DOC-DIX CC-Replace Gatehouse sidewalk
Closed State & local contract opportunity Posted
- Solicitation number
- 25-426DOC-DIXON-B-44961
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 46161535 Pedestrian walkway street boundary marker
- 46161538 Vehicle height restriction bars
- 72141105 Sidewalk construction and repair service
- 72152705 Sidewalk or ramp construction service
- 72152706 Driveway construction service
- 72152707 Retaining wall construction service
- 95111616 Pedestrian way
- 95111608 Bike path
- 95111617 Footpath
Opportunity details come from bidbuy.illinois.gov. Updated .
About this opportunity
The state and local contract opportunity is for the removal and replacement of the Gatehouse Sidewalk at the Dixon Correctional Center, which is operated by the Illinois Department of Corrections (IDOC). The contract requires a contractor to furnish all labor, materials, tools, and equipment to remove the existing damaged sidewalk and replace it with approximately 390 feet of new 4-inch deep concrete sidewalk. The work must be completed in a timely manner to avoid disruption. A mandatory pre-bid conference and site visit is scheduled for October 10, 2024, and bids are due no later than October 18, 2024 at 1:00 p.m. The contract will have an initial term from the date of execution through June 30, 2025, with no option to renew. The total price is estimated, and the contractor's pricing is included in the BidBuy Purchase Order. Prevailing wage requirements apply, and the contractor must comply with all state and local laws, rules, and regulations. The contract is contingent upon the availability of funds, and the state may terminate the contract for convenience with 30 days' notice or for cause if the contractor fails to perform.
The contract opportunity does not appear to have any set-aside designations or restrictions on the types of organizations that can respond. The documents do not indicate any listed incumbent vendors or current contractors, nor do they provide any information about existing infrastructure or technology that requires integration. The available information does not include any listed award values or budget ranges for the contract.
Opportunity text
tear out existing sidewalk replace with new.
Files
| File | Type | Posted |
|---|---|---|
| Dixon gatehouse sidewalk replacement B-44961 RFQ.docx | DOCX document | |
| 25RM043 standard-illinois-certifications-v.23.1 (3).docx | DOCX document | |
| 25RM043 Gatehouse sidewalk photos and specs.pdf | ||
| 25RM043 standard-terms-and-conditions (1).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity