FIRST AVENUE DRAINAGE IMPROVEMENTS PROJECT - PHASE 2
- Escambia County, Florida is requesting bids on the Brickyard Road Drainage Improvements Construction project (CDBG-DR HS005), a Hurricane Sally recovery infrastructure project with bids due July 20, 2026 at 1:00 PM and a non-mandatory pre-bid meeting on June 25, 2026 at 11:00 AM. This is a federally funded CDBG-DR project subject to Davis-Bacon prevailing wage requirements, Section 3 employment preferences, and domestic materials procurement mandates. The scope involves replacing a damaged...
- Escambia County Board of County Commissioners is requesting sealed bids for Monroe Avenue Drainage Improvements under CDBG-DR HS005, with bids due June 29, 2026 at 10:00 a.m. and a non-mandatory pre-bid meeting scheduled for June 9, 2026 at 11:00 a.m. via Microsoft Teams. This is a federal HUD-funded disaster recovery project subject to Section 3 employment and economic opportunity requirements, Davis-Bacon prevailing wage standards, and mandatory Section 3 compliance certifications. The scope...
- Pinellas County, Florida is requesting qualifications by July 7, 2026 at 3:00 PM for an Infrastructure Repair Work Order Contract (ITB-C #26-0208) covering reconstruction of infrastructure damaged in the 2024 hurricane season, including concrete repairs, site cleanup, milling and resurfacing, landscape work, fencing, sidewalk repairs, ADA ramps, and sheet pile installation throughout the county. Bidders must meet a 12% Small Business Enterprise participation goal and submit an SBE Compliance...
- The City of Edgewater is requesting sealed bids from qualified and licensed contractors for construction of the SUNTrail North Segment from S.R. 442 to Dale Street (FPID 439862-3-54-01), with bids due July 9, 2026. The project is funded by the Florida Department of Transportation's State-funded Shared Use Nonmotorized SUN Trail Network Program and shall comply with FDOT Standard Specifications for Road and Bridge Construction, FY 2025–26 Edition, applicable FDOT Standard Plans, Florida Greenbook...
- Seminole County Board of County Commissioners is requesting bids on installation of five new 16-inch valves on an existing PVC force main and a new 12-inch electromagnetic flow meter assembly in Lake Mary under IFB Project CC-7172-26/HSM, with bids due June 17, 2026 at 2:00 p.m. and a mandatory pre-proposal meeting on May 26, 2026 at 9:00 a.m. The County seeks a General Contractor and/or Certified Underground Utilities Contractor fully licensed and certified in Florida at the time of bid...
- Flagler County is requesting bids on replacement of approximately 3,620 linear feet of airfield security fencing with 10-foot-high wildlife exclusion fencing at Flagler Executive Airport under ITB 26-ITB-015, with bids due June 30, 2026. The scope consists of 10-foot galvanized chainlink fence fabric with three-strand barbed wire, a 4-foot buried wildlife exclusion skirt, top wire only (no top rail), and new manually operated rolling-type access gates with V-tracks and concrete pads. Where...
- Clay County Board of County Commissioners is requesting bids for drainage repair and new public works construction services on an as-needed basis throughout Clay County, with bids due July 9, 2026. The scope encompasses all labor, supervision, personnel, materials, equipment, tools, transportation, traffic control, erosion and sediment control measures, permits, and incidentals necessary to perform storm drainage repairs, drainage structure repairs and replacements, and new public works...
- Escambia County Board of County Commissioners is requesting sealed bids for the CDBG-DR Olive Road Street Improvement Project – Phase I Construction (HS005), a comprehensive street and infrastructure reconstruction along approximately 1.14 miles of Olive Road in Pensacola, Florida, with bids due July 13, 2026 at 10:00 a.m. and a pre-bid meeting on June 16, 2026 at 2:00 p.m. via Microsoft Teams. This is a federal HUD-funded project subject to Davis-Bacon prevailing wage requirements, Section 3...
- Santa Rosa County Board of County Commissioners is requesting sealed bids for CR 182 Widening and Resurfacing under ITB 26-021, federally funded through Local Agency Program grants (FPN 451781-2-58-01 and 451781-2-58-02), with bids due July 20, 2026 at 10:00 a.m. and a mandatory pre-bid meeting on June 25, 2026 at 10:00 a.m. at the Santa Rosa County Engineering Department in Milton, Florida. Contractors must be prequalified with the Florida Department of Transportation in Flexible Pavement,...
- Orange County, Florida is accepting sealed bids for Alafaya Trail Force Main and Air Release Valves Replacement SR50 to EWRF (Y26-749-EB), with bids due June 25, 2026 at 4:00 p.m. EST. The estimated contract value is $8,941,744.39. All bid submissions must be made electronically via the OpenGov e-Procurement Platform; hand-delivery, mail, telephone, fax, and email submissions will be rejected. Respondents must create a free OpenGov account at https://procurement.opengov.com/login prior to...
Flagler County Board of County Commissioners is requesting bids on the First Avenue Drainage Improvements Project – Phase 2, a roadside drainage construction project in Flagler County, Florida, under ITB 26-ITB-017, with bids due July 29, 2026 at 2:00 p.m. Bidders must be prequalified by the Florida Department of Transportation in the major classes of work including Flexible Paving, Hot Plant-Mixed Bituminous Courses, Drainage, and Grading, and must submit a copy of their FDOT Certificate of Qualification with their bid. The scope includes construction of approximately 0.243 miles of drainage improvements along First Avenue from Malacompra Road to the northern dead end, encompassing conveyance swales, storm sewer pipe (ranging from 14 inches to 36 inches in diameter), side drain pipes, cross drain pipes, drainage structures and inlets, end treatments, clearing and grubbing, grading, excavation, embankment work, and resurfacing at the First Avenue and Malacompra Road intersection. The County is requesting pricing for the Base Bid and two additive options: Option 1 for construction of an approximately 350-foot conveyance swale with fencing, inlet, and storm sewer pipe, and Option 2 for modifying an existing end treatment with an aluminum Whipps Model 452 flap gate installation. The project is governed by FDOT Standard Plans and Specifications (FY 2025-26) and is conditioned on compliance with Environmental Resource Permit 168205-2 issued by the St. Johns River Water Management District. Contract time for completion is 120 calendar days from Notice to Proceed. The successful contractor must furnish Performance and Payment Bonds and a one-year Warranty Bond, each equal to at least 100% of the contract price, and must provide Commercial General Liability coverage of $5 million annual general aggregate and Automobile Liability of $1 million combined single limit. A non-mandatory pre-bid meeting is scheduled for July 1, 2026 at 11:00 a.m. at the Flagler County Engineering Department, 1769 East Moody Boulevard, Building 2, Bunnell, Florida. Written questions are due July 9, 2026 at 12:00 p.m., with final addenda issued by July 16, 2026. Bids must be submitted electronically through the OpenGov Procurement portal. All bids must remain firm for 90 days after opening.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
25008137-00_FirstAveDrainage_FINAL_Plans_S&S.pdf | 9MB | 6/12/26 | ||
FIRST_AVENUE_DRAINAGE_IMPROVEMENTS_PROJECT_-_PHASE_2.pdf | 711KB | 6/25/26 | ||
08-01_PAYMENT_AND_PERFORMANCE_BOND.pdf | 110KB | 6/12/26 | ||
Project_Forms_Combined.pdf | 1MB | 6/10/26 | ||
SJRWMD_Permit_Mod.pdf | 266KB | 6/12/26 |