0013Q Corridor-Ashaway_DOQ Item 401.3000_Addendum-2.pdf

PDF 621 KB Posted

Attached to
Corridor - Ashaway
Solicitation number
TCB26006498
Issued by
Providence County, Rhode Island

About this file

This addendum document is associated with the Corridor-Ashaway project managed by the Rhode Island Department of Transportation (RIDOT). The addendum addresses contingency provisions for Item 401.3000, specifying 1.0 ton of Class 9.5 Hot Mix Asphalt (HMA) as a contingency allocation. The document was calculated by PJP, checked by OEL, and dated August 27, 2026, reflecting final quantity computations for this bid item prior to the August 28, 2026 proposal submission deadline. This contingency material is part of the broader three-bridge replacement project spanning bodies of water in Providence County, which includes bridge demolition, foundation work, prefabricated structural steel components, and asphalt placement across multiple work locations.

The addendum establishes the contingency HMA quantity as 56 of 135 units, indicating this represents one component within a larger material schedule. The Class 9.5 HMA specification is standard for wearing course applications on bridge approaches and roadway surfaces associated with the project's phased completion timeline, with the Ashaway River Bridge due November 10, 2027 and the Potter Hill Bridge due August 14, 2028. This contingency provision allows contractors flexibility for unforeseen conditions during construction while maintaining budget controls aligned with the federally-funded project structure utilizing 80% FHWA funding and 20% state funding under FAP Number STP-3334(001).

View the file

Other files

File Type Posted
2026_February_Standard_Specifications.zip.crdownload CRDOWNLOAD file
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf PDF
TCB26006498_Aug_3_26_solicitation_doc.pdf PDF
TCB26006498_Aug_31_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 920.0330_Addendum-2.pdf PDF
TCB26006498_Oct_6_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0403_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ BR005151_Addendum-2.pdf PDF
2026-CB-019_Plan_File_V1.pdf PDF
2026-CB-019_Plan_File_V2.pdf PDF
TCB26006498_Sep_11_26_solicitation_doc.pdf PDF
TCB26006498_Oct_2_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_2_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_1_Addendum-2.pdf PDF
TCB26006498_Oct_15_26_solicitation_doc.pdf PDF
TCB26006498_Sep_16_26_solicitation_doc.pdf PDF
0013Q_V2_015_52_BEAMDETL_REV1.pdf PDF
0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0432_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 203.0310_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf PDF
TCB26006498_Oct_9_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_CS Pages CS-11_Addendum-2.pdf PDF
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf.crdownload CRDOWNLOAD file
Federal Wage Rates 5-18-2026.pdf PDF
2026-CB-019-Corridor-Ashaway_JS_Pages.pdf PDF
TCB26006498_Sep_10_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 841.0100_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0417_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_5_Addendum-2.pdf PDF
TCB26006498_Oct_8_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_4_Addendum-2.pdf PDF
TCB26006498_Oct_16_26_solicitation_doc.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Calculation Computed by: PJP Subject: 0013Q Corridor - Ashaway

Sheet Checked by: OEL Client: RIDOT

60752601 60752601 Date: 8/27/2026

Item No.

401.3000

FOR CONTINGENCY 1.0 TON

SAY 1 TON

Description Unit

CLASS 9.5 HMA TON

joseph.skymba Rectangle joseph.skymba Cloud joseph.skymba Stamp joseph.skymba Highlight

File details come from the government source that posted it. Updated .