This is an addendum document for the Corridor-Ashaway bridge replacement project issued by the Rhode Island Department of Transportation (RIDOT) for R.I. Contract No. 2026-CB-019 under FAP No. STP3334001. The project encompasses the replacement of three bridges: Ashaway River Bridge No. 005051, Potter Hill Culvert No. 005151, and Potter Hill Bridge No. 005251. The scope of work includes installation of temporary and new gas mains for each bridge, adjustment of curb stops and utility boxes to grade (36 units), temporary deck protective shielding (7,900 square feet), repairs to structure concrete masonry patching (9 cubic feet), structural concrete crack repair (60 linear feet), pre and post-construction condition surveys, mobilization and demobilization of micropile equipment, installation of 62 micropiles with verification and proof load tests, and steel beam guardrail installation (680 linear feet). The project is federally funded with 80% FHWA funding and 20% state funding. Phased completion deadlines are November 10, 2027 for the Ashaway River Bridge and August 14, 2028 for the Potter Hill Bridge, with substantial completion required by October 23, 2028. Proposals were due August 28, 2026 at 1:00 p.m. EDT, with vendor questions due August 19, 2026 at 12:00 p.m. EDT.

All work is subject to Davis-Bacon prevailing wage requirements effective May 18, 2026, and Buy America compliance mandates requiring domestic content of 55 percent for manufactured products. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion milestones. Lump sum item breakdowns are due within 70 days of apparent low bidder notification. Prefabricated bridge units require detailed shop drawings, welding procedures, and quality documentation with specified placement tolerances. A 5% bid bond and 100% performance bond are required. Required insurance includes $1,000,000 general liability and workers' compensation coverage. A 0.33% contract administrative fee applies to the award. All proposals must be submitted electronically through Ocean State Procures.

View the file

Other files

File Type Posted
2026_February_Standard_Specifications.zip.crdownload CRDOWNLOAD file
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf PDF
TCB26006498_Aug_3_26_solicitation_doc.pdf PDF
TCB26006498_Aug_31_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 920.0330_Addendum-2.pdf PDF
TCB26006498_Oct_6_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0403_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ BR005151_Addendum-2.pdf PDF
TCB26006498_Sep_16_26_solicitation_doc.pdf PDF
0013Q_V2_015_52_BEAMDETL_REV1.pdf PDF
0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0432_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 203.0310_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf PDF
TCB26006498_Oct_9_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_CS Pages CS-11_Addendum-2.pdf PDF
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf.crdownload CRDOWNLOAD file
Federal Wage Rates 5-18-2026.pdf PDF
2026-CB-019-Corridor-Ashaway_JS_Pages.pdf PDF
TCB26006498_Sep_10_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 841.0100_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0417_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_5_Addendum-2.pdf PDF
TCB26006498_Oct_8_26_solicitation_doc.pdf PDF
TCB26006498_Oct_16_26_solicitation_doc.pdf PDF
2026-CB-019_Plan_File_V1.pdf PDF
2026-CB-019_Plan_File_V2.pdf PDF
TCB26006498_Sep_11_26_solicitation_doc.pdf PDF
TCB26006498_Oct_2_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 401.3000_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_2_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_1_Addendum-2.pdf PDF
TCB26006498_Oct_15_26_solicitation_doc.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Code Description Quantity UOM

Distribution of Quantities

0013Q Corridor - Ashaway

Estimate Name - PS&E Estimate

R.I. Contract No. - 2026-CB-019

FAP No. STP3334001

712.9901 INSTALLATION OF TEMPORARY GAS MAIN - BRIDGE #005251 1 LS

712.9902 INSTALLATION OF TEMPORARY GAS MAIN - BRIDGE #005151 1 LS

712.9903 INSTALLATION OF TEMPORARY GAS MAIN - BRIDGE #005051 1 LS

712.9904 INSTALLATION OF NEW GAS MAIN - BRIDGE #005251 1 LS

712.9905 INSTALLATION OF NEW GAS MAIN - BRIDGE #005151 1 LS

712.9906 INSTALLATION OF NEW GAS MAIN - BRIDGE #005051 1 LS

713.0100 ADJUST CURB STOP OR UTILITY BOX TO GRADE 36 EACH

800.9901 ASHAWAY RIVER BRIDGE NO. 050 1 LS

800.9902 POTTER HILL CULVERT NO. 051 1 LS

800.9903 POTTER HILL BRIDGE NO. 052 1 LS

803.0500 TEMPORARY DECK UNDERSIDE AND SIDE PROTECTIVE SHIELDING 7900 SF

817.2112 REPAIRS TO STRUCTURE CONCRETE MASONRY - PATCHING MORTAR 9 CF

836.0100 STRUCTURAL CONCRETE CRACK REPAIR BY EPOXY-RESIN BASE ADHESIVE INJECTION 60 LF

841.0100 PRE AND POST CONSTRUCTION CONDITION SURVEYS 1 LS

844.0100 MOBILIZATION & DEMOBILIZATION OF MICROPILE EQUIPMENT 1 LS

844.0200 MICROPILE 62 EACH

844.0300 VERIFICATION LOAD TEST 2 EACH

844.0400 PROOF LOAD TEST 2 EACH

901.1000 STEEL BEAM GUARDRAIL 680 LF