pipe Rack and Trapeze Systems

1. Standard galvanized steel framing channels, threaded rods, and associated fittings and hardware as detailed on the Drawings.

2. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Cooper “B-Line

b. Uni-Strut

c. Power Strut

d. Or Equal

C. Other Supports

1. Provide wall clips, steel bands, or other standard products at intervals consistent with manufacturer’s recommendations and applicable regulations.

2. Secure plastic piping with appropriate supports to prevent point loading, pinching, binding, or abrasion against other work. Provide supports as required to permit operation of valves without causing movement in the adjacent piping.

3. General Contractor shall be responsible to provide all necessary vibration control measures.

2.13 PIPING SPECIALTIES

A. Flexible Pipe Couplings: Ductile Iron sleeve, glands, and follower rings. 304 Stainless steel nuts and bolts. Resilient wedge-shaped gaskets of synthetic base compound designed for wastewater and sludge service.

1. Manufacturers

a. Dresser Manufacturing Division of Dresser Industrial, Inc.; Dresser Style 253.

b. Smith-Blair; Style 441

c. Or Equal

B. Flanged Adapters: For joining plain end pipe to flanged fittings, valves and pumps.

1. Manufacturers

a. Dresser Manufacturing Division of Dresser Industrial, Inc.; Dresser Style 127

b. Smith Blair Style 912

c. Or Equal

FSWA 11010-8

2. ASTM A-126, Class B cast iron. Flanges shall mate with standard ANS/AWWA C207/B16.1 and B16.5 flanges of same nominal size.

C. Quick Couplers: Equivalent to EverTite 800 Series, stainless steel construction.

Provide adapters, dust cap and stainless steel chain.

D. Expansion and Vibration Isolation Joints

1. Spool type with single filled arch and integral flanges

2. Non-metallic reinforced neoprene.

3. Galvanized split steel retaining rings

4. Control rod assembly.

5. Manufacturers

a. Mercer Rubber Company

b. General Rubber Company

c. Proco Products, Inc.

d. Or Equal

E. Pipe Wall and Floor Sleeves: Schedule 20 black steel pipe with a 2” wide intermediate anchoring flange of 3/16” steel midway on pipe sleeve, or provide sleeve product similar to wall sleeves manufactured by Trumbull Industries, Inc.

1. Size sleeves two pipe sizes larger than pipe passing through, or size sleeves for a minimum of 1/2” clearance between inside of sleeve and outside diameter of pipe passing through.

2. Wall and partition sleeve length shall be equal to the total thickness of the wall or partition and shall terminate flush with finished surfaces.

3. Floor sleeve lengths shall be equal to the total depth of floor construction, including finish, and shall extend a minimum of 1” and a maximum of 2” above floor level.

F. Pipe Wall Seals

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Advance Products & Systems, Inc.

b. Metraflex, Inc.

c. Pipeline Seal and Insulator, Inc.

d. Or Equal

2. For use at piping penetrations through concrete walls with or without the use of a metal sleeve. Description: Modular sealing element unit, designed for field assembly, used to fill annular space between pipe and opening.

3. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

4. Pressure Plates: Stainless steel.

5. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements.

2.14 HOSE BIBBS

A. Standard: ASME A112.18.1

FSWA 11010-9

B. Body Material: Bronze.

C. Seat: Bronze, replaceable.

D. Supply Connections: NPS 1” threaded inlet.

E. Outlet Connection: 1” Hose thread.

F. Pressure Rating: 125 psig

G. Finish: Rough bronze, or chrome or nickel plated.

H. Operation: Wheel handle.

2.15 VALVES, GENERAL

A. Refer to Part 3 "Valve Applications" Article for applications of valves.

B. Bronze Valves: NPS 3 and smaller with threaded ends, unless otherwise indicated.

C. Ferrous Valves: NPS 3 and larger with flanged ends, unless otherwise indicated.

D. Valve Pressure and Temperature Ratings: 150 psi CWP unless otherwise indicated.

E. Valve Sizes: Same as upstream pipe, unless otherwise indicated.

F. Valve Actuators: Unless specified otherwise

1. Handwheel: For valves other than quarter-turn types.

2. Lever Handle: For quarter-turn valves NPS 6 and smaller.

3. Motor or Pilot actuated: As specified with the particular valve.

G. Extended Valve Stems: As noted on Drawings.

H. Valve Flanges: ASME B16.1 for iron valves.

I. Threaded: With threads according to ASME B1.20.1.

2.16 PLUG VALVES

A. Manufacturers

1. DeZurik

2. M & H Valve Company

3. Milliken Valve Co., Inc.

4. Or Equal

B. General: Non lubricated eccentric type valves with resilient seated plugs rated for 175 psi working pressure for valves up to and including 12 inches, and 150 psi for valves 14 inches and larger. ANSI 125/150 lb standard end connections.

FSWA 11010-10

C. Valve Body: ASTM A126, Class B cast iron with a 1/8 inch welded overlay seat of not less than 90% nickel. Seat area shall be raised with surface completely covered with weld to insure that plug face contacts only nickel.

D. Plug: ASTM A126, Class B cast iron resilient face with neoprene or hycar, suitable for use with sewage. Interface between plug face and body seat with plug in closed position shall be externally adjustable in the field with the valve under pressure.

E. Bearings and Seats: Stainless steel bearings and nickel seats.

F. Port area shall be at least 80% of full pipe area.

G. Provide enclosed worm and gear operator for valves 8 inches and larger and for valves less than 8 inches that must be chain operated.

2.17 BUTTERFLY VALVES FOR WATER AND SEWAGE SERVICE

A. Designed for a minimum working pressure of 200 psi for valves thru 12 in. and 150 psi for valves 14 in. and larger.

B. Valves and operators shall conform to AWWA C504. Valves shall be of stainless steel to rubber seated tight closing type.

C. Body: Cast iron ASTM A126, Class B of short body design.

D. Disc: Cast iron ASTM A48, Class 40 securely attached to 18-8 Type 304 or Type 316 stainless steel one piece shaft with 18-8 Type 304 or Type 316 stainless steel pins.

E. Seat: Buna N (Hycar) rubber for sewage with 18-8 Type 304 or Type 316 stainless steel mating material.

F. Bearings: Self-lubricating Teflon.

G. Shaft Seals: Bronze cartridge with two (2) o-rings for valves through 24 in and split V-type packing for larger valves.

H. Operators: Designed and sized in accordance with AWWA C504.

I. Available Manufacturers:

1. DeZurik

2. Henry Pratt Company

3. Milliken

4. Or Equal

2.18 BUTTERFLY VALVES FOR AIR SERVICE

A. Body: Cast iron ASTM A126, Class B of short body design.

FSWA 11010-11

B. Disc: Aluminum bronze, ASTM B 148-953 attached to 18-8 Type 304 or Type 316 stainless steel one piece shaft with 18-8 Type 304 or Type 316 stainless steel pins.

C. Seat: EPDM with 18-8 Type 304 or Type 316 stainless steel mating material.

D. Bearings: Self lubricating Teflon.

E. Shaft Seals: Bronze cartridge with O-rings for valves through 24-inch.

F. Available Manufacturers

1. DeZurik

2. Henry Pratt Company

3. Milliken

4. Or Equal

G. Operators:

1. Manual operators shall be 10 position lever type which provides positive latching in the open, closed, and eight intermediate positions.

2.19 GATE VALVES

A. AWWA, Ductile Iron Body Gate Valves:

1. Manufacturers:

a. American Cast Iron Pipe Co.; American Flow Control Div.

b. Mueller Co.; Water Products Div.

c. U.S. Pipe and Foundry Company.

2. Nonrising-Stem, Resilient-Seated Gate Valves:

a. Description: ductile-iron body and bonnet; with bronze or ductile-iron gate, resilient seats, bronze stem, and handwheel.

1) Standard: AWWA C509.

2) Minimum Pressure Rating: 200 psig.

3) End Connections: Flanged.

4) Interior Coating: Complying with AWWA C550.

3. Valves smaller than 3 inches in diameter:

a. Solid bronze with tapered split wedge disc.

b. Physical properties of brass pressure containing parts shall conform to ASTM B62.

c. Acceptable Manufacturers

1) Crane Company

2) Wm. Powell Co.

3) Or equal

4. Hose End Type:

a. Bronze construction, tapered solid wedge disc, non-rising stem, female inlet and outlet having American Standard Taper Pipe thread.

b. Acceptable Manufacturers

1) Crane Company; No. 451 with cap and chain; 1 in. through

2-1/2 in.

2) Wm. Powell Co.; No. 502HS; 1/2 in. through 3 in.

3) Or equal

FSWA 11010-12

2.20 CHECK VALVES

A. Requirements

1. Provide full flow swing type check valve, with end type to match adjoining pipe, capable of passing a 3 inch spherical solid. A bronze body ring shall be threaded into the valve port. Valve clapper shall be cast iron, bronze face and shall swing completely clear of waterway when valve is full open.

Hinge pin shall be of 18-8 stainless steel construction and shall be utilized with bronze bushings and o-ring seals. Valves shall be equipped with a removable cover plate to permit entry or complete removal of internal components without removing the valve from the line. Valves shall be rated at 175 psi working pressure, 350 psi hydrostatic test pressure.

2. Valves 10 inches and larger shall be furnished with external lever and spring. Valves less than 10 inches shall be furnished with external lever and weight. Valves other than full flow type or valves mounted in such a manner that prevents the passage of a 3 inch spherical solid will not be acceptable.

3. Acceptable Manufacturers

a. Clow Corporation

b. M & H Valve Company

c. Mueller Company

d. Or equal

2.21 BALL VALVES

A. Manually operated PVC ball valves (3 inch and smaller)

1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Spears.

b. Hayward.

c. Koflo Corporation.

d. Or Equal

2. Threaded ends, full ported, union style with Teflon seats. Provide with PVC T-handle. Provide socket adaptors to connect to PVC piping.

B. Bronze Ball Valve

1. One piece bronze Body, threaded ends, brass ball, Teflon seats, operating handle. Minimum 150 psi rating.

a. Nibco

b. Stockham

c. Apollo

d. Milwaukee

e. Or Equal

2.22 PRESSURE REDUCING VALVE

A. Designed for at least 200 psi maximum inlet pressure with a maximum allowable outlet pressure 10 percent above spring setting or 5 psig whichever is greater.

FSWA 11010-13

B. Provide bronze trimmed valve with a nitrile or 3/16 inch cloth insert neoprene rubber diaphragm.

C. Valves Less Than 1 Inch Diameter: Bronze body; cast iron or aluminum spring chamber.

D. Valves 1 Inch in Diameter and Larger: Bronze body; cast iron spring chamber.

E. Available Manufacturers:

1. Fisher Controls; Type 75A Water Pressure Regulator

2. Union Flonetics Corp.; Series U-1 Spring Loaded Pressure Reducing

Regulator.

3. Or Equal

PART 3 - EXECUTION

3.1 EARTHWORK

A. Perform trenching, backfilling and compaction according to Section 02300.

3.2 PIPING APPLICATIONS

A. Drawings indicate piping types to be used.

B. Do not use flanges or unions for underground piping.

C. Flanges, unions, and special fittings may be used, instead of joints indicated, on aboveground piping and piping in vaults.

3.3 VALVE APPLICATIONS

A. Drawings indicate valve types to be used.

3.4 PIPING INSTALLATION

A. Clean piping prior to installation and following installation to prepare for painting.

Keep open ends of piping and pipe attachment openings on equipment capped or plugged until actual connection.

B. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

C. Install piping at indicated slopes.

D. Install piping free of sags and bends with supports as indicated, or as recommended by the piping manufacturers.

FSWA 11010-14

E. Sleeves are not required for core-drilled holes.

F. Install sleeves for pipes passing through concrete walls.

G. Install ductile-iron, piping according to AWWA C600 and AWWA M41.

H. Install underground piping with restrained joints at horizontal and vertical changes in direction. Use restrained-joint piping, thrust blocks, anchors, as indicated on the Drawings, or as recommended by the piping manufacturer.

3.5 JOINT CONSTRUCTION

A. Join pipe and fittings according to the following requirements.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

D. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.

E. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.

2. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and

PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.

F. Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212.

3.6 VALVE INSTALLATION

A. AWWA Gate Valves: Comply with AWWA C600 and AWWA M44. Install each underground valve with stem pointing up and with valve box.

B. AWWA Valves Other Than Gate Valves: Comply with AWWA C600 and

AWWA M44.

C. MSS Valves: Install as component of connected piping system.

FSWA 11010-15

3.7 FIELD QUALITY CONTROL

A. Mechanical-Component Testing: After piping connections have been made, test all operators, and components to assure proper operation. Adjust or replace components that do not operate correctly.

B. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Conduct piping tests as specified in this Section.

3.8 TESTING OF NON-PRESSURE LINES

A. General Requirements: Conduct tests specified herein so that each pipe line installed in the Project is tested to the Engineer’s satisfaction.

1. Provide tools, materials (including water), apparatus and instruments necessary for pipe line testing.

2. Conduct tests in the presence of and to the satisfaction of the Engineer.

B. Leakage Tests:

1. Air Testing: The Contractor shall test linesusing low pressure air. Testing shall not be performed, until all backfilling has been completed. The Contractor may, at his option, test the section of sewer for his own purposes, prior to completion of backfilling; however, the requirements of this subsection shall not be deemed to be completed until the lines have been tested after the backfilling has been completed and trench settlement has been minimized.

2. A minimum of two minutes shall be provided to allow equilibrium of the air temperature with pipe wall before test readings shall commence. The rate of air loss shall be determined by measuring the time interval required for the average internal pressure to decrease by 1.0 psig.

3. The initial test pressure to be developed in the line shall be determined as follows:

a. For depths six (6) feet or less, the internal pressure shall not be less than 6.0 psig.

b. For depths greater than six (6) feet, the internal pressure in psig shall be calculated as the sum of 3.5 plus the maximum height in feet divided by 2.3 between the invert of the sewer and the existing ground surface in the section of sewer to be tested. (For example, if the maximum height is determined to be 9.2 feet, the added pressure would be 4.0 psig. The initial test pressure in the sewer would then be 7.5 psig. The allowable drop would be to 6.5 psig within the time indicated elsewhere in this subsection.)

c. In no case shall the test pressure in the sewers or laterals be greater than the maximum internal differential joint pressure recommended by the manufacturer of the pipe.

4. The pipe shall be considered acceptable if the air loss rate does not exceed

0.0030 cubic feet per minute per square foot of internal pipe surface when tested at the initial pressure previously defined in this subsection. The time for the air pressure to decrease 1.0 psig shall not be less than the time indicated in the following table:

FSWA 11010-16

Pipe Diameter Minutes Seconds

6" 2 55 8" 3 57 10" 4 43

12" 5 5 15" 7 5 18" 8 30 21" 9 50 24" 11 20 27 12 45 30" 14 10 36" 17 00 42" 19 50 48" 22 40

5. If the above rates of leakage are exceeded, the Contractor shall determine source of leakage and make all necessary corrections and retest.

6. The Contractor shall submit to the Engineer for approval the detailed test procedure and list of test equipment he proposes to use prior to testing.

C. Infiltration:

1. After the air testing described in the preceding paragraph has been completed by the Contractor, regardless of any indications of the test results made by the Engineer or the Owner, the Engineer and the Owner reserve the right to perform field investigations, prior to final written acceptance of each sewer run by the Owner and/or during the maintenance period specified elsewhere in these Specifications, to establish the leakage of groundwater into the sewer and laterals constructed under this contract.

2. Should the leakage exceed 100 gallons per day per inch diameter per mile of pipe for any section, the Contractor shall, at the direction of the Engineer or Owner, and at no cost to the Owner, perform any additional testing or corrective work required to reduce the infiltration in each manhole run from those lines installed by the Contractor to less than 100 gallons per day per inch diameter per mile of pipe. This leakage applies to each manhole run separately and should not be construed to mean total leakage in the total system. The scope of this corrective work shall include, but not be limited to, cleaning, televising and testing the sewer and laterals to the limits installed by the Contractor, to include testing and grouting of joints, excavation and replacement of faulty or damaged portions of the work, and all final restoration.

3.9 TESTING OF PRESSURE LINES

A. Hydrostatic Testing for Pressure Lines:

1. Leakage Test Requirements:

a. After the pipe has been installed as specified, all newly laid pipe, or any valved section thereof, shall be subjected to a pressure of 150

FSWA 11010-17

pounds per square inch, or 50% in excess of the normal working pressure, whichever is greater.

b. Leakage is defined as the quantity of water to be supplied into the newly laid pipe, or any valved section thereof, necessary to maintain the specified leakage test pressure after the pipe has been filled with water and the air expelled.

c. No pipe installation will be accepted until the leakage is less than the number of gallons per hour as determined by the formula, L = N x D x SQ RT of P in which "L" equals the allowable leakage in gallons per hour; "N" is the number of joints in the length of pipelines tested; "D" is the nominal diameter of the pipe, in inches, and "P" is the average test pressure during the leakage test, in pounds per square inch gauge.

(The allowable leakage according to the formula is equivalent to

11.6 gallons per 24 hours per mile of pipe per inch nominal diameter, for pipe in 18' lengths evaluated on a pressure basis of 150 psi.)

2. Duration of Test: The duration of the test under pressure shall be two hours.

3. Procedure: Each valved section shall be slowly filled with water and the specified test pressure, based on the elevation of the lowest point of the line or section under test and corrected to the elevation of the test gauge, shall be applied by means of a pump connected to the pipe in a manner satisfactory to Engineer. The pump, pipe connections, and all necessary apparatus, including gauges, shall be furnished by Contractor. Contractor will make all taps into the pipe, and furnish all necessary assistance for conducting the tests.

4. Expelling Air Before Test: Before applying the specified test pressure, all air shall be expelled from the pipe. If hydrants or blowoffs are not available at high places, Contractor shall make the necessary taps at points of highest elevation before the test is made and insert the plugs after the test has been completed, at no additional cost to Owner.

5. Variation from Permissible Leakage: Should any test of pipe laid disclose leakage greater than that specified above, Contractor shall, at his own expense, locate, repair and replace the defective joints, pipe or fittings until the leakage is within the specified allowance.

6. Time for Making Test:

a. Where any section of a main is provided with concrete reaction backing, the hydrostatic pressure test shall not be made until at least five days have elapsed after the concrete reaction backing was installed. If high early strength cement is used in the concrete reaction backing, the hydrostatic pressure test shall not be made until at least two days have elapsed.

b. Engineer shall be present during the operating of valves required to fill mains for pressure and leakage test.

c. Contractor shall advise Engineer of any pressure test and leakage test at least 48 hours in advance. No testing will be authorized unless air temperature is 35 degrees or higher.

d. The pressure and leakage tests shall be witnessed by Engineer.

FSWA 11010-18

e. Contractor shall furnish laboratory calibrated test gauges and measuring devices for the leakage test.

f. The section under test shall be brought back to test pressure at one-half hour intervals during the testing. Engineer will record both the makeup water amount and pressure at each one-half hour repressurization.

B. Alignment Test for Pressure Lines:

1. Prior to backfilling of pressure lines, the joint alignment shall be inspected to assure the maximum deflection present in each joint does not exceed the manufacturer's recommendations.

2. Pressure lines which are a portion of a pump discharge system shall be inspected to assure the line is installed at a constant or increasing grade so as to eliminate the possibility for air accumulation at an intermediate high point.

3. Any and all defects shall be corrected by Contractor at no additional cost to Owner and to the satisfaction of Engineer prior to backfilling. This shall be completed before the work shall proceed and before acceptance of and/or payment shall be made.

C. Acceptance: Observation of successful testing of manholes, sewers or force mains by the Engineer does not constitute acceptance of the system or any portion thereof. Upon completion of any determined portion of a total system, and successful testing thereof, the Engineer may recommend final acceptance to the Owner. Only upon final inspection by the Owner or Engineer, and upon written acceptance for same will the system or portion thereof be considered substantially completed. Upon such acceptance, the warranty period as specified for the manholes, sewers or force main will commence.

1. If, during this final inspection, any irregularities are observed, the condition must be corrected at the Contractor's expense prior to acceptance.

3.10 IDENTIFICATION

A. Install continuous underground detectable warning tape during backfilling of trench for underground piping. Locate below finished grade, directly over piping.

3.11 DISINFECTION OF POTABLE WATER MAINS

A. Disinfect potable water lines following installation according to AWWA C651.

END OF SECTION 11010

Section 11226 – Green Sand Filtration System

FSWA 11226-1

DIVISION 11 - EQUIPMENT

SECTION 11226 – GREEN SAND FILTRATION SYSTEM

1.01 DESCRIPTION:

A. This section of the specifications provides for an automatic pressure type filtration system complete and operable as indicated on the drawings and as specified herein.

B. The following items shall be included in this section and are to be furnished by the water treatment equipment manufacturer:

1. Filter Tanks

2. Inlet Distributor/Waste Collectors

3. Supplemental Air wash distributors

4. Gravel Retaining Screen Assemblies

5. Underdrain Distributors

6. Support Gravel

7. Filtration Media

8. Automatic and Manual valves

9. Filter System Piping / Filter Air Piping

10. System Accessories

11. Pressure Equipment

12. Flow Equipment

13. Air Blowers

14. Filter System Control Panel

15. Filtration System Skid Mounting and Shop Assembly

C. All interconnecting wiring and conduit, motor starters, and appurtenant electrical work associated with the filtration system shall be furnished and installed by the Electrical Contractor in accordance with the specifications of Division 16 - Electrical.

1.02 REQUIREMENTS:

A. The Water Treatment Facility was designed based on GreensandPlus filtration equipment as manufactured by Hungerford and Terry, Inc.

B. It is the intention of these specifications that the pressure filter specified in this section shall be furnished as part of a coordinated system supplied by a single manufacturer so that undivided responsibility for a complete and operable system is assured. The pressure filter manufacturer shall be the

FSWA 11226-2

coordinating supplier of the pressure filter system. The pressure filter system shall include the pressure filters and all other equipment and accessories specified herein.

C. The Basis of Bid design is four (4) skid mounted, pre-plumbed, pre-wired filtration units. A maximum of three (3) units shall be active at any time with the fourth unit in standby or backwash mode.

D. Pre-Qualification Requirement

1. The following equipment manufacturer is pre-qualified to bid under this Section:

a. Hungerford & Terry, Inc.

2. The bidder shall prepare his Bid on the basis of the materials and equipment listed herein. Any Bid using other than the specified Base Bid equipment will be considered non-responsive and the Bid will not be considered for award. Approved alternates will be considered after award of the project has been made.

3. Bidders may apply for pre-qualification of alternate equipment manufacturers by providing the following information to the Engineer fifteen (15) days prior to the opening of bids:

a. Description of the equipment proposed.

b. Detailed drawings, specifications, and product literature with adequate detail showing the proposed equipment layout and construction materials as required for determining that the proposed alternate equipment will meet the requirements set forth in the specifications.

c. List of fifteen (15) operational installations in the State of

Pennsylvania with contact names, addresses, and phone numbers of similar installations. “Similar Installations” are defined as municipal pressure filtration systems for drinking water applications that have a total capacity equal to or greater than that specified herein.

d. Alternate equipment manufacturers shall provide a report of site-specific pilot testing to verify the basis of design of their proposed alternate system before the bid date.

e. Sufficient information to show compliance with these

FSWA 11226-3

specifications.

f. Evidence of technical capability to design and check out the complete alternate system; including modifications which will be required in structures, foundations, and existing and peripheral equipment provided by others.

g. Evidence of adequate financial resources to complete the project, assume liability for the equipment warranty, and furnish critical replacement parts over the lifetime of the alternate equipment.

h. A complete listing of changes which will be required in the contract Plans and Specifications to accommodate the alternate equipment.

i. Installation, operation and maintenance manuals specific to the proposed equipment

4. Any exceptions to these specifications shall be so noted in the pre-qualification submittal and reasons shall be given in writing for each exception.

5. Engineer shall, five (5) days prior to opening bids, issue an addenda listing Suppliers that are prequalified to provide equipment. Only bids from bidders offering the equipment from pre-qualified Suppliers shall be considered for an award of contract.

Other bids shall be returned without further consideration.

6. Alternate system manufacturers shall guarantee, in writing, signed by an officer of the company that the equipment offered will provide comparable or superior features, performance, quality, and materials of construction as defined in the specifications.

7. The prior approval of equipment for Alternate Bids shall not constitute final approval of the specific equipment, but rather constitutes acceptance of the respective equipment manufacturers to provide price quotations based on equipment meeting the Specifications. Shop submittals will be required as specified herein. Approval of alternate equipment does not guarantee approval of submittals. Alternate Bids will only be considered after the award of the project.

8. Contractor shall assume overall undivided responsibility for the functioning of the Alternate Bid equipment. The cost of any

FSWA 11226-4

changes incidental to the installation of the alternate equipment such as electrical wiring, relocation of piping, engineering design or supervision, as-built drawings etc., shall be borne by the Contractor with no additional cost to the Owner.

9. The manufacturer of the water treatment equipment whether or not named in these specifications, must comply with the experience and qualification requirements set forth herein.

1.03 SUBMITTALS:

A. The filtration equipment supplier shall submit to the Engineer four (4) complete sets of shop drawings, details, data sheets, and other descriptive drawings and material as may be required to fully describe the equipment proposed and to verify compliance with the contract documents.

B. All submittals shall be complete, neat, and orderly. The submittals shall include the following, as applicable:

1. Custom, CAD generated shop drawings pertinent to this specific application showing interconnections of the components in the system, including scaled double line piping drawings (schematics will not be acceptable), control ladder logic diagrams, electrical wiring diagrams, control panel drawings to include front panel view, internal wiring detail, and panel internal arrangements, control panel equipment charts, equipment arrangements, installation and erection details, anchor bolts, equipment pads, etc.

2. Detailed descriptions of each piece of equipment specified.

3. Description of the operation and control of the equipment along with a annotated copy of the as-built control logic program.

4. Four (4) copies of operation and maintenance requirements for the system.

1.04 PERFORMANCE, DESIGN, AND DELIVERY REQUIREMENTS:

A. The filtration system shall be specifically designed to provide filtration and treatment for iron and manganese removal from the raw well water. The filter media shall consist of 18 inches of Greensand Plus, 18 inches of Anthracite and 12 inches of graded gravel.

A sodium hypochlorite chemical feed system shall serve to catalytically regenerate the GreensandPlus.

B. Design requirements are as follows:

FSWA 11226-5

1. The pressure filter equipment shall be designed based on the following requirements:

a. System design flow rate 600 GPM

b. Unit design flow rate 200 GPM

c. Filter loading rate at design flow 3.9 GPM/FT2

d. Normal maximum operating pressure 100 PSI

e. Influent design water quality:

iron .138 ppm, avg.

manganese 1.32 ppm, avg.

2. The pressure filter backwash water source is to be filtered water back from storage.

Temperature of the backwash water will be approximately 55 degrees F.

a. Normal filter backwash rate...... 12 GPM/FT2 @ 55 deg. F.

C. Plant…