21-335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf

PDF 62 MB Posted

Attached to
LANDFILL MONITORING WELL REPLACEMENT
Solicitation number
BID-UD 26-01-0-2026/KW
Issued by
San Luis Obispo County, California

About this file

This is a Geotechnical Reconnaissance Report prepared in December 1991 for the 325R Geo Reconnaissance project related to a 4 MG Reservoir Pipe installation. The document appears to be a technical assessment document supporting subsurface characterization and site evaluation efforts. The report provides geological and hydrogeological data necessary for foundation design and construction planning of the reservoir pipe infrastructure. The reconnaissance work involved field investigation of subsurface conditions at the designated project site, with findings and recommendations documented to guide subsequent detailed design and construction phases.

The report contains technical findings from geological boring and soil testing programs conducted at the project location. It includes subsurface profile information, soil classification data, and geotechnical recommendations for the reservoir pipe installation project. This reconnaissance-level investigation established baseline subsurface conditions and identified any constraints or special considerations required for the planned construction activities. The document served as supporting technical documentation for permitting and design purposes, providing engineers and project managers with necessary subsurface information to proceed with the reservoir pipe project development.

View the file

Other files

File Type Posted
25-633 Notice Inviting Bids.pdf PDF
19-134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
2-115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
22-134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
9-114 Geotech.pdf PDF
7-134 1970 Special Stability Investigation ERPT 45.pdf PDF
13-603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
1-412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
17-134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
23-633 Drawings.pdf PDF
14-587 2021 Final Geotech Report.pdf PDF
4-134 1964 Subsidence Study.pdf PDF
26-633 Bid Package.pdf PDF
15-134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
10-134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
5-134 WR Reservoir Outlet Works ERPT 35.pdf PDF
3-333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
8-342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
12-342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
16-342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
20-134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
11-398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
6-330 1991 Converse Consult. West Foundation Investigation....pdf PDF
18-333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
24-633 Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .