0013Q Corridor-Ashaway_DOQ Item 841.0100_Addendum-2.pdf

PDF 617 KB Posted

Attached to
Corridor - Ashaway
Solicitation number
TCB26006498
Issued by
Providence County, Rhode Island

About this file

This addendum document pertains to the Corridor-Ashaway bridge replacement project managed by the Rhode Island Department of Transportation. The project encompasses the replacement of three bridges (Bridge No. 005051, a butted box beam; Bridge No. 005151, a concrete arch; and Bridge No. 005251, a butted box beam) spanning bodies of water in Providence County. The scope of work includes bridge demolition, foundation work with piles and micropile systems, prefabricated structural steel tub girders, ultra-high-performance concrete closure pours, abutment and pier construction, deck systems, utility relocations including gas mains, drainage structures, stormwater treatment systems, erosion control measures, ADA-compliant accessibility improvements, guardrails, landscaping, and asphalt and concrete placement. Sealed proposals are due August 28, 2026 at 1:00 p.m. EDT through Ocean State Procures. Vendor questions must be submitted by August 19, 2026 at 12:00 p.m. EDT. Phased completion deadlines include November 10, 2027 for the Ashaway River Bridge and August 14, 2028 for the Potter Hill Bridge, with substantial completion required by October 23, 2028. Liquidated damages are assessed at $3,500 per day for phase completions and $1,950 per day for substantial completion milestones.

The project is federally funded under the Federal-Aid Highway program with 80% Federal Highway Administration funding and 20% state funding (FAP Number STP-3334(001)). All work is subject to Davis-Bacon prevailing wage requirements effective May 18, 2026, and Buy America compliance mandates a minimum domestic content of 55 percent for manufactured products, with foreign materials subject to a minimal use threshold of $2,500 or 0.1 percent of contract value. Bidders must provide a 5% bid bond and 100% performance bond. Required insurance includes $1,000,000 general liability coverage and workers' compensation insurance. A 0.33% contract administrative fee applies. Lump sum item breakdowns are due within 70 days of apparent low bidder notification. Prefabricated bridge units require detailed shop drawings, welding procedures, and quality documentation with strict placement tolerances of 1/4-inch for width and 1/8-inch for bearing elevation.

View the file

Other files

File Type Posted
TCB26006498_Sep_16_26_solicitation_doc.pdf PDF
0013Q_V2_015_52_BEAMDETL_REV1.pdf PDF
0013Q_V1_ 013-023_GENERAL PLAN NO. 1_REV1.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0432_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 203.0310_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0321_Addendum-2.pdf PDF
TCB26006498_Oct_9_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_CS Pages CS-11_Addendum-2.pdf PDF
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf.crdownload CRDOWNLOAD file
Federal Wage Rates 5-18-2026.pdf PDF
2026-CB-019-Corridor-Ashaway_JS_Pages.pdf PDF
TCB26006498_Sep_10_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0417_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_5_Addendum-2.pdf PDF
TCB26006498_Oct_8_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_4_Addendum-2.pdf PDF
TCB26006498_Oct_16_26_solicitation_doc.pdf PDF
2026-CB-019_Plan_File_V1.pdf PDF
2026-CB-019_Plan_File_V2.pdf PDF
TCB26006498_Sep_11_26_solicitation_doc.pdf PDF
TCB26006498_Oct_2_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 401.3000_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_2_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ Index Page_1_Addendum-2.pdf PDF
TCB26006498_Oct_15_26_solicitation_doc.pdf PDF
2026_February_Standard_Specifications.zip.crdownload CRDOWNLOAD file
2026-CB-019-Corridor-Ashaway_CS_Pages.pdf PDF
TCB26006498_Aug_3_26_solicitation_doc.pdf PDF
TCB26006498_Aug_31_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 920.0330_Addendum-2.pdf PDF
TCB26006498_Oct_6_26_solicitation_doc.pdf PDF
0013Q Corridor-Ashaway_DOQ Item 201.0403_Addendum-2.pdf PDF
0013Q Corridor-Ashaway_DOQ BR005151_Addendum-2.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Calculation Computed by: PJP Subject: 0013Q Corridor - Ashaway

Sheet Checked by: OEL Client: RIDOT

60752601 60752601 Date: 8/27/2026

Item No.

841.0100

1 LS

Description Unit

PRE AND POST CONSTRUCTION CONDITION SURVEYS LS

joseph.skymba Cloud joseph.skymba Stamp

File details come from the government source that posted it. Updated .