46-252 - WWTP Contract 3 As-Built Plans (Addendum 1).pdf

PDF 2 MB Posted

Attached to
Public Water System Upgrade Project
Solicitation number
Not on record
Issued by
Lehigh County, Pennsylvania

About this file

This is an Addendum 1 document for Contract No. 3 (Electrical Construction) of the Public Water System Upgrade Project, issued by the Fredericksburg Sewer & Water Authority in Pennsylvania. The addendum modifies the original contract specifications for electrical construction work, which includes furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring for all process systems, control and instrumentation systems, and related electrical infrastructure at the water treatment facility. The sealed proposal submission deadline is 2:00 p.m. prevailing time on Monday, October 5, 2026, via the PennBid electronic bidding program. All bidding documents and specifications are available at no cost through PennBid at https://pennbid.bonfirehub.com. Each proposal must be accompanied by a bank cashier's check or bid bond in the required form for ten percent (10%) of the bid total, with bid results to be posted on PennBid following the submission deadline.

The addendum provides modifications and clarifications to the Contract No. 3 specifications as part of the larger five-contract Public Water System Upgrade Project. Bidders are required to coordinate their electrical work with other prime contractors, including those responsible for pipeline construction (Contract No. 1) and general construction including the manganese filter building and equipment installation (Contract No. 2). The General Contractor under Contract No. 2 holds overall responsibility for developing and coordinating the project work schedule among all prime and subcontractors and managing periodic progress meetings as necessary. Specific pricing terms, set-asides, funding amounts, and other financial details related to Contract No. 3 are to be determined based on the complete bid specifications available through the PennBid platform.

View the file

Other files

File Type Posted
29-700 SERIES PLOTS - Electrical Plan Set (Bid Set).pdf PDF
2-Bid Manual Section 7 - Process Equipment Specifications.pdf PDF
30-900 SERIES PLOTS - HVAC Plan Set (Bid Set).pdf PDF
600 SERIES PLOTS - Treatment Building Plans (Addendum 1).pdf PDF
17-654 - HT Mech Dwgs - Piping Layouts.pdf PDF
13-400 SERIES PLOTS - North Wells Plans (Bid Set).pdf PDF
755 - GES Distribution Pump Control Panel (Addendum 1).pdf PDF
25-753 - GES Well 8 Control Panel.pdf PDF
65-653 - HT Filter Control Panel (Addendum 1).pdf PDF
51-100 SERIES PLOTS - Process Plans (Addendum 1).pdf PDF
61-500 SERIES PLOTS - South Wells Plan (Addendum 1).pdf PDF
72-Pre-Bid Meeting Sign-In Sheet.pdf PDF
49-900 SERIES PLOTS - HVAC Plan Set (Addendum 1).pdf PDF
400 SERIES PLOTS - North Wells Plans (Bid Set).pdf PDF
300 SERIES PLOTS - Water Piping Plans (Bid Set).pdf PDF
700 SERIES PLOTS - Electrical Plan Set (Addendum 1).pdf PDF
800 SERIES PLOTS - Plumbing Plan Set (Bid Set).pdf PDF
200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 1).pdf PDF
26-752 - GES Well 7 Control Panel.pdf PDF
3-Bid Manual Section 1 - Front End Specifications.pdf PDF
60-400 SERIES PLOTS - North Wells Plans (Addendum 1).pdf PDF
21-653 - HT Filter Control Panel.pdf PDF
44-Bid Manual Section 4 - General Specifications (Addendum 1).pdf PDF
15-300 SERIES PLOTS - Water Piping Plans (Bid Set).pdf PDF
16-200 SERIES PLOTS - Ex Building and Site Improvements (Bid Set).pdf PDF
751 - GES Well 6 Control Panel.pdf PDF
64-700 SERIES PLOTS - Electrical Plan Set (Addendum 1).pdf PDF
52-752 - GES Well 7 Control Panel (Addendum 1).pdf PDF
500 SERIES PLOTS - South Wells Plan (Bid Set).pdf PDF
70-Pre-Bid Meeting Agenda.pdf PDF
50-756 - GES Sludge Pump Control Panel (Addendum 1).pdf PDF
300 SERIES PLOTS - Water Piping Plans (Addendum 1).pdf PDF
27-755 - GES Distribution Pump Control Panel.pdf PDF
653 - HT Filter Control Panel (Addendum 1).pdf PDF
68-200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 1).pdf PDF
653 - HT Filter Control Panel.pdf PDF
1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf PDF
20-655 - HT OIT Screens.pdf PDF
66-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 1).pdf PDF
651 - HT Mech Dwgs - Internals.pdf PDF
32-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf PDF
1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 1).pdf PDF
251 - WWTP Contract 2 As-Built Plans (Addendum 1).pdf PDF
654 - HT Mech Dwgs - Piping Layouts.pdf PDF
Addendum 1.pdf PDF
67-652 - HT Mech Dwgs - Piping Valves (Addendum 1).pdf PDF
651 - HT Mech Dwgs - Internals (Addendum 1).pdf PDF
22-652 - HT Mech Dwgs - Piping Valves.pdf PDF
12-600 SERIES PLOTS - Treatment Building Plans (Bid Set).pdf PDF
11-100 SERIES PLOTS - Process Plans (Bid Set).pdf PDF
Show 40 more

Latest 50 of 119 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .