22-134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf

PDF 98 MB Posted

Attached to
LANDFILL MONITORING WELL REPLACEMENT
Solicitation number
BID-UD 26-01-0-2026/KW
Issued by
San Luis Obispo County, California

About this file

This is a Design Engineering Report prepared for Lake Bard Reservoir, Water Resources Dam No. 1027, in California. The document provides technical analysis and engineering specifications for a water resources infrastructure project. The report outlines the design parameters, hydrological data, and engineering considerations necessary for the development or modification of the dam facility. The project scope encompasses comprehensive engineering design work including site assessment, hydraulic analysis, and structural design recommendations. The report serves as the foundational technical document supporting the state and local contract opportunity for landfill monitoring well replacement work in California, which requires the abandonment of one existing groundwater well and installation of two new groundwater monitoring wells at designated locations. The work is contingent upon field observations and subsurface conditions assessment by the Project Hydrogeologist, with final well depths and screened intervals to be determined accordingly in compliance with applicable state and local regulations.

The contractor is responsible for providing all necessary work plans, permits, and inspections required for the project execution. This comprehensive scope ensures that groundwater monitoring infrastructure meets regulatory standards and provides accurate environmental data collection capabilities. The design engineering report establishes the technical baseline and environmental context for the monitoring well installation work, supporting the overall water resources management and compliance objectives for the designated landfill site in California.

View the file

Other files

File Type Posted
25-633 Notice Inviting Bids.pdf PDF
19-134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
2-115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
9-114 Geotech.pdf PDF
7-134 1970 Special Stability Investigation ERPT 45.pdf PDF
13-603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
1-412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
17-134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
23-633 Drawings.pdf PDF
14-587 2021 Final Geotech Report.pdf PDF
4-134 1964 Subsidence Study.pdf PDF
21-335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
26-633 Bid Package.pdf PDF
15-134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
10-134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
5-134 WR Reservoir Outlet Works ERPT 35.pdf PDF
3-333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
8-342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
12-342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
16-342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
20-134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
11-398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
6-330 1991 Converse Consult. West Foundation Investigation....pdf PDF
18-333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
24-633 Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .