Public and Employee Parking Modification

Awarded State & local contract opportunity

Solicitation number
ITB 2025-0103
State
Florida
Responses due

Opportunity facts

Point of contact

Updated .

About this opportunity

The Melbourne Airport Authority (MAA) is soliciting bids for a comprehensive parking modification project at Melbourne Orlando International Airport under Solicitation Number ITB 2025-0103. The project involves constructing approximately 5,850 square yards of curbed asphalt pavement, including drainage, striping, and lighting modifications within Employee Parking Lot No. 3. Key deliverables include adding 119 public parking spaces and 20 employee parking spaces, with specific requirements for pavement demolition, tree removal (primarily cabbage palms), grading, storm drainage, electrical work, pavement marking, and landscaping. The project scope encompasses complete site preparation, including stripping turf, constructing pavement and curbs, installing area lighting, sodding with bahia grass, and erecting a low 3-foot open-frame fence to separate public and employee parking areas. The bid submission deadline is February 11, 2025, at 2:00 PM EST, with a pre-bid meeting held on January 9, 2025. Contractors were required to complete a comprehensive bid form with unit prices for multiple construction activities, and the project allows for an optional Cell Phone Lot pavement overlay bid.

The procurement does not specify explicit set-aside designations or restrictions for disadvantaged enterprises. Eight contractors submitted bids for the project, with base bid prices ranging from $846,471.05 to $2,136,296.07. The intended award went to W & J Construction for a total bid of $915,082.64, which includes the base bid of $849,458.64 and an optional overlay of $65,624.00. The project has a total budget of approximately $1,000,000, with substantial completion expected within 120 calendar days after the Notice to Proceed. Liquidated damages are set at $1,000 per day for delays. No specific incumbent vendors were mentioned, and the project does not require integration with existing parking control equipment. Bidders were required to provide a bid bond and will need to secure a Public Construction Bond upon award. The project is scheduled for final confirmation at the February 26, 2025 Board Meeting.

Opportunity text

This project will include, but not be limited to: construction of approximately 5,850 square yards of curbed asphalt pavement, along with drainage, striping, and lighting; and modifications within the existing Employee Parking Lot No. 3. The existing dry grass stormwater pond south of the parking area will be regraded as required for the added pavement. The parking modification will provide 119 additional public parking spaces and 20 additional employee parking spaces. The project will require pavement demolition, tree removal (mostly cabbage palms), stripping of turf, grading, storm drainage, pavement and curb construction, electrical (area lighting) work, pavement marking (striping), sodding with bahia, and installation of a low (3 ft.) open-frame fence type rail around the public parking area. The public and employee parking areas will be separated by curbed grass strips. No irrigation or ornamental plantings are included.