0013Q Corridor-Ashaway_DOQ Index Page_1_Addendum-2.pdf

PDF 621 KB Posted

Attached to
Corridor - Ashaway
Solicitation number
TCB26006498
Issued by
Providence County, Rhode Island

About this file

This is an addendum document for a state and local contract opportunity issued by the Rhode Island Department of Transportation for the Corridor-Ashaway project, which involves the replacement of three bridges spanning bodies of water in Providence County. The project includes removal and disposal work (clearing, grubbing, sidewalks, pavement, guardrails, drainage structures, and signage), excavation work (earth excavation of 2,380 cubic yards, rock excavation of 50 cubic yards, and structural excavation), and soil handling (common borrow of 100 cubic yards, contaminated soils, and riverbed material stockpiling of 840 cubic yards). The contract is designated as Rhode Island Contract No. 2026-CB-019 under FAP No. STP3334001. Proposals are due August 28, 2026 at 1:00 p.m. EDT, with vendor questions due by August 19, 2026 at 12:00 p.m. EDT. The project has phased completion deadlines of November 10, 2027 for the Ashaway River Bridge and August 14, 2028 for the Potter Hill Bridge, with substantial completion required by October 23, 2028. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion milestones.

The project is federally funded under the Federal-Aid Highway program with 80% HFWA funding and 20% state funding. All work is subject to Davis-Bacon prevailing wage requirements effective May 18, 2026, and Buy America compliance mandates 55 percent domestic content for manufactured products with a $2,500 threshold for foreign materials. Bidders must submit proposals electronically through Ocean State Procures and provide a 5% bid bond and 100% performance bond. Required insurance includes $1,000,000 general liability and workers' compensation coverage. Lump sum item breakdowns are due within 70 days of apparent low bidder notification. A 0.33% contract administrative fee applies to the award.

View the file

Other files

File Type Posted
2026-CB-019_Plan_File_V1.pdf PDF
2026-CB-019_Plan_File_V2.pdf PDF
TCB26006498_Sep_11_26_solicitation_doc.pdf PDF
TCB26006498_Oct_2_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 401.3000_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_2_Addendum-2.pdf PDF
TCB26006498_Oct_15_26_solicitation_doc.pdf PDF
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf.crdownload CRDOWNLOAD file
Federal Wage Rates 5-18-2026.pdf PDF
2026-CB-019-Corridor-Ashaway_JS_Pages.pdf PDF
TCB26006498_Sep_10_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 841.0100_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0417_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_5_Addendum-2.pdf PDF
TCB26006498_Oct_8_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_4_Addendum-2.pdf PDF
TCB26006498_Oct_16_26_solicitation_doc.pdf PDF
TCB26006498_Sep_16_26_solicitation_doc.pdf PDF
0013Q_V2_015_52_BEAMDETL_REV1.pdf PDF
0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0432_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 203.0310_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf PDF
TCB26006498_Oct_9_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_CS Pages CS-11_Addendum-2.pdf PDF
2026_February_Standard_Specifications.zip.crdownload CRDOWNLOAD file
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf PDF
TCB26006498_Aug_3_26_solicitation_doc.pdf PDF
TCB26006498_Aug_31_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 920.0330_Addendum-2.pdf PDF
TCB26006498_Oct_6_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0403_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ BR005151_Addendum-2.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Code Description Quantity UOM

201.0321 CLEARING AND GRUBBING 100 SY

201.0403 REMOVE AND DISPOSE SIDEWALKS 400 SY

201.0406 REMOVE AND DISPOSE HIGHWAY BOUNDS 2 EACH

201.0414 REMOVE AND DISPOSE PIPE - ALL SIZES 425 LF

201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 725 LF

201.0417 REMOVAL AND DISPOSAL OF PAVEMENT 1140 SY

201.0428 REMOVE AND DISPOSE FRAME AND GRATE OR FRAME AND COVER 14 EACH

201.0432 REMOVE AND DISPOSE HEADWALL 2 EACH

201.0436 REMOVAL AND DISPOSAL OF CURBING 820 LF

201.0437 REMOVAL AND DISPOSAL OF DRAINAGE AND UTILITY STRUCTURES 8 EACH

201.0438 REMOVAL AND DISPOSAL OF FENCES AND RAILINGS 15 LF

201.0610 REMOVE AND DISPOSE DIRECTIONAL, WARNING, REGULATORY, SERVICE, AND STREET SIGNS 11 EACH

201.9901 REMOVE AND STOCKPILE BRIDGE CLOSURE TRAFFIC DEVICES 1 LS

202.0100 EARTH EXCAVATION 2380 CY

202.0201 ROCK EXCAVATION MECHANICAL 50 CY

202.0700 COMMON BORROW 100 CY

202.9901 CONTAMINATED SOILS 100000 EACH

202.9902 STOCKPILE AND PLACE RIVERBED MATERIAL 840 CY

203.0100 STRUCTURAL EXCAVATION EARTH 1195 CY

203.0310 STRUCTURAL EXCAVATION MASONRY 50 CY

Distribution of Quantities

0013Q Corridor - Ashaway

Estimate Name - PS&E Estimate

R.I. Contract No. - 2026-CB-019

FAP No. STP3334001 joseph.skymba Cloud joseph.skymba Cloud joseph.skymba Cloud joseph.skymba Cloud joseph.skymba Stamp

File details come from the government source that posted it. Updated .