0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf
PDF 618 KB Posted
- Attached to
- Corridor - Ashaway
- Solicitation number
- TCB26006498
- Issued by
- Providence County, Rhode Island
About this file
This is an Addendum document for the Corridor-Ashaway project prepared by the Rhode Island Department of Transportation (RIDOT), detailing item specifications and calculations for clearing and grubbing work. The addendum specifies work locations across three areas: Potter Hill Road (STA 302+26 to 302+48, right side, 82 SF), Laurel Street (STA 105+12 to 105+78, left side, 150 SF), and Laurel Street (STA 105+65 to 105+95, right side, 305 SF). The combined total of 537 square feet converts to 60 square yards, with a stated quantity of 100 square yards for clearing and grubbing. The document was computed by PJP, checked by OEL, and dated August 27, 2026, with proposals due August 28, 2026 at 1:00 p.m. EDT.
The Corridor-Ashaway project involves replacement of three bridges in Providence County, Rhode Island, funded through the Federal-Aid Highway program with 80% FHWA funding and 20% state funding (FAP Number STP-3334(001)). All work is subject to Davis-Bacon prevailing wage requirements and Buy America compliance mandates requiring 55% domestic content for manufactured products. Phased completion deadlines include November 10, 2027 for the Ashaway River Bridge and August 14, 2028 for the Potter Hill Bridge, with substantial completion by October 23, 2028. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion milestones. A 5% bid bond and 100% performance bond are required, along with $1,000,000 general liability insurance and workers' compensation coverage. A 0.33% contract administrative fee applies to the project.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Calculation Computed by: PJP Subject: 0013Q Corridor - Ashaway
Sheet Checked by: OEL Client: RIDOT
60752601 60752601 Date: 8/27/2026
Item No.
201.0321
STA TO STA SIDE
POTTER HILL RD 302+26 - 302+48 RT 82 SF
LAUREL ST 105+12 - 105+78 LT 150 SF
LAUREL ST 105+65 - 105+95 RT 305 SF
SUBTOTAL 537 SF
(SF/9) 60 SY
SAY 100 SY
Description Unit
CLEARING AND GRUBBING SY
joseph.skymba Cloud joseph.skymba Stamp
File details come from the government source that posted it. Updated .