18-333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf
PDF 24 MB Posted
- Attached to
- LANDFILL MONITORING WELL REPLACEMENT
- Solicitation number
- BID-UD 26-01-0-2026/KW
- Issued by
- San Luis Obispo County, California
About this file
This is a geotechnical study specification document for the Lake Bard Water Treatment Plant, prepared for the State of California. The project scope encompasses the abandonment of one existing groundwater well and the installation of two new groundwater monitoring wells at designated locations. Final well depths and screened intervals will be determined in the field by the Project Hydrogeologist based on observed subsurface conditions and in accordance with applicable State and local regulations and approved work plans. The contractor is responsible for providing all necessary work plans, permits, inspections, and compliance documentation as specified in the technical requirements and project plans.
The specification document establishes technical requirements and standards for well abandonment and installation procedures, ensuring compliance with California regulatory requirements for groundwater monitoring infrastructure. The contractor must demonstrate capability in geotechnical drilling, well construction, and environmental permitting processes. Specific pricing terms, award dates, contract duration, and bid submission deadlines are not detailed in the provided specification excerpt, though the work is contingent upon field conditions and hydrogeological assessment during project execution.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .