8-342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf

PDF 5 MB Posted

Attached to
LANDFILL MONITORING WELL REPLACEMENT
Solicitation number
BID-UD 26-01-0-2026/KW
Issued by
San Luis Obispo County, California

About this file

This is a supplemental exploration and standby generation building document for the Conejo Pumping Station prepared in June 1992, likely by a California water or utility agency. The document outlines exploration work and standby generation facility requirements for the Conejo Pumping Station. The scope includes supplemental site exploration activities necessary to support the design and development of a backup power generation building at the pumping station facility. Key deliverables include site investigation data, geological and hydrological findings, and engineering assessments to inform the standby generation building specifications and construction requirements.

The document provides technical specifications and engineering parameters for the proposed standby generation building project. It includes site conditions analysis, utility infrastructure requirements, and design considerations necessary for implementing backup power generation capabilities at the Conejo Pumping Station. The project appears to address operational resilience needs through the development of dedicated standby generation infrastructure, with all work to be performed in accordance with applicable California state and local regulations and approved work plans.

View the file

Other files

File Type Posted
25-633 Notice Inviting Bids.pdf PDF
19-134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
2-115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
22-134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
9-114 Geotech.pdf PDF
7-134 1970 Special Stability Investigation ERPT 45.pdf PDF
13-603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
1-412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
17-134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
23-633 Drawings.pdf PDF
14-587 2021 Final Geotech Report.pdf PDF
4-134 1964 Subsidence Study.pdf PDF
21-335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
26-633 Bid Package.pdf PDF
15-134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
10-134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
5-134 WR Reservoir Outlet Works ERPT 35.pdf PDF
3-333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
12-342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
16-342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
20-134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
11-398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
6-330 1991 Converse Consult. West Foundation Investigation....pdf PDF
18-333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
24-633 Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .