Addendum 3 is issued by the Melbourne Airport Authority for the Public and Employee Parking Modifications project (MAA 51224), dated February 4, 2025. The addendum maintains the original proposal submission date of Tuesday, February 11, 2025, at 2:00 PM EST and introduces a new bid option for a Cell Phone Lot Pavement Overlay. The project involves modifying parking areas at Melbourne Orlando International Airport, with bidders required to provide pricing for a base bid and an optional 2,600 square yard asphalt pavement overlay for the Cell Phone Lot. The "low bid" will be determined by considering either the base bid alone or the base bid plus the optional overlay, depending on the owner's selection.
The addendum addresses an insurance coverage question from a potential bidder, with the Melbourne Airport Authority affirming that current insurance coverages are dictated by Risk Management and cannot be modified. The current requirements include $2M occurrence for Auto & General Liability and a $5M Umbrella policy. The bid form includes multiple line items for various construction activities such as mobilization, erosion control, earthwork, pavement construction, drainage improvements, electrical work, and landscaping. Bidders must complete the comprehensive bid form, providing unit prices for each specified item, with a total bid calculated for both the base project and the optional Cell Phone Lot overlay.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 3/PAGE 1 OF 2
ADDENDUM 3
FOR
INVITATION FOR BIDS
For
Public and Employee Parking Modifications At
MELBOURNE ORLANDO INTERNATIONAL AIRPORT
MAA 51224
February 4, 2025
This addendum is issued as part of the Proposing Documents for the above-described project. The changes incorporated in this addendum shall be considered as a part of the documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original documents. The Proposer shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Proposer shall acknowledge receipt of this addendum in their Proposal Package by addendum number and date. Failure to do so may subject the Proposer to disqualification.
SENT VIA EMAIL – 6 PAGES TOTAL (including attachments)
________________________________________(NAME OF YOUR COMPANY)
NOTE:
PLEASE SIGN_______________________________AND RETURN THIS FIRST SHEET ONLY VIA
E-MAIL OR FAX to SANDRA ACEVEDO, sacevedo@mlbair.com or (321) 723-1194 Fax
THIS VERIFIES THAT YOU HAVE RECEIVED THE ADDENDUM.
GENERAL
1. THE PROPOSAL SUBMISSION DATE REMAINS TUESDAY, FEBRUARY 11, 2025, at 2:00
PM EST.
PROJECT MANUAL
1. See revised BID FORM to include BID OPTION #1: Cell Phone Lot Pavement Overlay. The “low bid” will be considered to be the lowest bid submitted by a qualified and responsive bidder, including the BASE BID plus OPTION #1 if the Owner elects to award OPTION #1, otherwise it will be the lowest qualified, responsive bid for the BASE BID only.
DRAWINGS
1. See sketch below: Provide alternate price to provide an estimated 2,600 SY of 1.5” overlay asphalt paving, including preparation and tack coat for the Cell Phone Lot as shown on the attached sketch.
about:blank
ADDENDUM 3/PAGE 2 OF 2
QUESTIONS AND RESPONSES:
1. CIF-009: We have conferred with our insurance company regarding the coverage limits on the insurance AIA document Exhibit "A". The stated coverage of $2M occurrence for Auto & General Liability and a $5M Umbrella that sits over both the auto and general liability seems to be excessive for this project. We have attached our certificate of insurance showing the coverage we typically carry. The limits shown are acceptable to all of the municipalities in the area. (We are currently working for the City of Melbourne, the City of Satellite Beach, the Town of Indian Harbour Beach, Brevard County and Indian River County). This may be standard for work done on airport property. If that is the case please let us know.
A suggestion from our insurance company is a $1M Auto and $1M General Liability – and have us increase only the Umbrella, Going from $1M Umbrella to $5M. Still an additional cost but less than increasing to the limits shown on Exhibit A. Secondly, are these coverages also required for all subcontractors working on the project? We did not see that discussed on Exhibit A
RESPONSE: Current insurance coverages are dictated by Risk Management for all current work performed on airport property. This cannot be changed. It is up to the General Contractor to determine the limits they will accept from their subcontractors.
