10-134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf

PDF 6 MB Posted

Attached to
LANDFILL MONITORING WELL REPLACEMENT
Solicitation number
BID-UD 26-01-0-2026/KW
Issued by
San Luis Obispo County, California

About this file

This is a Basis for Design Report for a water resources reservoir project prepared by or for a California state or local government agency. The document outlines the foundational engineering and design parameters for the 1962 WR Reservoir, serving as the technical basis for planning and construction activities. The report establishes the hydrological, geological, and structural design criteria necessary for the project, including site-specific subsurface conditions, groundwater characteristics, and engineering specifications that will guide contractor performance and project execution. The report provides the technical framework upon which bid documents, construction specifications, and project implementation plans are developed.

The Basis for Design Report functions as a supporting technical document that informs the landfill monitoring well replacement contract opportunity, which requires the abandonment of one existing groundwater well and installation of two new monitoring wells at designated locations. The final well depths and screened intervals will be determined in the field by the Project Hydrogeologist based on subsurface conditions documented in reports such as this one, ensuring compliance with applicable California state and local regulations. The contractor is responsible for providing all necessary work plans, permits, inspections, and adherence to technical specifications derived from the design basis established in this report.

View the file

Other files

File Type Posted
25-633 Notice Inviting Bids.pdf PDF
19-134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
2-115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
22-134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
9-114 Geotech.pdf PDF
7-134 1970 Special Stability Investigation ERPT 45.pdf PDF
13-603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
1-412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
17-134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
23-633 Drawings.pdf PDF
14-587 2021 Final Geotech Report.pdf PDF
4-134 1964 Subsidence Study.pdf PDF
21-335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
26-633 Bid Package.pdf PDF
15-134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
5-134 WR Reservoir Outlet Works ERPT 35.pdf PDF
3-333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
8-342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
12-342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
16-342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
20-134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
11-398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
6-330 1991 Converse Consult. West Foundation Investigation....pdf PDF
18-333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
24-633 Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file