Landfill monitoring well replacement

Closed State & local contract opportunity Posted

Solicitation number
BID-UD 26-01-0-2026/KW
State
California
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from demandstar.com. Updated .

About this opportunity

San Luis Obispo County is requesting bids on landfill groundwater monitoring well replacement work, with bids due August 21, 2026. The scope includes abandonment of one existing groundwater monitoring well and installation of two new groundwater monitoring wells at designated locations. Final well depths and screened intervals will be determined in the field by the Project Hydrogeologist based on observed subsurface conditions and in accordance with applicable California state and local regulations and approved work plans. The contractor must provide all necessary work plans, permits, and inspections.

The contract documents include technical drawings and extensive geotechnical reference materials spanning historical subsidence studies (1962–1964), soil and geological investigations, stability studies, and recent supplemental geotechnical reports (2021–2022) covering subsurface characterization, groundwater conditions, bearing capacities, seismic parameters, and expansion potential at and near the project site. Contractors should review these materials to understand site conditions and inform bid pricing and scheduling.

No estimated contract value, contract term, pre-bid meeting date, question deadline, or incumbent contractor information is specified in the posted solicitation materials. The source does not identify evaluation criteria, weighting factors, or any set-aside or preference program applicable to this procurement.

Opportunity text

The work shall include, but is not limited to, properly abandoning one existing groundwater well and the installation of two (2) new groundwater monitoring wells at locations designated by Technical Specifications. Final well depths and screened intervals will be determined in the field by the Project Hydrogeologist based on observed subsurface conditions in accordance with applicable State and local regulations, and approved work plans. Contractor to provide all necessary work plans, permits, and inspections necessary, all as shown on the plans and/or as specified herein.

Files

File Type Posted
26-633 Bid Package.pdf PDF
10-134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
15-134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
2-115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
5-134 WR Reservoir Outlet Works ERPT 35.pdf PDF
21-335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
25-633 Notice Inviting Bids.pdf PDF
16-342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
11-398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
19-134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
20-134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
9-114 Geotech.pdf PDF
24-633 Specifications.pdf PDF
18-333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
6-330 1991 Converse Consult. West Foundation Investigation....pdf PDF
7-134 1970 Special Stability Investigation ERPT 45.pdf PDF
13-603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
22-134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
1-412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
17-134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
23-633 Drawings.pdf PDF
12-342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
14-587 2021 Final Geotech Report.pdf PDF
4-134 1964 Subsidence Study.pdf PDF
8-342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
3-333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
Show all 26