END OF ADDENDUM #3
Issued by
Melbourne Airport Authority
MELBOURNE ORLANDO INTERNATIONAL AIRPORT
PUBLIC AND EMPLOYEE PARKING MODIFICATION BID FORM
INDEX
PAY
ITEM
DESCRIPTION UNIT QTY UNIT PRICE WRITTEN IN WORDS UNIT PRICE EXTENDED AMOUNT
1 101-1
MOBILIZATION AND
MAINTENANCE OF
TRAFFIC
LS 1
2 104-1
EROSION CONTROL
AND NPDES
COMPLIANCE
LS 1
3 110-1
TREE AND HEDGE
REMOVAL
LS 1
4 110-2
STRIPPING TURF AND
TOPSOIL
LS 1
5 110-3
DEMOLITION AND
PAVEMENT REMOVAL
LS 1
6 120-1
EARTHWORK AND
SUBGRADE
COMPACTION
LS 1
7 200-1
8" LIMEROCK BASE
COURSE (2 LIFTS),
PRIMED
SY 5,853
8 334-1
SUPERPAVE HMA
SURFACE, SP-9.5, 1½"
THK., INCL. TACK
SY 5,853
9 425-1
FDOT TYPE C INLET W/
GALV. TRAFFIC RATED
GRATE
EA 2
10 425-2
SAME AS 425-1,
INSTALLED IN-LINE
WITH EXIST. 18" RCP
LS 1
11 425-3 MODIFY EXIST INLET 1 LS 1
12 425-4 MODIFY EXIST INLET 2 LS 1
CONTRACTOR_____________________________________________
AIRPORT ENGINEERING CO., INC. BF-1 of 4
DECEMBER 2024
PUBLIC AND EMPLOYEE PARKING MODIFICATION
BID FORM (continued)
INDEX
PAY
ITEM
DESCRIPTION UNIT QTY UNIT PRICE WRITTEN IN WORDS UNIT PRICE EXTENDED AMOUNT
13 430-1 15" RCP CLASS 3 LF 94
14 430-2
CONCRETE SLAB FOR
15" MES
EA 2
15 430-3
REPAIR CONNECTION
OF 12" PVC TO 30x42
RCP, DETAIL SHT. 11
LS 1
16 520-1
TYPE D CONC CURB IN
EXIST. PAVEMENT
LF 610
17 520-2
TYPE D CONC CURB IN
NEW PAVED AREA
LF 1,795
18 522-1
CONC. SLAB FOR
FLUME AND WALKWAY
(SECT. K-K)
LS 1
19 522-2
CONC. CURB FLUME
EXTENSION
(SECT. L-L)
LS 1
20 522-3
CONC. CAP OVER PVC
PIPES (SECT. P-P)
LS 1
21 550-1 STEEL PIPE BARRIER LF 1,180
22 570-1
GRASSING BY SEED
AND MULCH (BAHIA)
AC 0.43
23 575-1 SODDING (BAHIA) SY 6,160
24 710-1
REMOVE 4" PAINTED
STRIPE BY GRINDING
LF 1,200
AIRPORT ENGINEERING CO., INC. BF-2 of 4
INDEX
PAY
ITEM
DESCRIPTION UNIT QTY UNIT PRICE WRITTEN IN WORDS UNIT PRICE EXTENDED AMOUNT
25 710-2
4" WHITE PAINTED
STRIPE (NEW)
LF 4,160
26 710-3
4" WHITE PAINTED
STRIPE (REPAINTED)
LF 660
27 715-1
ELECTRICAL WORK TO
REPLACE PB (FLAG
NOTE 25 SHT 9) WITH
PB IN ISLAND
LS 1
28 715-2
UNDERGROUND
ELECT. DISTRIBUTION
FOR NEW LIGHT
POLES, INCL. RELOC.
& MODIFIED SERVICE
POST
LS 1
29 715-3
NEW 200W. LED
FIXTURE ON UNUSED
HORN OF POLE-TOP
BRACKET
EA 5
30 715-4
NEW CONC POLE W/ 3 -
200W LED FIXTURES
EA 2
31 715-5
NEW CONC POLE W/ 2 -
200W LED FIXTURES
EA 3
32 800-1 4" PVC SLEEVE LF 143
33 A
ALL WORK NOT
INCLUDED IN OTHER
BID ITEMS
LS 1
TOTAL AMOUNT BASE BID
AIRPORT ENGINEERING CO., INC. BF-3 of 4
34 334-2
OPT. #1 SUPERPAVE
HMA SURFACE, SP-9.5,
1½" THK., INCL. SURFACE
PREPARATION & TACK,
FOR CELL PHONE LOT
SY 2,600
TOTAL AMOUNT BASE BID PLUS OPT. #1
AIRPORT ENGINEERING CO., INC. BF-4 of 4