Pinellas County, Florida is requesting bids on complete rehabilitation of the Gulf Beach Booster Station (PID 002150A) under a two-step ITB-C process, with Step One bids due October 20, 2026 at 3:00 PM and a mandatory site visit and pre-conference on October 14, 2026 at 10:00 AM. An 11% Small Business Enterprise participation goal applies to subcontractor awards.

Bidder eligibility requires either FDOT pre-qualification in drainage work at an amount equal to or exceeding the bid amount or a Florida Certified General Contractor license. Bidders must provide a bonding letter indicating maximum bonding capacity and submit a minimum of four professional contract references demonstrating successful completion of similar projects within the past seven years.

The scope encompasses complete modernization of a facility originally constructed in the 1960s to meet current industry and operational standards as identified in the Water System Master Plan. Work includes mobilization and demobilization, general requirements, temporary bypass pumping and treatment facilities, contaminated soil removal, demolition, ground storage tank modifications, booster station facility upgrades, and a $150,000 ground storage tank rehabilitation allowance for unspecified work. The project site consists of loose to very dense sand layers with water table at 4 to 4.5 feet below ground surface; the geotechnical report recommends shallow foundation support with proof-rolling and compaction as critical preparation activities. The contractor is responsible for obtaining all required permits identified in Appendix 1; permit fees are reimbursable but license fees are not. All sales, use, and similar taxes are the contractor's responsibility. The contractor must commence work within 15 consecutive calendar days after receipt of notice to proceed and complete all work within 850 consecutive calendar days. Unit prices must remain firm from contract execution through project completion and acceptance. A 5% bid bond, performance bond, and payment bond each at 100% of contract value are required. Step Two bid submission is November 5, 2026 at 3:00 PM. Questions are due October 16, 2026. All submittals must be uploaded via the OpenGov procurement portal.

Opportunity text

The Gulf Beach Booster Station was originally constructed in the 1960's. The facility is due for a complete rehabilitation to meet current industry and operational standards. The recent Water Master Plan identifies the needed improvements to address overall condition, performance and increase the resiliency of the facility.