Hwy 29 Over PNWR - Deck Resurfacing

Closed State & local contract opportunity Posted

Solicitation number
S-73000-00014236
State
Oregon
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 25

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Transportation (ODOT) is soliciting bids for the Highway 29 Over PNWR Deck Resurfacing Project, a state-funded public improvement contract focused on bridge infrastructure rehabilitation. The procurement is an Invitation to Bid (ITB) for comprehensive bridge and roadway work, including bridge surfacing, asphalt concrete pavement construction, waterproof membrane installation, joint seal replacement, and permanent pavement markings. The project will be executed on Bridge No. 16185, located on Tualatin Valley Highway at Milepost 5.13, with a total project length of approximately 200 feet. Bids must be submitted through the OregonBuys eProcurement system by August 12, 2025, with a required substantial completion date of September 20, 2025, and a final completion date of September 30, 2025. Bidders must be registered in OregonBuys, comply with state prevailing wage requirements, and adhere to State Buy America requirements mandating that steel, iron, and manufactured products be produced in the United States. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation considerations including non-resident bidder preferences, recycled materials usage, and compliance with state regulations.

The procurement does not explicitly specify set-aside designations for disadvantaged enterprises, though typical ODOT contracts often include provisions for minority and women-owned business participation. Bidders are required to submit bid security, either a bid bond, certified check, or cashier's check for 10% of the total bid amount. Liquidated damages of $700 per calendar day will be assessed for failure to meet the substantial completion date. While specific budget ranges are not directly stated, the comprehensive nature of the project—involving bridge deck removal, polymer membrane installation, joint seal replacement, and pavement work—suggests a significant infrastructure investment. The project will utilize the 2024 Oregon Standard Specifications for Construction and follows detailed technical specifications outlined in the accompanying standard drawings and special provisions. Contractors will need to demonstrate technical capabilities in bridge resurfacing, pavement construction, traffic control, and compliance with environmental and safety regulations.

Opportunity text

The purpose of this ITB is to establish a Contract for bridge surfacing, asphalt concrete pavement, installing waterproof membrane & joint seals, installing permanent pavement markings and other Work as indicated in the Contract documents for the benefit of ODOT.

Files

File Type Posted
PW-25-08 Addendum 1-Plan Sheets.pdf PDF
Attachment A - Special Provisions~44.pdf PDF
Attachment B - Plans~3.pdf PDF
Preliminary Bid Results~65.xlsx XLSX spreadsheet
00014236_Invitation To Bid.docx DOCX document
Attachment C - Bid Pricing Form~51.xlsx XLSX spreadsheet
Attachment D - Standard Drawings~6.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity