Attachment B - Plans~3.pdf

PDF 2 MB Posted

Attached to
Hwy 29 Over PNWR - Deck Resurfacing
Solicitation number
S-73000-00014236
Issued by
Washington County, Oregon

About this file

The file contains detailed engineering and construction plans for the Oregon Department of Transportation's Highway 29 Over PNWR Deck Resurfacing Project located on the Tualatin Valley Highway in Washington County, Oregon, scheduled for July 2025. The project involves deck resurfacing and structural improvements for Bridge 16185, with specific work items including bridge approach slab cold plane pavement removal, bridge deck cold plane pavement removal, removing existing concrete deck, placing polymer membrane on the bridge deck, constructing control joints, and installing a new longitudinal precompressed foam silicone joint seal.

The project documents specify precise technical details for the highway infrastructure improvements, with construction notes indicating work will be performed according to the 2024 Oregon Standard Specifications for Construction. The project limits are defined along Tualatin Valley Highway (No. 029) at Milepost 5.13, with an overall project length of approximately 200 feet. The plan includes detailed drawings showing pavement limits, construction notes, work items, and specific technical requirements for deck resurfacing, joint replacement, and pavement markings. The project is set to be renewed by 12-31-2025 and involves specific engineering specifications for materials, joint treatments, and roadway modifications.

View the file

Other files

File Type Posted
Attachment C - Bid Pricing Form~51.xlsx XLSX spreadsheet
Attachment A - Special Provisions~44.pdf PDF
00014236_Invitation To Bid.docx DOCX document
Attachment D - Standard Drawings~6.pdf PDF
PW-25-08 Addendum 1-Plan Sheets.pdf PDF
Preliminary Bid Results~65.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025.06.17 16:13:57 -07'00'

2025.06.17 15:59:15-07'00'

2025.06.16 14:57:12 -07'00'

File details come from the government source that posted it. Updated .