24-633 Specifications.pdf
PDF 3 MB Posted
- Attached to
- LANDFILL MONITORING WELL REPLACEMENT
- Solicitation number
- BID-UD 26-01-0-2026/KW
- Issued by
- San Luis Obispo County, California
About this file
Summary
This is a Notice Inviting Bids and Specifications document for Calleguas Municipal Water District in Thousand Oaks, California, for Project No. 633: Calleguas Water Campus Staff Housing Replacement. The project involves demolition of three existing manufactured homes and garages, design and construction of engineered foundation systems, purchase and installation of three new manufactured homes, construction of three detached two-car garages, construction of six covered decks, and connection to existing utility services including electrical, water, sewer, and communications. The mandatory pre-bid meeting and site visit is scheduled for July 30, 2026, at 10:00 a.m. at the District's office, with bids due electronically by 2:00 p.m. on August 18, 2026. Bidders must be licensed as Class C-47 General Manufactured Housing Contractors and must have completed at least five similar projects within the past five years. The successful bidder's Superintendent must have worked on at least three comparable projects, and the Project Manager must have managed at least two similar projects completed within the past ten years.
Bidders must submit bid security equal to at least 10% of the aggregate bid amount in the form of cash, certified check, cashier's check, or a bidder's bond with A.M. Best's rating of no less than A-:VII. The successful bidder must furnish faithful performance and payment bonds each in an amount of at least 100% of the total contract value and must obtain commercial general liability insurance with limits of not less than $5,000,000 per occurrence (or $3,000,000 for contracts under $1,000,000), plus workers' compensation and employer's liability insurance. The project is subject to California prevailing wage requirements, and all contractors and subcontractors must be registered with the Department of Industrial Relations. The contract is awarded to the lowest responsible bidder, with Calleguas reserving the right to reject any and all bids and to delay award up to 60 calendar days after bid opening. The successful bidder must execute the contract and provide all required bonds and insurance documentation within 15 calendar days of the award notice.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CMWD Specifications No. 633 Table of Contents Calleguas Water Campus Staff Housing Replacement Page TOC-1
TABLE OF CONTENTS
NOTICE INVITING BIDS Page No.
N-1 Bid Submittal and Opening .............................................................................................. N-1 N-2 Description of Work ......................................................................................................... N-1 N-3 Location of Work ............................................................................................................ N-2 N-4 Mandatory Pre-Bid Meeting and Site Visit ...................................................................... N-2 N-5 Contract Documents ......................................................................................................... N-2 N-6 Bid Security ...................................................................................................................... N-2 N-7 Performance Bond, Payment Bond and Warranty ........................................................... N-3 N-8 Prevailing Wages ............................................................................................................. N-3 N-9 Bidder’s Licenses and Experience ................................................................................... N-3 N-10 Fabricators’ and Manufacturers’ Experience ................................................................... N-4 N-11 Requests for Information or Clarification (RFI/RFC) ..................................................... N-4 N-12 Substitution of Securities ................................................................................................. N-4 N-13 Offensive Conduct ........................................................................................................... N-4 N-14 Calleguas’s Rights ............................................................................................................ N-5 N-15 Labor Compliance Program ............................................................................................. N-5
INSTRUCTIONS TO BIDDERS
I-1. Form of Bid ......................................................................................................................... I-1 I-2. Address and Marking of Bid Security ................................................................................ I-1 I-3. Execution of Bid ................................................................................................................. I-1 I-4. Local Conditions ................................................................................................................. I-2
1. Bidder’s Due Diligence ............................................................................................. I-2
2. Further Acknowledgments and Obligations of Bidder .............................................. I-3
I-5. Quantities ............................................................................................................................ I-3 I-6. Licenses .............................................................................................................................. I-3 I-7. Preparation of the Bid ......................................................................................................... I-3
1. General ....................................................................................................................... I-4
2. Requests for Information or Clarifications (RFI/RFC).............................................. I-4
3. Bid Schedule(s) .......................................................................................................... I-4
4. Bid Security ............................................................................................................... I-4
5. Information Required of Bidders ............................................................................... I-5
a. Names, Titles and Addresses ............................................................................ I-5
b. Performance of Comparable Work ................................................................... I-6
c. Subcontractors List ........................................................................................... I-6
6. Noncollusion Declaration .......................................................................................... I-6
7. Declaration of Compliance with CARB .................................................................... I-6
I-8. Withdrawal or Modification of Bid .................................................................................... I-7 I-9. Award of Contract - Selection of Lowest Responsible Bidder ........................................... I-7 I-10. Execution of Contract and Other Requirements of the Lowest Responsible Bidder .......... I-7 I-11. Bonds Required of Successful Bidder ................................................................................ I-9
1. Faithful Performance Bond ........................................................................................ I-9
2. Payment Bond ............................................................................................................ I-9
Staff Housing Replacement Page TOC-2
3. Naming of Surety .................................................................................................... ...I-9
4. Form of Bond and Required Surety Information ....................................................... I-9
I-12. Workers’ Compensation and Employer’s Liability Insurance Required of the Contractor…………………………………………………………………………….I-9 I-13 Liability Insurance Required of the Contractor……………………………………………I-10
1. General Liability…………………………………………………………………... I-10
2. Automobile Liability……………………………………………………………….I-12
3. Additional Requirements………………………………………………………… . I-12
I-14 Loss or Damage to the Work During the Course of Construction…………………………I-14
PROPOSAL
Bidder’s Declaration ........................................................................................................................ P-2 Bidder’s Bond .................................................................................................................................. P-5 Bid Schedule .................................................................................................................................... P-7 Information Required of the Bidder ................................................................................................ P-8 Declaration of Compliance with CARB ........................................................................................ P-11 Non-Collusion Declaration ............................................................................................................ P-13
AGREEMENT AND BONDS
Agreement ...................................................................................................................................... A-1 Bond for Faithful Performance ....................................................................................................... B-1 Payment Bond................................................................................................................................. B-3
SPECIFICATIONS - GENERAL CONDITIONS
1. Terms, Definitions and Preliminary Matters ......................................................................... GC-1
1.1. The Contract Documents Defined ................................................................................ GC-1
1.1.1. References to Specifications, Standards, and Codes .......................................... GC-1
1.1.2. Words with a Technical or Trade Meaning ........................................................ GC-1
1.2. Supplements or Modifications to the Contract Documents .......................................... GC-1
1.2.1. Request for Interpretation/Clarification ............................................................. GC-1
1.2.2. Clarifications ...................................................................................................... GC-2
1.2.3. Notices ................................................................................................................ GC-2
1.3. Contract Documents Complementary ........................................................................... GC-2
1.4. Order of Precedence ..................................................................................................... GC-2
1.4.1. Most Restrictive Requirements Apply ............................................................... GC-2
1.4.2. Dimensions ......................................................................................................... GC-2
1.4.3. Compliance Shall Not be Considered Extra Work ............................................ GC-2
1.5. The “Drawings” or “Plans” ........................................................................................... GC-2
1.5.1. Drawings May Not Represent Actual Conditions .............................................. GC-3
1.5.2. Ambiguity .......................................................................................................... GC-3
1.6. Right-of-Way ................................................................................................................ GC-3
1.6.1. Work Areas Furnished by Calleguas Shown in Contract Documents ............... GC-3
1.6.2. Contractor to Acquire Any Additional Work Areas .......................................... GC-3
1.6.3. Contractor Does Not Have Exclusive Use of Right-of-Way ............................. GC-3
Staff Housing Replacement Page TOC-3
1.6.3.1. Calleguas to Decide Which Contractor Shall Cease Work ........................... GC-3
1.6.3.2. Contractor Shall Not Unnecessarily Interfere with Other Contractors ......... GC-4
1.6.4. Contractor to Proceed with Work in Areas Where Right-of-Way has been Acquired .............................................................................................. GC-4
1.7. Definitions ..................................................................................................................... GC-4
1.8. Calleguas Personnel and Authority ............................................................................... GC-7
1.8.1. Board of Directors .............................................................................................. GC-7
1.8.2. Project Manager ................................................................................................. GC-7
1.8.3. Construction Inspector ....................................................................................... GC-7
1.8.4. Materials Inspector ............................................................................................. GC-7
1.8.5. Engineer ............................................................................................................. GC-7
1.8.6. Surveyors ............................................................................................................ GC-8
1.8.7. Other Persons ..................................................................................................... GC-8
1.8.8. Authority of Calleguas ....................................................................................... GC-8
1.9. Contractor’s Personnel and Authority ........................................................................... GC-8
1.9.1. Contractor’s Representatives ............................................................................. GC-8
1.9.1.1. Contractor’s Project Manager ...................................................................... GC-8
1.9.1.2. Contractor’s Superintendent ....................................................................... GC-8
1.9.2. Contractor’s Representative to Give Personal Attention ................................... GC-8
1.9.3. Replacement of Contractor’s Project Manager/Project Superintendent ............ GC-9
1.9.4. Notices to the Contractor ................................................................................... GC-9
1.9.4.1. Service by Mail ............................................................................................. GC-9
1.9.4.2. Personal Service or Service by Fax or E-mail ............................................... GC-9
1.9.4.3. Contractor's Phone and Fax Numbers and E-mail Address .......................... GC-9
1.9.4.4. One Hour Response Required for Emergencies ............................................ GC-9
1.10. Specification Language and Style ............................................................................. GC-10
2. Time and Order of the Work ............................................................................................... GC-10
2.1. Time Is of the Essence ................................................................................................ GC-10
2.1.1. Notice to Proceed is Authorization to Begin Work .......................................... GC-10
2.1.2. Contractor Responsible for Means and Methods .............................................. GC-10
2.1.3. Contractor Must Maintain the Required Progress ............................................. GC-10
2.2. Liquidated Damages - Failure to Complete on Time .................................................. GC-10
2.3. Delays .......................................................................................................................... GC-11
2.3.1. Delays in General .............................................................................................. GC-11
2.3.2. Timely Completion of the Work Required ....................................................... GC-11
2.3.3. No Payment or Extension of Time .................................................................... GC-11
2.3.4. Suspension of the Work by Calleguas .............................................................. GC-12
2.3.5. Suspension or Delay of the Work Due to Weather Conditions......................... GC-12
2.3.6. Suspension or Delay of the Work Due to Contractor’s Actions ....................... GC-13
2.3.7. Suspension of the Work for the Convenience or Benefit of Calleguas ............. GC-13
2.3.8. Delays Due to the Unreasonable Acts or Omission of Calleguas ..................... GC-13
2.3.9. Delays Due to Force Majeure ........................................................................... GC-14
2.3.10. Procedure to Apply for Extension of Time and/or Payment Due to Delay..... GC-14
2.3.10.1. Notice Required Within One Working Day .............................................. GC-14
2.3.10.2. Daily Work Reports Required to Recover Costs ....................................... GC-14
2.3.10.3. Time Extensions ........................................................................................ GC-15
2.3.10.4. Revised Schedule of Progress .................................................................... GC-15
3. Changes to the Work ........................................................................................................... GC-15
3.1. Changes by Calleguas .................................................................................................. GC-15
Staff Housing Replacement Page TOC-4
3.1.1. Field Orders ....................................................................................................... GC-16
3.1.2. Work Change Directives ................................................................................... GC-16
3.1.3. Change Orders ................................................................................................... GC-16
3.2. Procedure to Apply for Extension of Time and/or Payment for Changes to Work or Extra Work ............................................................................... GC-17
3.3. Payment for Increases and Decreases to Bid Item Quantities ..................................... GC-17
3.3.1. Decreases in Bid Item Quantities ...................................................................... GC-17
3.3.2. Increases in Bid Item Quantities ....................................................................... GC-17
3.4. Payment for Extra Work ............................................................................................ GC-18
3.4.1. Contractor to Perform Ordered Extra Work ...................................................... GC-18
3.4.2. Extra Work Must Be Ordered in Writing .......................................................... GC-18
3.4.3. Payment Normally to Be Agreed in Advance ................................................... GC-18
3.4.4. Option to Use Time and Materials .................................................................... GC-18
3.4.5. Work Comparable to Unit Price Items .............................................................. GC-18
3.4.6. Time and Materials Work ................................................................................. GC-18
3.4.7. Labor ................................................................................................................. GC-19
3.4.8. Materials ............................................................................................................ GC-20
3.4.9. Equipment ......................................................................................................... GC-20
3.4.9.1. Rental Rates to be All Inclusive .................................................................. GC-21
3.4.9.2. Operating Condition of Equipment ............................................................. GC-21
3.4.9.3. Manufacturer’s Ratings ............................................................................... GC-21
3.4.9.4. Small Tools ................................................................................................. GC-21
3.4.9.5. Inoperative Equipment ................................................................................ GC-21
3.4.9.6. Idle Equipment ............................................................................................ GC-21
3.4.9.7. Equipment Used on Extra Work ................................................................. GC-21
3.4.10. Contractor to Reach Agreement with Other Forces ........................................ GC-22
3.5. Credit for Deleted Work ............................................................................................... GC-22
3.6. Changes by the Contractor ........................................................................................... GC-22
3.6.1. Proposed “Or-Equal” Items ............................................................................... GC-22
3.6.2. Proposed Deviations .......................................................................................... GC-23
4. Materials and Workmanship ............................................................................................... GC-24
4.1. Access to Work ........................................................................................................... GC-24
4.2. Workmanship .............................................................................................................. GC-24
4.3. Materials ...................................................................................................................... GC-24
4.3.1. Materials to be New and Conforming ............................................................... GC-24
4.3.2. Materials Contacting Potable Water ................................................................. GC-25
4.3.3. Materials to Equal Accepted Samples ............................................................... GC-25
4.3.4. Orders Shall Carry Notation .............................................................................. GC-25
4.3.5. Materials Furnished by Calleguas ..................................................................... GC-25
4.3.6. Coordinated and Adequate Design .................................................................... GC-25
4.3.7. Care of the Work and Materials ........................................................................ GC-25
4.3.8. Damage or Loss - Acts of God ......................................................................... GC-26
4.4. Inspections and Tests .................................................................................................. GC-26
4.4.1. Readiness for Inspection ................................................................................... GC-26
4.4.2. Mill-Test Reports .............................................................................................. GC-26
4.4.3. Samples, Test Specimens, or Test Pieces .......................................................... GC-26
4.4.4. Right to Reject Articles and/or Materials .......................................................... GC-26
4.4.5. Replacement of Rejected Materials .................................................................. GC-27
4.4.6. Inspections at Fabrication Facilities… .............................................................. GC-27
Staff Housing Replacement Page TOC-5
4.4.6.1. All Materials and Equipment Subject to Factory Inspection ...................... GC-27
4.4.6.2. Scheduling of Inspections at Fabrication Facilities ..................................... GC-27
4.4.6.3. Safe Access to be Provided ......................................................................... GC-27
4.5. Examination of Work Done Without Inspection ......................................................... GC-27
4.6. Examination of Finished or Previously Accepted Work ............................................. GC-28
4.7. Defective Work or Materials ....................................................................................... GC-28
4.7.1. Contractor’s Payment Obligation ..................................................................... GC-28
4.7.2. Inspection by Calleguas Does Not Relieve the Contractor of Obligations ...... GC-28
4.7.3. Responsibility for Defective Materials ............................................................ GC-28
4.7.4. Rejected Materials ............................................................................................ GC-28
4.7.5. Failure to Make Ordered Repairs ..................................................................... GC-28
4.8. Acceptance of Work Not a Waiver ............................................................................. GC-29
4.9. Permit Compliance Inspections ................................................................................... GC-29
4.10. Salvage ....................................................................................................................... GC-29
5. Performance of the Work .................................................................................................... GC-29
5.1. Completion of the Work .............................................................................................. GC-29
5.1.1. Contractor to Complete the Work at Prices Fixed in Contract Documents ..... GC-29
5.1.2. Contractor to Furnish All Materials, Labor, and Services ............................... GC-29
5.2. Contractor to Furnish Information .............................................................................. GC-29
5.3. Contractor to Review Contract Documents ................................................................ GC-30
5.4. Changed Conditions .................................................................................................... GC-30
5.4.1. Risk of Unforeseen Obstructions or Difficulties is on Contractor ................... GC-30
5.4.2. Exception: Changed Conditions ...................................................................... GC-30
5.4.2.1. Calleguas to Investigate............................................................................... GC-30
5.4.2.2. Contractor to Proceed with the Work .......................................................... GC-31
5.4.2.3. HAZWOPER Training is not Extra Work .................................................. GC-31
5.4.2.4. Failure to Give Proper Written Notice Constitutes Waiver ........................ GC-31
5.5. Laws and Regulations ................................................................................................. GC-31
5.5.1. Contractor to Be Fully Informed ...................................................................... GC-31
5.5.2. Contractor to Comply with All Applicable Laws and Permit Requirements ... GC-31
5.5.3. Discrepancy or Inconsistency in Contract Documents .................................... GC-31
5.5.4. Incorporation of Mandatory Terms, Provisions, and Codes ............................ GC-31
5.5.5. Contractor to Pay Fines/Damages .................................................................... GC-32
5.6. Contamination and Pollution ....................................................................................... GC-32
5.7. Permits/Licenses/Taxes ............................................................................................... GC-32
5.8. Hazardous Materials and Hazardous Waste ................................................................ GC-32
5.8.1. Hazardous Substance, Hazardous Waste, or Asbestos-Related Work ............. GC-32
5.8.2. Hazardous Material .......................................................................................... GC-32
5.8.3. Hazardous Waste .............................................................................................. GC-33
5.9. Contractor's Responsibility for Defense and Indemnification .................................... GC-33
5.9.1. Definitions ........................................................................................................ GC-33
5.9.2. Duty to Indemnify ............................................................................................ GC-33
5.9.3. Duty to Defend ................................................................................................. GC-34
5.9.4. Reimbursement Obligation .............................................................................. GC-34
5.9.5. Insurance Proceeds ........................................................................................... GC-34
5.9.6. Subcontractor’s Duties of Defense and Indemnity .......................................... GC-34
5.10. Trespass .................................................................................................................... GC-34
5.11. Patents and Copyrights ............................................................................................. GC-34
5.12. Subcontracts ............................................................................................................. GC-34
Staff Housing Replacement Page TOC-6
5.12.1. Subcontracts Permitted at Calleguas’ Discretion ............................................ GC-34
5.12.2. Public Contract Code Sections 4100 et seq. .................................................... GC-35
5.12.3. Subcontractor’s Failure to Comply with Contract Documents ....................... GC-35
5.12.4. Terms of Subcontract(s) to be Supplied to Calleguas Upon Demand ............ GC-35
5.13. Employment of Labor .............................................................................................. GC-35
5.13.1. Contractor to Comply with Labor Laws ......................................................... GC-35
5.13.2. Character of Workers ...................................................................................... GC-35
5.13.3. Convict Labor .................................................................................................. GC-36
5.13.4. Employment of Apprentices ........................................................................... GC-36
5.13.5. Labor Code Provisions to be Included in Contracts with Subcontractors ...... GC-36
5.14. Prevailing Wage Requirements ................................................................................. GC-36
5.15. Form of Payment ....................................................................................................... GC-37
5.16. Certified Payroll ........................................................................................................ GC-37
5.17. Overtime .................................................................................................................... GC-38
5.17.1. Overtime Work ................................................................................................ GC-38
5.17.2. Written Permission Required for Overtime and Shift Work as a Regular Procedure ........................................................................................... GC-38
5.17.3. Overtime Inspection Costs .............................................................................. GC-38
5.18. Enforcement of Order ............................................................................................... GC-38
5.19. General Safety and Protection .................................................................................. GC-38
5.19.1. Contractor Responsible for Safety and Protection .......................................... GC-38
5.19.2. Compliance with Safety Laws and Regulations .............................................. GC-39
5.19.3. Notification to Property Owners ..................................................................... GC-39
5.19.4. Contractor Liable for Damages, Injury, or Loss of Property .......................... GC-39
5.19.5. Duration of Contractor’s Responsibility for Safety ........................................ GC-39
5.19.6. Inadequate Methods, Tools, or Equipment ..................................................... GC-39
5.19.7. Sufficiency of Plant, Tools, Equipment, and Methods ................................... GC-39
5.20. Public Convenience and Safety ................................................................................ GC-40
5.20.1. General ............................................................................................................ GC-40
5.20.2. Signs, Barricades, Warnings, Etc. ................................................................... GC-40
5.20.3. Traffic Maintenance ........................................................................................ GC-40
5.20.4. Timing of Placement of Temporary Traffic Control Devices ......................... GC-40
5.21. Protection of Calleguas' Facilities ............................................................................. GC-40
5.22. Maintenance of Existing Improvements ................................................................... GC-41
5.22.1. Protection of Existing Improvements .............................................................. GC-41
5.22.2. Damage to Existing Improvements ................................................................. GC-41
5.22.3. Protection and Restoration of Existing Surface Features ................................ GC-41
5.22.4. Protection of Existing Calleguas Pipelines ..................................................... GC-41
5.22.5. Relocation of Improvements ........................................................................... GC-41
5.23. Maintenance of Other Rights-of-Way and Structures ............................................... GC-41
5.24. Protection of Existing Utilities and Structures .......................................................... GC-42
5.24.1. Some Information on Drawings ...................................................................... GC-42
5.24.2. Information on Drawings May Not Represent Current Conditions ................ GC-42
5.24.3. Contractor Responsible for Determining Subsurface Conditions ................... GC-42
5.24.4. Contractor to Comply with Underground Service Alert Laws ....................... GC-42
5.24.5. Caltrans, Railroads, and Other Nonmembers .................................................. GC-42
5.24.6. Utility Marking ................................................................................................ GC-42
5.24.7. Potholing ......................................................................................................... GC-43
5.24.8. Precise Alignment .......................................................................................... GC-43
Staff Housing Replacement Page TOC-7
5.24.9. Surveying ........................................................................................................ GC-43
5.24.10. Potholing Report ............................................................................................ GC-43
5.24.11. Use of Extreme Caution ................................................................................. GC-44
5.25. Interference with Fire Hydrants, Highways, and Fences .......................................... GC-44
5.26. Restoration of Streets, Roads, and Driveways .......................................................... GC-44
5.26.1. General ............................................................................................................ GC-44
5.26.2. Limits of Restored Paving ............................................................................... GC-44
5.27. Dust Abatement ......................................................................................................... GC-44
5.27.1. Prevention of Dust ........................................................................................... GC-44
5.27.2. Damage from Dust .......................................................................................... GC-44
5.28. Sanitation ................................................................................................................... GC-44
5.29. Coordination with Other Projects .............................................................................. GC-44
5.30. Clean Up and Maintenance ...................................................................................... GC-45
5.30.1. Maintenance During the Work ........................................................................ GC-45
5.30.2. Maintenance Upon Completion of the Work .................................................. GC-45
5.31. Record Documentation .............................................................................................. GC-45
5.31.1. Record Drawings ............................................................................................. GC-45
5.31.2. Record Layout Sheets ..................................................................................... GC-45
5.31.3. Record Electrical and Instrumentation Documentation and Software ............ GC-46
5.31.4. Record Drawings Precedent to Payment and Acceptance of Work ................ GC-46
5.32. Lines, Grades and Measurements .............................................................................. GC-46
5.33. Services During an Emergency .................................................................................. GC-46
5.33.1. Contractor’s Obligation to Assist .................................................................... GC-46
5.33.2. Mobilization of Equipment and Personnel ...................................................... GC-46
5.33.3. Compensation .................................................................................................. GC-46
6. Payment for the Work ........................................................................................................ .GC-47
6.1. Payment Only in Accordance with the Contract .......................................................... GC-47
6.2. Monies May Be Retained ............................................................................................. GC-47
6.3. Partial Estimates and the Payment Process .................................................................. GC-47
6.3.1. Monthly Estimates and Payments ..................................................................... GC-47
6.3.2. Unit Price Work ............................................................................................... GC-47
6.3.3. Lump Sum Work ............................................................................................... GC-47
6.3.4. Retention ........................................................................................................... GC-48
6.3.5. When Materials Included in Partial Estimates .................................................. GC-48
6.3.6. Partial Payment Requests .................................................................................. GC-48
6.3.7. Amounts Reserved/Retained ............................................................................. GC-48
6.3.8. Partial Estimates and Payments May Be Withheld ........................................... GC-48
6.3.9. Partial Payments ................................................................................................ GC-48
6.3.9.1. Payment within 30 Calendar Days .............................................................. GC-48
6.3.9.2. Public Contract Code Section 20104.50 ..................................................... GC-49
6.3.9.3. The Retained Percentage/Termination or Discontinuance of Work ........... GC-49
6.4. Final Estimate and Payment (Retention Release) ....................................................... GC-49
6.4.1. Contractor’s Certificate of Completion/Statement of Acceptance or Exceptions .................................................................................................... GC-49
6.4.2. Notice of Completion ........................................................................................ GC-49
6.4.3. The Final Estimate and Payment ....................................................................... GC-49
6.4.4. Warranty ........................................................................................................... GC-50
6.5. No Payment for Temporary Work ............................................................................... GC-50
6.6. Substitution of Securities for Withheld Funds ............................................................. GC-51
Staff Housing Replacement Page TOC-8
6.7. False or Erroneous Estimates and Certificates ............................................................. GC-51
6.8. Termination of Calleguas’ Liability ............................................................................. GC-51
6.8.1. No Claims Except as Allowed by the Contract Documents ............................. GC-51
6.8.2. No Final Payment Without Release on Contract Form Listing Unsettled Claims ............................................................................................... GC-51
6.8.3. Stop Payment Notices ....................................................................................... GC-52
6.8.4. Disputes Over Payment ..................................................................................... GC-52
7. Discontinuance or Termination of the Work ....................................................................... GC-52
7.1. Discontinuance of Work .............................................................................................. GC-52
7.1.1. Notice to Discontinue Work Under Contract .................................................... GC-52
7.1.2. Notice to Surety ................................................................................................. GC-53
7.1.3. Process After Notice of Discontinuance ........................................................... GC-53
7.2. Termination of Contract ............................................................................................... GC-54
7.2.1. Termination by Calleguas ................................................................................. GC-54
7.2.2. Termination by Request of Contractor .............................................................. GC-54
7.2.3. Process After Notice of Termination ................................................................ GC-54
7.2.4. Payment Upon Termination of Contract ........................................................... GC-55
8. Protests and Claims ............................................................................................................. GC-55
8.1. Disputes to Be Brought to Calleguas’ Attention .......................................................... GC-55
8.2. Protest and Claims Procedure ...................................................................................... GC-56
8.2.1. Notice of Protest Required Within One Working Day ..................................... GC-56
8.2.2. Confirmation ..................................................................................................... GC-56
8.2.3. Daily Work Report Required While Performing Protested Work .................... GC-57
8.2.4. Execution of Daily Work Report ...................................................................... GC-57
8.2.5. Submittal of Claim ............................................................................................ GC-57
8.2.5.1. Timing ......................................................................................................... GC-57
8.2.5.2. Form of Claim ............................................................................................. GC-57
8.2.5.3. Claims on Behalf of Subcontractors ............................................................ GC-58
8.2.5.4. Certification Under Penalty of Perjury ........................................................ GC-58
8.2.5.5. Substantiation Required .............................................................................. GC-58
8.2.5.6. Waiver of Protest or Claim .......................................................................... GC-58
8.2.6. Response to Claim ............................................................................................. GC-59
8.2.6.1. Timing on Claims Less than or Equal to $50,000.00 .................................. GC-59
8.2.6.2. Timing on Claims Greater than $50,000.00 ................................................ GC-59
8.2.6.3. Board Approval for Claims ......................................................................... GC-59
8.2.6.4. Calleguas’ Failure to Respond .................................................................... GC-59
8.2.6.5. Payment ....................................................................................................... GC-59
8.2.7. Meet and Confer ................................................................................................ GC-60
8.2.7.1. Contractor Must Demand Meet and Confer ................................................ GC-60
8.2.7.2. Post Meet and Confer Procedures ............................................................... GC-60
8.2.8. Procedure for Civil Actions for Claims Less than or Equal to $375,000 ......... GC-60
8.2.8.1. Nonbinding Mediation ................................................................................ GC-60
8.2.8.2. Judicial Arbitration ...................................................................................... GC-61
8.2.8.3. Fees Normally to Be Split By Parties .......................................................... GC-61
8.2.8.4. Trial De Novo – Less Favorable Judgment – Attorney Fees Award .......... GC-61
8.2.8.5. Attendance of Witnesses ............................................................................. GC-61
8.2.8.6. Interest on Award ........................................................................................ GC-61
8.2.8.7. Payment on Undisputed Portion of Claims ................................................. GC-61
