0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf
PDF 1 MB Posted
- Attached to
- Corridor - Ashaway
- Solicitation number
- TCB26006498
- Issued by
- Providence County, Rhode Island
About this file
This is a general plan document from the Rhode Island Department of Transportation for the Corridor-Ashaway highway project, which involves the replacement of three bridges in Providence County. The project encompasses Bridge No. 005051 (butted box beam), Bridge No. 005151 (concrete arch), and Bridge No. 005251 (butted box beam), all spanning bodies of water. The scope of work includes bridge demolition, foundation construction with piles and micropile systems, prefabricated structural steel tub girders, ultra-high-performance concrete closure pours, abutment and pier construction, deck systems, utility relocations including gas mains, drainage structures, stormwater treatment systems, erosion control measures, ADA-compliant accessibility improvements, guardrails, landscaping, and asphalt and concrete placement. Phased completion deadlines are November 10, 2027 for the Ashaway River Bridge and August 14, 2028 for the Potter Hill Bridge, with substantial completion required by October 23, 2028. Proposals are due August 28, 2026 at 1:00 p.m. EDT through Ocean State Procures, with vendor questions due August 19, 2026 at 12:00 p.m. EDT. Lump sum item breakdowns are due within 70 days of apparent low bidder notification, and prefabricated bridge units require detailed shop drawings with 1/4-inch placement tolerances for width and 1/8-inch for bearing elevation.
The project is federally funded under the Federal-Aid Highway program with 80% HFWA funding and 20% state funding (FAP Number STP-3334(001)). All work is subject to Davis-Bacon prevailing wage requirements effective May 18, 2026, and Buy America compliance mandates 55 percent domestic content for manufactured products with a $2,500 or 0.1 percent contract value threshold for foreign materials. A 5% bid bond and 100% performance bond are required, along with required insurance of $1,000,000 general liability and workers' compensation coverage. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion milestones. A 0.33% contract administrative fee applies to the project total.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6-100
6-101 6-103
6-201
6-200
6-202
6-300 6-301
6-302
6-400
6-401
6-402
6-403
6-305
6-306 6-307
6-308 6-309
6-310 6-311
POTTER HILL ROAD
PAWCATUCK RIVER
R
IV
ER
MAXSON STREET
R O
AD
FLORA
WHITELY
PRESERVE
LIMIT OF WORK
WESTERLY
HOPKINTON
W
ES
TE
R
LY
H
O
PK
IN
TO
N
PROJECT BEGIN
R.I. CONTRACT NO. 2026-DB-019
R.I. FAP NO. STP3334001
POTTER HILL ROAD STA 300+83
SEE WCR DETAIL F
NO. 4 (SHEET NO. 12)
SEE WCR DETAIL G
NO. 4 (SHEET NO. 12)
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
HIGHWAY
CORRIDOR - ASHAWAY
HOPKINTON
GENERAL PLAN NO. 1
POTTER HILL ROAD
M
AT
C H
LI
N
E
TO
G
EN
ER
AL
P
LA
N N
O . 2
ADDENDUM NO. 2
| Sheets and Views |
| GENERAL PLAN NO. 1 |
File details come from the government source that posted it. Updated .