This document is an addendum index page for a Rhode Island Department of Transportation (RIDOT) bridge replacement project titled Corridor-Ashaway, associated with R.I. Contract No. 2026-CB-019 and FAP No. STP3334001. The project encompasses the replacement of three bridges (Bridge No. 005051, a butted box beam; Bridge No. 005151, a concrete arch; and Bridge No. 005251, a butted box beam) spanning bodies of water in Providence County. The scope of work includes extensive erosion control and sediment prevention measures, site preparation, asphalt and concrete placement, and related infrastructure work. Key line items include cofferdams (1 LS), pervious fill (1,310 CY), silt fence (148 LF), compost filter sock (6,600 LF), dewatering equipment and basins, hot mix asphalt preparation and placement totaling approximately 16,400 SY of preparation work and 4,198 tons of HMA, gravel borrow and aggregate materials, full-depth reclamation with calcium chloride (13,750 SY), and guardrail milllings placement (700 LF). Proposals were due August 28, 2026 at 1:00 p.m. EDT, with vendor questions due August 19, 2026 at 12:00 p.m. EDT. Project completion deadlines are phased, with the Ashaway River Bridge due November 10, 2027 and the Potter Hill Bridge due August 14, 2028, with substantial completion by October 23, 2028.
The project is federally funded under the Federal-Aid Highway program with 80% FHWA funding and 20% state funding. All work is subject to Davis-Bacon prevailing wage requirements effective May 18, 2026, and Buy America compliance mandates domestic content of 55 percent for manufactured products. A 5% bid bond and 100% performance bond are required. Required insurance includes $1,000,000 general liability and workers' compensation coverage. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion milestones. Lump sum item breakdowns are due within 70 days of apparent low bidder notification. Prefabricated bridge units require detailed shop drawings, welding procedures, and quality documentation with strict placement tolerances (1/4-inch for width and 1/8-inch for bearing elevation). All proposals must be submitted electronically through Ocean State Procures, and a 0.33% contract administrative fee applies.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Code Description Quantity UOM
Distribution of Quantities
0013Q Corridor - Ashaway
Estimate Name - PS&E Estimate
R.I. Contract No. - 2026-CB-019
FAP No. STP3334001
203.0510 COFFERDAMS 1 LS
203.0700 PERVIOUS FILL 1310 CY
206.0220 SILT FENCE STANDARD 9.2.0 148 LF
206.0301 COMPOST FILTER SOCK 6600 LF
207.0310 COMPOST FILTER SOCK CHACK DAMS 15 LF
208.0102 DEWATERING BASIN 4 EACH
208.0300 DEWATERING 1 LS
209.0220 SACK INSERT INLET PROTECTION 15 EACH
212.2200 MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION CONTROLS 1 LS
213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL 700 LF
302.0100 GRAVEL BORROW SUBBASE COURSE 126 CY
303.0100 SPECIAL GRADED AGGREGATE FOR SHAPING AND TRIMMING DRIVEWAYS OR SHOULDERS 36 CY
401.0510 HOT MIX ASPHALT PREPARATION - PARTIAL DEPTH 2550 SY
401.0520 HOT MIX ASPHALT PREPARATION - FULL DEPTH 13850 SY
401.1000 CLASS 19.0 HMA 2025 TON
401.2100 MODIFIED CLASS 12.5 HMA 2025 TON
401.3000 CLASS 9.5 HMA 1 TON
401.3100 MODIFIED CLASS 9.5 HMA 173 TON
406.0200 FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE 13750 SY