8.3. False Claims ................................................................................................................. GC-61
Staff Housing Replacement Page TOC-9
8.4. Right to Audit ............................................................................................................... GC-61
8.5. Tort Claims ................................................................................................................... GC-62
8.6. Obligation to Continue the Work ................................................................................. GC-62
9. Miscellaneous ...................................................................................................................... GC-62
9.1. Captions ........................................................................................................................ GC-62
9.2. Waiver/Estoppel ........................................................................................................... GC-62
9.3. Partial Invalidity ........................................................................................................... GC-62
9.4. Contractor Acknowledges Review of Contract Documents ........................................ GC-62
9.5. Limitations on Engineer’s Review of Shop Drawings and Submittals ........................ GC-63
9.5.1. Review Does Not Extend to Means and Methods ............................................ GC-63
9.5.2. Review Does Not Relieve Contractor from Compliance with Contract Documents..
................................................................................................................................... GC-63
9.6. Antitrust Claims ........................................................................................................... GC-63
9.7. Additional Surety ......................................................................................................... GC-63
9.8. Assignment Forbidden ................................................................................................. GC-63
9.9. Title to Materials Found on the Work .......................................................................... GC-64
9.10. Right of Property in Materials ................................................................................... GC-64
9.11. Use of Completed Portions of the Work ................................................................... GC-64
9.12. Audit and Access to Records .................................................................................... GC-64
9.12.1. Definition of Record ....................................................................................... GC-64
9.12.2. Contractor to Maintain Pertinent Records ....................................................... GC-64
9.12.3. Calleguas Has the Right to Audit .................................................................... GC-64
9.12.4. Contractor to Provide Access upon 24 Hours Notice ..................................... GC-65
9.12.5. Applicability of Audit Provisions ................................................................... GC-65
9.12.6. Record Retention Period ................................................................................. GC-65
9.12.7. Access Not Limited to Record Retention Period ............................................ GC-65
9.12.8. Audit Provisions Survive Contract Termination ............................................. GC-65
9.12.9. Applicability to Subcontractors ....................................................................... GC-65
9.13. Attorneys’ Fees and Venue .................................................................................... GC-65
9.13.1. Attorneys’ Fees .............................................................................................. GC-65
9.13.2. California Law and Venue .............................................................................. GC-65
9.14. Gender ..................................................................................................................... GC-66
SPECIFICATIONS - SPECIAL CONDITIONS
1. Completion of Work and Liquidated Damages for Delays ................................................... SC-1
2. Construction Sequence and Phases ....................................................................................... SC-1
3. Work Hours and Days ........................................................................................................... SC-2
4. No Work Days ....................................................................................................................... SC-3
5. Preconstruction Meeting ........................................................................................................ SC-3
6. Right of Way ......................................................................................................................... SC-3
7. Contractor Facilities .............................................................................................................. SC-4
8. Access to Work Areas Prior to Bid Opening ........................................................................ SC-4
9. Geotechnical Report .............................................................................................................. SC-5
10. Information from Previous Projects ...................................................................................... SC-7
11. Owner Costs .......................................................................................................................... SC-8
12. Progress Meetings ................................................................................................................. SC-8
13. Damage to Existing District Facilities ................................................................................... SC-9
Staff Housing Replacement Page TOC-10
14. Utility Notification ................................................................................................................ SC-9
15. Factory Inspection and Witnessed Factory Testing .............................................................. SC-9
16. Retention ............................................................................................................................. SC-10
17. Security ................................................................................................................................ SC-10
18. Pre-Construction Video ....................................................................................................... SC-10
19. Valley Fever ......................................................