This is an addendum document for the Corridor-Ashaway project issued by the Rhode Island Department of Transportation (RIDOT). The addendum provides detailed calculations for Item No. 201.0417, which concerns the removal and disposal of pavement. The calculation sheet, computed by CSC and checked by RJK on August 27, 2026, specifies measurements derived from driveway areas (8,145 square feet) and FDP-3 areas (1,000 square feet), with additional dimensions of 20 feet width and 50 feet length. The total calculated area is 10,145 square feet, which converts to 1,127 square yards, with a final specified quantity of 1,140 square yards for pavement removal and disposal work.

The project involves the replacement of three bridges in Providence County spanning bodies of water, with 80% federal funding through the Federal-Aid Highway program and 20% state funding. All work is subject to Davis-Bacon prevailing wage requirements and Buy America compliance mandates requiring 55 percent domestic content for manufactured products. Project deadlines include November 10, 2027 for the Ashaway River Bridge and August 14, 2028 for the Potter Hill Bridge, with substantial completion by October 23, 2028. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion. Bid submissions were due August 28, 2026 at 1:00 p.m. EDT, with vendor questions required by August 19, 2026 at 12:00 p.m. EDT. A 5% bid bond and 100% performance bond are required, along with $1,000,000 in general liability insurance and workers' compensation coverage, with a 0.33% contract administrative fee applicable.

View the file

Other files

File Type Posted
2026-CB-019_Plan_File_V1.pdf PDF
2026-CB-019_Plan_File_V2.pdf PDF
TCB26006498_Sep_11_26_solicitation_doc.pdf PDF
TCB26006498_Oct_2_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 401.3000_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_2_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_1_Addendum-2.pdf PDF
TCB26006498_Oct_15_26_solicitation_doc.pdf PDF
TCB26006498_Sep_16_26_solicitation_doc.pdf PDF
0013Q_V2_015_52_BEAMDETL_REV1.pdf PDF
0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0432_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 203.0310_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf PDF
TCB26006498_Oct_9_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_CS Pages CS-11_Addendum-2.pdf PDF
2026_February_Standard_Specifications.zip.crdownload CRDOWNLOAD file
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf PDF
TCB26006498_Aug_3_26_solicitation_doc.pdf PDF
TCB26006498_Aug_31_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 920.0330_Addendum-2.pdf PDF
TCB26006498_Oct_6_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0403_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ BR005151_Addendum-2.pdf PDF
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf.crdownload CRDOWNLOAD file
Federal Wage Rates 5-18-2026.pdf PDF
2026-CB-019-Corridor-Ashaway_JS_Pages.pdf PDF
TCB26006498_Sep_10_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 841.0100_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_5_Addendum-2.pdf PDF
TCB26006498_Oct_8_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_4_Addendum-2.pdf PDF
TCB26006498_Oct_16_26_solicitation_doc.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Calculation Computed by: CSC Subject: 0013Q Corridor - Ashaway

Sheet Checked by: RJK Client: RIDOT

60752601 60752601 Date: 8/27/2026

Item No.

201.0417

From Driveway Areas 8145 SF

From FDP-3 Areas 1000 SF

Width 20 FT

Length 50 FT

Area 1000 SF 1000 SF

Subtotal 10145 SF

(SF/9) 1127 SY

SAY 1140 SY

Description Unit

REMOVAL AND DISPOSAL OF PAVEMENT SY

joseph.skymba Cloud joseph.skymba Stamp

File details come from the government source that posted it. Updated .