0013Q Corridor-Ashaway_DOQ Index Page_2_Addendum-2.pdf

PDF 604 KB Posted

Attached to
Corridor - Ashaway
Solicitation number
TCB26006498
Issued by
Providence County, Rhode Island

About this file

This document is an addendum index page for a Rhode Island Department of Transportation (RIDOT) bridge replacement project titled Corridor-Ashaway, associated with R.I. Contract No. 2026-CB-019 and FAP No. STP3334001. The project encompasses the replacement of three bridges (Bridge No. 005051, a butted box beam; Bridge No. 005151, a concrete arch; and Bridge No. 005251, a butted box beam) spanning bodies of water in Providence County. The scope of work includes extensive erosion control and sediment prevention measures, site preparation, asphalt and concrete placement, and related infrastructure work. Key line items include cofferdams (1 LS), pervious fill (1,310 CY), silt fence (148 LF), compost filter sock (6,600 LF), dewatering equipment and basins, hot mix asphalt preparation and placement totaling approximately 16,400 SY of preparation work and 4,198 tons of HMA, gravel borrow and aggregate materials, full-depth reclamation with calcium chloride (13,750 SY), and guardrail milllings placement (700 LF). Proposals were due August 28, 2026 at 1:00 p.m. EDT, with vendor questions due August 19, 2026 at 12:00 p.m. EDT. Project completion deadlines are phased, with the Ashaway River Bridge due November 10, 2027 and the Potter Hill Bridge due August 14, 2028, with substantial completion by October 23, 2028.

The project is federally funded under the Federal-Aid Highway program with 80% FHWA funding and 20% state funding. All work is subject to Davis-Bacon prevailing wage requirements effective May 18, 2026, and Buy America compliance mandates domestic content of 55 percent for manufactured products. A 5% bid bond and 100% performance bond are required. Required insurance includes $1,000,000 general liability and workers' compensation coverage. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion milestones. Lump sum item breakdowns are due within 70 days of apparent low bidder notification. Prefabricated bridge units require detailed shop drawings, welding procedures, and quality documentation with strict placement tolerances (1/4-inch for width and 1/8-inch for bearing elevation). All proposals must be submitted electronically through Ocean State Procures, and a 0.33% contract administrative fee applies.

View the file

Other files

File Type Posted
2026-CB-019_Plan_File_V1.pdf PDF
2026-CB-019_Plan_File_V2.pdf PDF
TCB26006498_Sep_11_26_solicitation_doc.pdf PDF
TCB26006498_Oct_2_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 401.3000_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_1_Addendum-2.pdf PDF
TCB26006498_Oct_15_26_solicitation_doc.pdf PDF
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf.crdownload CRDOWNLOAD file
Federal Wage Rates 5-18-2026.pdf PDF
2026-CB-019-Corridor-Ashaway_JS_Pages.pdf PDF
TCB26006498_Sep_10_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 841.0100_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0417_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_5_Addendum-2.pdf PDF
TCB26006498_Oct_8_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_4_Addendum-2.pdf PDF
TCB26006498_Oct_16_26_solicitation_doc.pdf PDF
2026_February_Standard_Specifications.zip.crdownload CRDOWNLOAD file
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf PDF
TCB26006498_Aug_3_26_solicitation_doc.pdf PDF
TCB26006498_Aug_31_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 920.0330_Addendum-2.pdf PDF
TCB26006498_Oct_6_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0403_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ BR005151_Addendum-2.pdf PDF
TCB26006498_Sep_16_26_solicitation_doc.pdf PDF
0013Q_V2_015_52_BEAMDETL_REV1.pdf PDF
0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0432_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 203.0310_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf PDF
TCB26006498_Oct_9_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_CS Pages CS-11_Addendum-2.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Code Description Quantity UOM

Distribution of Quantities

0013Q Corridor - Ashaway

Estimate Name - PS&E Estimate

R.I. Contract No. - 2026-CB-019

FAP No. STP3334001

203.0510 COFFERDAMS 1 LS

203.0700 PERVIOUS FILL 1310 CY

206.0220 SILT FENCE STANDARD 9.2.0 148 LF

206.0301 COMPOST FILTER SOCK 6600 LF

207.0310 COMPOST FILTER SOCK CHACK DAMS 15 LF

208.0102 DEWATERING BASIN 4 EACH

208.0300 DEWATERING 1 LS

209.0220 SACK INSERT INLET PROTECTION 15 EACH

212.2200 MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION CONTROLS 1 LS

213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL 700 LF

302.0100 GRAVEL BORROW SUBBASE COURSE 126 CY

303.0100 SPECIAL GRADED AGGREGATE FOR SHAPING AND TRIMMING DRIVEWAYS OR SHOULDERS 36 CY

401.0510 HOT MIX ASPHALT PREPARATION - PARTIAL DEPTH 2550 SY

401.0520 HOT MIX ASPHALT PREPARATION - FULL DEPTH 13850 SY

401.1000 CLASS 19.0 HMA 2025 TON

401.2100 MODIFIED CLASS 12.5 HMA 2025 TON

401.3000 CLASS 9.5 HMA 1 TON

401.3100 MODIFIED CLASS 9.5 HMA 173 TON

406.0200 FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE 13750 SY

joseph.skymba Cloud joseph.skymba Stamp

File details come from the government source that posted it. Updated .