Corridor - Ashaway

Closed State & local contract opportunity Posted

Solicitation number
TCB26006498
State
Rhode Island
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from webprocure.proactiscloud.com. Updated .

About this opportunity

The Rhode Island Department of Transportation is requesting bids for the Corridor–Ashaway project involving replacement of three bridges (Bridge No. 005051, a butted box beam; Bridge No. 005151, a concrete arch; and Bridge No. 005251, a butted box beam) spanning bodies of water in Providence County, with proposals due August 28, 2026 at 1:00 p.m. EDT. The project is federally funded under the Federal-Aid Highway program with 80% FHWA funding and 20% state funding (FAP Number STP-3334(001)). All work is subject to Davis-Bacon prevailing wage requirements effective May 18, 2026, and Buy America compliance mandates domestic content of 55 percent for manufactured products with a minimal use threshold of $2,500 or 0.1 percent of contract value for foreign materials.

The scope includes bridge demolition, foundation work (including piles and micropile systems), prefabricated structural steel tub girders, ultra-high-performance concrete closure pours, abutment and pier construction, deck systems, utility relocations (including gas mains), drainage structures, stormwater treatment systems (cascade separators, infiltration trenches, permeable pavers), erosion control, ADA-compliant accessibility improvements, guardrails, landscaping, and asphalt and concrete placement across multiple work locations. Phased completion deadlines are November 10, 2027 for the Ashaway River Bridge and August 14, 2028 for the Potter Hill Bridge, with substantial completion by October 23, 2028. Liquidated damages are $3,500 per day for phase completions and $1,950 per day for substantial completion milestones. Lump sum item breakdowns are due within 70 days of apparent low bidder notification. Prefabricated bridge units require detailed shop drawings, welding procedures, and quality documentation with 1/4-inch placement tolerances for width and 1/8-inch for bearing elevation. All proposals must be submitted electronically through Ocean State Procures; vendor questions are due August 19, 2026 at 12:00 p.m. EDT. A 5% bid bond and 100% performance bond are required. Required insurance includes $1,000,000 general liability and workers' compensation. A 0.33% contract administrative fee applies.

Opportunity text

This project consists of 3 bridge replacements. They include Bridge No. 005051 (butted box beam), Bridge No. 005151 (concrete arch), and Bridge No. 005251 (butted box beam). All bridges are over bodies of water. The bridges were built between 1928 and 2002 with several rehabilitations performed as recently as 2019. All the bridges have a bituminous wearing surface. The bridge inspection reports, photos, utility information, and other attached documents provide additional information about the individual bridges.

Files

File Type Posted
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf PDF
TCB26006498_Aug_3_26_solicitation_doc.pdf PDF
TCB26006498_Aug_31_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 920.0330_Addendum-2.pdf PDF
TCB26006498_Oct_6_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0403_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ BR005151_Addendum-2.pdf PDF
2026-CB-019_Plan_File_V1.pdf PDF
2026-CB-019_Plan_File_V2.pdf PDF
TCB26006498_Sep_11_26_solicitation_doc.pdf PDF
TCB26006498_Oct_2_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 401.3000_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_2_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_1_Addendum-2.pdf PDF
TCB26006498_Oct_15_26_solicitation_doc.pdf PDF
TCB26006498_Sep_16_26_solicitation_doc.pdf PDF
0013Q_V2_015_52_BEAMDETL_REV1.pdf PDF
0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0432_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 203.0310_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf PDF
TCB26006498_Oct_9_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_CS Pages CS-11_Addendum-2.pdf PDF
Federal Wage Rates 5-18-2026.pdf PDF
2026-CB-019-Corridor-Ashaway_JS_Pages.pdf PDF
TCB26006498_Sep_10_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 841.0100_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0417_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_5_Addendum-2.pdf PDF
TCB26006498_Oct_8_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_4_Addendum-2.pdf PDF
Show all 31

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity